| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹37.9 LAccepted-Finance | ₹37.9 L | 1st | Accepted-Finance 1st Lowest |
| 2 | 2nd₹38.5 LAccepted-Finance | ₹38.5 L | 2nd | Accepted-Finance 2nd Lowest |
| 3 | 3rd₹38.5 LAccepted-Finance | ₹38.5 L | 3rd | Accepted-Finance 3rd Lowest |
Tender Value
₹38.7 L
EMD Value
₹78,000
Closing Date
27 Feb 2026, 2:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Civil Transmission Circle Transmission Building Mohaddipur Gorakhpur
Civil works related to Construction of 01 No 33 KV Railway Bay and shifting of 2X5 MVAR Capacitor Bank works at 132 KV Sub Station Mohaddipur Old Gorakhpur
2026_UPCTL_1115043_1
Short T Notice 30/ECTC/GKP/2025-26
Open Tender
Civil Works
60 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Current Account 39356752800
₹78,000
9 Mar 2026
11 Feb 2026
28 Feb 2026
11 Feb 2026
27 Feb 2026
11 Feb 2026
For Civil works related to Construction of 1 No, 33 KV Railway Bay and Shifting of 2x5 MVAR Capacitor bank Works at 132 S/S Mohaddipur old Gorakhpur.
Please Enable Macros to View BoQ information
B.O.Q For Civil works related to Construction of 1 No, 33 KV Railway Bay and Shifting of 2x5 MVAR Capacitor bank Works at 132 S/S Mohaddipur old Gorakhpur.SOR (05/2024)
Earth work in excavation all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.( 2.6.1)
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.(2.27 )
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. (2.31)
Providing and laying in position cement concrete of 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level.( 4.1.2)
Providing and laying in position cement concrete of 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level.(4.1.8 )
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns ( 4.3.1)
Providing and laying 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :(5.1.2 )
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.( 5.9.1)
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.(5.9.2)
Steel reinforcement for R.C.C. work Thermo-Mechanically Treated bars of grade Fe-500D or more including straightening, cutting, bending, placing in position and binding all complete upto plinth level.( 5.22.6)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand)( 6.1.1)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand)(6.1.2 )
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(CSI No. 10.1)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.( 10.2)
Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. (11.2 )
12 mm cement plaster of mix 1:4 (1 cement: 4 coarse sand) ( 13.4.1)
12 mm cement plaster of mix 1:6 (1 cement: 6 coarse sand) (13.4.2 )
12 mm Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement. ( 13.9.1)
Neat cement punning. (13.18 )
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture(13.62.1 )
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.(15.3)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.in cement mortar. (15.7.4)
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :Of area 3 sq. metres and below.(15.12.1)
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.(15.18)
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of G.S. Sheet. (15.28.1)
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.(15.60)
Supply of welded steel wire fabric of required width having rectangular mesh painted with two or more coats of enamel paint of approved shade over a coat of primer (Priming & Painting to be paid for separately). (16.15.2 )
Welded steel wire fabric fencing with posts of specified material and of standard design placed and embedded in cement concrete blocks 45x45x 60 cm of mix 1:5:10 (1 cement:5 fine sand : 10 graded stone aggregate 40 mm nominal size), every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and struts embedded in cement concrete blocks 70x45x50 cm of the same mix, provided with welded steel wire fabric fixed between the posts fitted and fixed with G.I. staples on wooden plugs or tied to 6 mm bar nibs with G.I. binding wire (cost of posts, welded steel wire fabric, painting, earth work in excavation and concrete to be paid for separately). ( 16.20)
Providing and fixing pre-moulded joint filler in expansion joints of RCC roads / CC pavements after making the joints dust free with high pressure air jet cleaners, all complete as per direction of the Engineer-in-Charge. (Pre-moulded joint fillers shall be made of bitumen hot sealing compound impregnated fibre board having impregnation more than 35%, conforming to IS:1838 for fibre board and IS: 1834 for hot sealing bitumen compound grade A.) (16.45 )
Providing and laying C.C. pavement of mix M-20 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge. (The panel shuttering work shall be paid for separately). (Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). (CSI16.75-16.76)
Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266) 900 mm. long with base plate (75x75x6mm) welded with anchor bolts including its threading upto a length of 10cm. and also supply of a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work. ( 29.13)
Fixing and grouting 28 mm and above dia bolts in proper alignment level and setout with help of a template complete including supply of all labour & T&P etc. required for proper completion of the work.(labour rates only) . ( 29.14)
Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (29.15 )
Fixing and grouting 25 mm and below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (29.16 )
Grouting of vertical or inclined post of pale/chain/security fencing in true level, alignment and in plumb or inclination as required, including cost of all labour, materials and T&P required for proper completion of work. ( Post and concrete for grouting shall be measured separately) ( 29.21)
Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only). ( 29.22)
Fixing of template in position level and alignment for grouting of Anchor bolt in main gantry (labour rate only). (29.23 )
Fixing of template in position level and alignment for grouting of Anchor bolt in auxiliary structure. (labour rate only). (29.24 )
Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). ( 29.25)
Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. ( 29.34)
4.0 cm thick 1:1.5:3 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC (29.36 )
Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm. x 10 mm. including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position. (CSI No. 29.37)
Dismantling of existing pale / security / chain link fencing including post and stacking properly as per direction of the Engineer - in - charge. Including all labour and T&P etc. required for proper completion of the work. (29.38)
Total Rs.
Conditions:
1. All civil work shall be executed according to the approved drawings of UPPTCL.
2. The quantities in BOQ are tentative and may vary up to any extent or be deleted as per the requirement at site.
3. All civil work shall be carried out as per UPPWD/UPPTCL specification.
4. Rates in BOQ are exclusive of CGST,SGST. Labour tax shall be borne by contractor.
5. Pozzlona Portland cement confirming to IS 1489(Part 1) 1991 of approved quality like ACC,Ultra Tech,Birla or equi.shall only be used.
6. Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerence shall be measured at actual weight.
7. In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor.The agreement shall be executed on the approved Bill of Quantity only.
8.Performance Guarantee shall be applicable as per GO 622/23-12-2012-2 Audit/08 dt 08 June 2012.adopted by UPPTCL BOD dated 27.06.2017
9. The 60% amount of bricks available from dismantling shall be reovered @ Rs. 2362.00/thousand + GST from firm /contractor.
10. The 30% amount of bricks available from dismantling shall be reovered as brick ballast @ Rs. 700.00/CuM + GST from firm /contractor.
11. The amount of steel/Chain link/Pale Fencing available from dismantling will be recovered Rs. 20.00/Kg + GST from firm /contractor.
J.E S.D.O
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.26 MB
TD30.pdf
Tender Documents • 0.76 MB
BOQ_2068435.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid