Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.2 LAccepted-Finance S O GHULAM MOHD R O BOGDANG | L1 | Accepted-Finance As per BOQ Comparative | |
| 2 | L1₹23.2 LAccepted-Finance LADAKH AUTONOMOUS HILL DEVELOPMENT COUNCIL LEH OFFICE OF THE EXECUTIVE ENGINEER RURAL ENGINEERING WING LEH | L1 | Accepted-Finance As per BOQ Comparative | |
| 3 | L2₹24.1 L+₹83,000 (3.57%)Accepted-Finance | L2 | Accepted-Finance As per BOQ Comparative | |
| 4 | L3₹28.8 L+₹5.6 L (23.9%)Accepted-Finance | L3 | Accepted-Finance As per BOQ Comparative | |
| 5 | L4₹30.1 L+₹6.8 L (29.4%)Accepted-Finance R O BOGDANG | L4 | Accepted-Finance As per BOQ Comparative |
Tender Value
₹33.2 L
EMD Value
₹66,400
Closing Date
5 Jul 2021, 4:00 pmClosed
Executive Engineer SSD Nobra
Office of the Executive Engineer SSD Nobra
Construction of link road to Terchay village by way of earth work in filling 1.0 mtr span Rcc Culvert PCC side drain etc towards Lhung.Under Capex.
2021_PWD_3393_1
SSD/N/32 of 2021-22
Open Tender
Civil Works - Roads
Item Rate
90 days
Nobra
Please refer to tender document.
6 documents required · 6 mandatory
₹1,000
Yes
Payable To Executive Engineer SSD Nobra
₹66,400
Yes
19 Jul 2021
15 Jun 2021
7 Jul 2021
15 Jun 2021
5 Jul 2021
15 Jun 2021
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m.
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work upto plinth level1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Nallah(incl carriage of cement )
Reinforcement cement concrete works (any thickness)including attached pilaster buttresses plinth and string course filled columns pillars,piers,abutment,posts and struts etc upto floor five level excluding the cost of centering shuttering finishing and reinforcement all work upto plinth level 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size). (incl carriage of cement )
Reinforcement for RCC work incl. straightening, cutting, bending, placing in position and binding all complete (thermo Mechanically treated bars). Including cost of materials and carriage.
Centering and shuttering including strutting, propping etc and removal of form for. a. Foundations, footing bases of columns etc. for mass concrete.
b. Columns, pillars, piers, abutments, posts and struts.
c. Suspended floors roofs, landings balconies and access platform
d. Edges of slab and breaks in floors and walls.(under 20cms wide)
Random rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at plinth level with : Cement mortar 1:6 (1 cement : 6 fine sand)incl cost cement carriage.(incl carriage of cement )
Removal of local fencing from road alignment.
Dry random rubble masonry with hard stone in foundation and plinth:Without bond stone Nallah
Random rubble masonry with hard stone in foundation and plinth in mud mortor.
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete incl cost of cement carriage.
providing and laying of MS pipe for x-ing including trench excavation laying of pipe in proper slope refilling and making the surface good in carriage and cost of pipe complete job.(250mm dia).
Carriage of materials by M.T from source to site loading, unloading complete job. a. Sand and stone agg 05 km.
b. Stone an avg lead 10 km
c. Earth an avg lead 3 km
M/S MOHAMMAD IBRAHIM
M/S MOHD SASDI
phunchok tundup
M/S MOHD ISSAQ
M/S SONAM STOBDAN
M/S GHULAM HAIDER GOVT HAIDER
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .