Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹7.1 Laccepted-aoc | ₹7.1 L | accepted-aoc |
Tender Value
₹6.7 L
EMD Value
₹6,730
Closing Date
5 Aug 2026, 5:00 pmClosed
Executive Engineer Irr Div no 2 Hanumakonda
O/o IRRIGATION DIVISION NO.02, NAKKALAGUTTA, HANUMAKONDA
O and M Improvements to the bund and construction of Irrigation channel of Kota cheruvu, Enumamula (V) Warangal (M) Warangal District(4th Call)
722141
06/2026-27, Date: 20.06.2026
OPEN
Civil Engineering Works
WARANGAL (URBAN)
7 documents required · 7 mandatory
₹238
₹6,730
18 Aug 2026
28 Jul 2026
29 Jul 2026
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete.
Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation,sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,watering, compacting to density control of not less than 95 percent or as stipulated using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Depth upto 3 m.
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum
Rupees Six lakhs Seventy two thousand two hundred and ninety only
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender book -Kota cheruv, Enumamula.docx
TENDER_DOCUMENT • 0.52 MB
BOQ-Kota cheruvu, Enumamula.xls
TENDER_DOCUMENT • 0.57 MB
NIT-Kota cheruvu, Enumamula.docx
TENDER_DOCUMENT • 0.13 MB
Schedule A-Kotas cheruvu, Enumamula.xls
TENDER_DOCUMENT • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .