Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.3 L+₹47,272.20 (8.15%)Rejected-Finance 1101 A WING SACHDEV COMPLEX JANGAL MANGAL RAOD BHANDUP W MUMBAI 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | L2 | Rejected-Finance NOT L1 |
Tender Value
₹7.1 L
EMD Value
₹14,500
Closing Date
25 Sept 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COL VIKAS KESARWANI
CWE AF LOHEGAON, PUNE - 411032
REPAIR, MAINTENANCE OF HIGH TENSION DISTRIBUTION SYSTEM AND HT EQUIPMENTS AT KANHERI HILLS AND HILL TOP AT SITE K HILLSUNDER GE (AF) THANE
2023_MES_616221_1
82651/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE AF THANE
As per NIT
6 documents required · 6 mandatory
₹500
Yes
GE AF THANE
₹14,500
Yes
4 Nov 2023
29 Aug 2023
2 Oct 2023
29 Aug 2023
25 Sept 2023
12 Sept 2023
Amount
M & L for Indicator LED Lamp, Red, Yellow and Orange 110 V, AC, for HT 22 KV VCB complete all as specified and directed.
Supply Closing Coil,110 V, DC for servicing/repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge
Supply Shunt release coil on 110 V, DC & VI bottle for quenching of HV 22 KV arc suitable for repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Shunt release off, 110 V ,DC, suitable for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Control Fuse, HRC, 2/4/6 Amp for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Motor cut off switch for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply HT Tape for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge
Supply Monoplast Tape for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge
Supply Digital volt meter 96x96mm,0-500V,Aux supply 110V,AC,suitable for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge
Supply Digital Ammeter suitable for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge
Supply Auxiliary switch on block magnet for servicing /repairing the HT 22KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Male & female Spout (Jaw Contact) for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply CT of ratio 50/5 A for VCB suitable for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Over Current relay suitable for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge
Supply Master trip relay suitable for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge
Supply Digital VAF meter, EM 6400 suitable for HT 22 KV VCB for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Contact arm assembly for HT 22 KV VCB for servicing /repairing the HT 22 KV VCB complete all as specified and as directed by the Engr- in- Charge
Supply Closing Coil, 110V, DC for servicing /repairing the HT 11 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Shunt release on, 110V, DC for servicing /repairing the HT 11 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Shunt release off, 110V, DC for servecing /repairing the HT 11 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Motor cut off switch for servicing /repairing the HT 11 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Auxiliary switch on block magnet for servicing /repairing the HT 11 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Male & Female Spout assembly for servicing /repairing the HT 11 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply CT of ratio 30/5 A for VCB for servicing /repairing the HT 11 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Relay Assembly (current, voltage) suitable for servicing /repairing the HT 11 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Master trip relay suitable for servicing /repairing the HT 11 KV VCB complete all as specified and as directed by the Engr- in- Charge.
Supply Contact arm assembly for servicing /repairing the HT 11 KV VCB complete all as specified and as directed by the Engr- in- Charge.
M&L for Servicing/ testing of Transformer11/ 22/0.44 kv up to capacity 500KVA (a) IR Value of Winding. (b) De carbonizing the cable terminal of the Transformer. (c) Earth Resistance Checking. (d) Replacement of silica Gel
Dehydration/filtration of transformer oil by means of centrifugal filtration plant to achieve the specified dielectric strength of 35 to 40 KV at 2.5 mm gap in existing position of transformer/servo stabilizer of any capacity and transformer oil for topping up at various sub station all as directed. Note: Transformer oil used for TOP UP measured and paid separately.
Supply and pouring of new transformer oil to achieve a di-electric strength up to 60 KV in 4 mm gap conform to IS-335-1983 with sealed barrel
M & L for Disconnection the HT termination, supply and fixing HT Boot cover at cable end and VCB/RMU all as directed .
Disconnecting all in coming and outgoing cables, removing the transformer/Servo stabilizer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size taping the bushes / bus bars, using insulation tape and testing complete of capacity 160 kva to 500 kva all as directed . Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding,dehydration of oil shall be measured and paid separately in respective items.
M&L for taking out unserviceable winding & Supply and winding of 22/0.433 KV HV coils, using new copper wire/strip of proper size including insulating materials (double insulation)as per existing size of core of transformer capacity upto 500 KVA complete including heating , varnishing all as directed .
M&L for taking out unserviceable winding Supply and winding of 22/0.433 KV LV coils, using new copper wire/strip of proper size including insulating materials (double insulation)as per existing size of core of transformer complete incl heating , varnishing all as directed .
Supply only breather assembly of approved make filled with silica gel suitable for transformer of capacity upto 500 KVA Volt Distribution transformer.
Supply only brass spindle for terminal on HT side threaded complete with nut washers etc of suitable dia for transformer capacity upto 500 KVA.
Supply only brass spindle for terminal on LT side threaded complete with nut, washers etc of suitable dia for transformer capaicty upto 500 KVA.
Supply and fix ceramic bushing and gasket on LT side of transformer capacity upto 500 KVA 22000/433 Volt distribution transformer complete all as specified and directed by Engg-in-Charge
S & F ceramic HV bushing with gun metal bushing stud, nuts and washers for transformer of capacities 22000/433 Volt Distribution transformer
Supply and fixing in replacement of complete gasket (Cork sheet) 6 mm thick complete of capacity of 160 KVA to 500 KVA transformer including conical rubber bush.
Disconnecting all incoming and outgoing connection of HT11/22 KV underground cable, Detecting fault by applying surge current 1.5 times the rated current & finding exact location of fault with PICCO equipment and repair the same immediately all as directed. Note:-(a) Necessary jointing kit and cable to be measure and paid separetely.
Supplying, jointing and commissioning outdoor type cable end termination cable jointing kit (Earth) heat shrinkable type suitable for underground XLPE cable size 3 core 95 to 120 Sqmm 11/22 KV HT cable all as specified and directed .
Supplying, jointing and commissioning indoor type cable end termination cable jointing kit (Earth) heat shrinkable type suitable for under ground XLPE cable size 3 core 95 to 120 Sqmm 11/22 KV HT cable all as specifide and directed .
Supplying, jointing and commissioning straight through type cable end termination cable jointing kit (Earth) heat shrinkable type suitable for underground XLPE cable size 3 core 95 Sqmm 11/22 KV HT cable all as specified and directed .
Taking up unserviceable HT 22/11 KV underground cable for repair, replace the damage portion all as directed
Supply and laying, testing and commissioning H.T. under ground armored PVC insulated and PVC sheathed heavy duty 22000 Volts (Earth) grade underground cable of size 3 core, 95 Sq mm complete all as specified and as directed
Supply and laying, testing and commissioning H.T. under ground armored PVC insulated and PVC sheathed heavy duty 11000 Volts (Earth) grade underground cable of size 3 core, 120 Sq mm complete all as specified and as directed
M & L for Relaying the serviceable HT cable, after necessary testing in ground, floor in same trench or new route all as directed.
Supply and fix GI pipe 100 mm dia light grade complete with all fitting for supporting cable on four pole structure complete all as specified and directed.
M & L for Excavation in trenches not exc 1.5 m in depth and not exc 1.5 m wide for taking out/laying cable and getting out in Hard/dense soil complete all specified/directed
M & L for Removing excavation soil at a distance not exc 50 m and deposited where diverted complete all as directed
M & L for Returning, filling in including spreading, leveling, watering and well rumming in layers not exc 25 cm complete all as directed
M & L for Sand cushioning for cable protection by spreading in trenches crushed stone sand by gently punning down manually. Note:- Punnned thickness shall only be measured and paid.
Supply and laying un reinforced precast concrete cable cover class EHV, type-I, flat size 300 mm x 180 mm x 40 mm laid in trenches.
Re- laying un reinforced precast concrete cable cover class HT, type-I, flat size 300 mm x 180 mm x 40 mm laid in trenches.
Supply and cross arm, bracing, supports, clamps and back plate fabricated from structural steel section including nuts, bolts, washers,welding, bending, drillingholes for bolts in any shape and any size inclusive of one primer coat, two coats of aluminium paints as indicateed complete all as specified and as directed by Engineer in charge
M&L for PT 22 KV /110V suitable for HT 22KV vertical draw out type VCB of rupturing capacity 250 MVA, 250 Amps for metering purpose complete all as specified.
M&L for PP Tubes suitable for HT 22KV vertical draw out type VCB of rupturing capacity 250 MVA, 250 Amps along with necessary accessories complete all as specified and as directed.
M&L for Heater and Thermostat suitable for HT 22KV vertical draw out type VCB of repturing capacity 250 MVA, 250 Amps complete all as specified and as directed
M&L for bushing spout panel HT 22KV vertical draw out type VCB of repturing capacity 250 MVA, 250 Amps complete all as specified and as directed
M&L for TNC switch suitable for HT 22KV vertical draw out type VCB of repturing capacity 250 MVA, 250 Amps complete all as specified and directed
S&F in replacement Single phase SMPS based battery backed power pack for Supply Back-up for trip Coil,Protection Relay,Indication,& other Load in HT Panels, working input voltage 90 to 300 Volt AC, output 110 Volts DC with backup for 15-20 min, complete all as specified and as directed.
M&L for Painting of transformer after cleaning the body surface of transformer by rubbing with emery paper to remove oil stains,dust etc and applying one coat of synthetic enamel paint by spray paint incl writing SM No/MES No of capacity 160 KVA to 250 KVA Transformer completeall as specified and directed by Eng.in.Charge.
M&L for HT 22 KV Sleeve for repairing VCB 22 KV cpmplete all as specified and as directed
sapana enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .