Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹5.5 LAccepted-AOC | l1 | Accepted-AOC Qualify in Financial Bid | |
| 2 | 2₹6.2 L+₹60,300 (10.8%)Rejected-AOC | 2 | Rejected-AOC Not Qualify in Financial Bid | |
| 3 | 3₹7.9 L+₹2.3 L (41.3%)Rejected-AOC | 3 | Rejected-AOC Not Qualify in Financial Bid | |
| 4 | 4₹12.6 L+₹7.0 L (125.4%)Rejected-AOC | 4 | Rejected-AOC Not Qualify in Financial Bid |
Tender Value
₹6.7 L
Closing Date
16 Nov 2021, 5:00 pmClosed
Chief Executive Officer, ADMA
Amber Development and Management Authority Old Vidhan Sabha Bhawan, Near Hawa Mahal, Jaipur
Water Proofing Treatment work at Amber Palace, Jaipur
2021_Amber_246468_2
08/2021-22
Open Tender
Civil Works
Item Rate
180 days
Amber Palace
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Chief Executive Officer, ADMA
Yes
15 Feb 2022
10 Nov 2021
17 Nov 2021
10 Nov 2021
16 Nov 2021
10 Nov 2021
Amount
Water Proofing Work by: (A) Cleaning and removing of the existing surface and other loose material over the roof. (B) Application of single coat of R.B. Care's Unisel or equivalent mixed with water in the ration of 1:1 via brush over the surface as a bounding coat and allow the same to air cure for atleast 2 hrs. (C) Application of R.B. Care's two component Uniseal mortar or equivalent two coats (minimum thickness of 90-100 microns each) (dry powder 80% chemical 20% acrylic resin having 52% solid contents) with proper mix proportion of part 1 and 2 via trowel. Allow the coating to air cure for minimum 3 hrs. (D Application of Fibre glass mesh (made up of unylon and plastic with weaving size of 10X10 yarn/inch duly coated with alkanline resistant polymer) along with R.B. Care's Elastomeric Water Proofing Membrance Paste mixed with water in the ration of 5 kg is to 1 litre over the mesh to provide a minimum thickness of 100 merons. (E) Application of R.B. Care's two component Uniseal mortar of equivalent two coats (minimum thickness of 90-100 microns each) (dry powder 80% chemical 20% aerylic resin having 52% solid dontents) with proper mix proportion of Part 1 and 2 via trowel. Allow the coating to air cure for minimum 3 hrs.
M/s M Y CONSTRUCTION
MEGHA CONSTRUCTION CO
CHEM COATING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .