| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹2.5 L (1.80%)Admitted-Finance | ₹1.4 Cr+₹2.5 L (1.80%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹7.7 L (5.43%)Admitted-Finance | ₹1.5 Cr+₹7.7 L (5.43%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹8.0 L (5.68%)Admitted-Finance | ₹1.5 Cr+₹8.0 L (5.68%) | L4 | Admitted-Finance |
| 5 | L5₹3.0 Cr+₹1.6 Cr (112.6%)Admitted-Finance | ₹3.0 Cr+₹1.6 Cr (112.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Aakar Engineers and Contractors L6 | SURYAA CONSTRUCTION L5 | Naresh Chandra Bhatta L2 | ASSTABHUJA ENGG AND CONSTRUCTIONS L4 | M/s Laxmidhar Mohanty L1 | Mihir Kumar Nayak L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Dismantalling the following damaged items of works at any height from the outside/inside of the residential block by any means including removal of unwanted plants, uprooting the bushes ,vegetation from the wall surface,cornice,roof slab, junction of watersupply & sanitary pipeline with disposing off the debrises at degignated place and re-depositing the usefull materials at section or central store,cleaning the side including supply of all labour,T & P ect all complete as directed by engineer in charge ( Excluding GST) | |||||||||
| 1.01 | Dismantalling of damaged Plaster at any height | 15,075 | Each Sqm. | 6 ₹90,450 Lowest | 25 ₹3,76,875 | 15 ₹2,26,125 | 14.4 ₹2,17,080 | 10 ₹1,50,750 | 6 ₹90,450 Lowest |
| 1.02 | DISMANTALLING OF RCC WORK | 22 | Each Cum. | 600 ₹13,200 | 3,500 ₹77,000 | 500 ₹11,000 | 490 ₹10,780 | 700 ₹15,400 | 320 ₹7,040 Lowest |
| 1.03 | DISMANTALLING OF CARNISH/FINS | 1,000 | Each Sqm. | 10 ₹10,000 | 250 ₹2,50,000 | 500 ₹5,00,000 | 55 ₹55,000 | 15 ₹15,000 | 7 ₹7,000 Lowest |
| 1.04 | DISMANTALLING OF OLD GRADING WITH OR WITHOUT LIME TERRACING with debrises etc over the roof surface | 1,180 | Each Sqm. | 10 ₹11,800 | 150 ₹1,77,000 | 50 ₹59,000 | 24 ₹28,320 | 10 ₹11,800 | 4 ₹4,720 Lowest |
| 1.05 | DISMANTALLING OF DOORS ,WINDOWS AND VENTILATORS | 520.56 | Each Sqm. | 40 ₹20,822.4 | 750 ₹3,90,420 | 90 ₹46,850.4 | 29 ₹15,096.24 | 50 ₹26,028 | 25 ₹13,014 Lowest |
| 1.06 | BRICK WORK | 20 | Each Cum. | 600 ₹12,000 | 2,000 ₹40,000 | 200 ₹4,000 | 470 ₹9,400 | 400 ₹8,000 | 120 ₹2,400 Lowest |
| 1.07 | Dismantling of AS flooring/Tile flooring/Wall tiles etc. | 3,595 | Each Sqm. | 8 ₹28,760 | 150 ₹5,39,250 | 8 ₹28,760 | 33 ₹1,18,635 | 10 ₹35,950 | 6 ₹21,570 Lowest |
| 2.00 | Brick work in cement mortar (1:6) in super structure/foudation and plinght using K.B. Bricks having crushing strength between 75 Kg/Cm² to 99Kg/Cm ²OR FLY ASH BRICKS at any height upto 13.00 mtr height in all floors, levels with cost & supply of all materials, labour, T&P, tollage, royalties, taxes, staging, scaffolding, curing, water charges all transportation charges etc. all complete & as per direction of Engineer-in-charge. (Excludicng cost of GST) | 20 | Each Cum. | 5,000 ₹1,00,000 | 6,000 ₹1,20,000 | 3,100 ₹62,000 | 2,862 ₹57,240 Lowest | 4,000 ₹80,000 | 3,050 ₹61,000 |
| 3.00 | Cement conc. (1:3:6) works using 20mm & down size H.B.G. chips for all floors, foundation & plinth etc. of approved quality, mixing as per approved design mix, hoisting, laying, compacting, curing including centring & shuttering with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, Curing, laboratory charges for performing design mix & testing as per relevant IS code etc. all complete as directed by Engineer-in-charge. (Excludicng cost of GST) | 10 | Each Cum. | 5,000 ₹50,000 | 6,500 ₹65,000 | 3,000 ₹30,000 Lowest | 3,600 ₹36,000 | 3,800 ₹38,000 | 3,150 ₹31,500 |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
26 Dec 2020, 5:00 pmClosed
P K Tripathy,EE,R and B,PPT
P K Tripathy,EE,R and B,PPT
Thorough repair to MV Quarters 17 Units, GD-06 Units and GC-36 Units at Madhuban
2020_MoS_598252_2
CE/R and B/Accts-21/20/410
Open Tender
Civil Works
Works
180 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
As per Tender Document and e-TCN
₹1.7 L
Yes
19 Mar 2021
11 Dec 2020
28 Dec 2020
11 Dec 2020
26 Dec 2020
11 Dec 2020
Amount
Dismantalling the following damaged items of works at any height from the outside/inside of the residential block by any means including removal of unwanted plants, uprooting the bushes ,vegetation from the wall surface,cornice,roof slab, junction of watersupply & sanitary pipeline with disposing off the debrises at degignated place and re-depositing the usefull materials at section or central store,cleaning the side including supply of all labour,T & P ect all complete as directed by engineer in charge ( Excluding GST)
Dismantalling of damaged Plaster at any height
DISMANTALLING OF RCC WORK
DISMANTALLING OF CARNISH/FINS
DISMANTALLING OF OLD GRADING WITH OR WITHOUT LIME TERRACING with debrises etc over the roof surface
DISMANTALLING OF DOORS ,WINDOWS AND VENTILATORS
BRICK WORK
Dismantling of AS flooring/Tile flooring/Wall tiles etc.
Brick work in cement mortar (1:6) in super structure/foudation and plinght using K.B. Bricks having crushing strength between 75 Kg/Cm² to 99Kg/Cm ²OR FLY ASH BRICKS at any height upto 13.00 mtr height in all floors, levels with cost & supply of all materials, labour, T&P, tollage, royalties, taxes, staging, scaffolding, curing, water charges all transportation charges etc. all complete & as per direction of Engineer-in-charge. (Excludicng cost of GST)
Cement conc. (1:3:6) works using 20mm & down size H.B.G. chips for all floors, foundation & plinth etc. of approved quality, mixing as per approved design mix, hoisting, laying, compacting, curing including centring & shuttering with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, Curing, laboratory charges for performing design mix & testing as per relevant IS code etc. all complete as directed by Engineer-in-charge. (Excludicng cost of GST)
25mm. thick A.S. flooring in cement concrete (1:2:4) at all floors & levels using 10mm. and down grade hard granite chips of approved quality including mixing, hoisting, laying, consolidating, curing, by water tanker, finished smooth to the exposed surface with a floating coat of cement punning, rounding the corners where found necessary including cost of supply of all materials, labour, T&P, taxes, tollage, royalties, transportation charges, etc. complete & as per direction of Engineer-in-charge. (Excluding cost of GST)
16 mm thick cement platering with CM ( 1:6) in all floors at any heigh with supply of all labour, matrials, taxes, Tools & Plants ,scafolding etc all complete as per direction of Engineer in charge . (Excluding cost of GST). The preparation of surface,application mode is described as below.Preparation of surface: The joints should be racked out properly, efflorescence if any shall be removed by brushing and scrapping, the surface then throughly washed and cleaned, kept wet before plastering is commenced. Incase of conc. surface if chemical retarder /hadner has been applied to the formwork the surface shall be roughened by the wire brush all the resulting dust and loose particles cleaned out and care shall be taken that none of the retarder shold be left over the surface. Application: Plastering shall be started from top to bottom . All put log holes shall be properly filled in advance of the plastering as the scafolding is being taken down. To ensure the even thickness and a true surface ,plaster about 150mm x 150mm shall be first applied horizontally and vertically at not more than 2.00 mtr interval in each direction over the entire surface to serve as gauge. The surface at gauge area shall be truely in plane of finished plaster surface. The mortar to the wall then applied betwwen the gauge with trowel .The mortar shall be applied in auniform surface slightly more than the specified thickness ,this should be brought to the true surface by working a wooden straight edge reaching accross the gauge with small upward and way movement.Finally, the surface shall be finished up true thickness and surface with according to the smooth surface. All corners,arrises,angles,chhajjas,cornish,etc shall be truely vertical or horizontal as the case may be and shall be carefully finished. Rounding or chamfering corners arrises provisions of groovesat the junction etc where required shall be done without any extra payment. Such rounding chamfering or grooving shall be carried out with proper templetes or battensto the size required. when suspending the work at the end of the day , the plaster should be left, cut clean to the line both horizontally and vertically. when recommenceing the plaster,the edge of the old work shall be scarped cleaned and weted with cement slurrybefore the plaster is applied to the adjecent area.Plastring work shall be closed at the end of the day on the body of the wall not more than 150mm to any coners or arrises. It shall not be closed on the body of the features such as plasters, bands and cornices nor the corner arrises . Horizontal joints in plaster work shall not also occur on parapet top and coppings as these invariable lead to leakage. The plastering and finishing shall be completedwithin half an hour of adding the water to dry mortar. Curring: The curring shall be done for aperiod of minimum 07 days with sweet water as per any means.
Supplying, fitting ,fixing of well seasoned ,antitermite treated,rought free ,sapwood free,knought free salwood choukath with cost of loading & un-loading stacking at Maintenance stores all complete including cost and supply of all materials, T&P, all taxes, transportation, etc. complete as per direction of Engineer-in-charge. (Excludicng cost of GST), NB: Without painting.
Fitting & fixing of salwood choukaths of doors & windows with C.C.(1:3:6),WI clamps/anchor bolt,coltaring two coats to backside chaukhats including cost of loading & un-loading from departmental stores all complete including cost and supply of all materials, T&P, all taxes, transportation, etc. complete as per direction of Engineer-in-charge.(Excludicng cost of GST) .
Supplying of 30mm thick well seasoned ,antitermite treated FACTORY MADE FLUSH DOOR SHUTTER BOTH SIDE VENIER FINISHED WITH MELAMINE POLISHED INCLUDING ONE MORTICE LOCK ( GODREJ/OZONE MAKE), HYDROLIC DOOR CLOSER ( GODREJ/OZONE) with cost of loading & un-loading stacking at Maintenance stores all complete including cost and supply of all materials, T&P, all taxes, transportation, etc. complete as per direction of Engineer-in-charge. NB: Without painting. (Excluding cost of GST)
Fitting & fixing of door & window shutter with supply and fixing of 125mm/150mm required nos. of hinges, 150mm long towerbolt, 150mm handle, 300mm long aldrop,sandblock, clit etc cost of loading & un-loading stacking from departmental stores all complete including cost and supply of all labour, materials like hinges, tower bolt, handle, altrap etc. T&P, all taxes, transportation, etc. complete as per direction of Engineer-in-charge.(Excludicng cost of GST). NOTE : All fittings should be stainless steel fittings.
Supplying, fitting, fixing of GI welded grills/GRILL GATES fabricated with INDIAN STANDRD ANGLE OR FLAT GI flat, welded to approved design, size, fixed to position with screws, nails and grouting to walls in C.C (1:3:6) including cutting grooves in walls and making good the damages with cost and supply of all materials, labour, T&P, taxes, transportation, welding charges , grinding, staging, scaffolding, curing etc. all complete as per the direction of Engineer in charge. (Excludicng cost of GST)NOTE : THE GRILL GATES SHOULD BE COVERED WITH ALLUMINIUM/GI SHEET OF REQUIRED THICKNESS.
Supplying, fitting, fixing fully glazed powder coated Jindal Make aluminum window/ventilator/door shutters for slidding openable type with anodized aluminum of approved section as shutter frame panel fitted with rubber bending including lucking arrangement including all fittings , 4mm to 5mm plain/colours/frusted glass , aluminum U channels, angle, clips, required nos. of handles, hinges,tower bolts,screws, hooks as per relevant IS specification, GLASS OF 4-5 MM THICK all finished including cost & supply of all materials, labour, T&P, all taxes Excluding GST, transportation charges, staging, scaffolding, etc. complete as per direction of Engineer-in-charge. (Excluding GST )
Providing and fixing Ist Quality of digital ceramic wall tile (300 X 300) MM and antiskid/at finished ceramic floor tiles of (SOMANY/JONSHON/KAJARIA MAKE) conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in floors/walls of approved colours, shades except burgundy, bottle green, black of any size as approved by Engineerin- Charge, in skirting, risers of steps and dados, over 12mm to 40mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. with supply of all materials , labour, T&P, taxes, all transportation charges ,curing, etc. complete as directed by Engineer-in-charge.( Excluding cost of GST).
Providing and fixing DOUBLE CHARGE/ULTRACHARGE VITRIFIED TILE OF KAJARIA/JONSHON/SOMANY MAKE conforming to LATEST IS CODE (thickness to be specified by the manufacturer), of approved make, in floors approved colours, shades except burgundy, bottle green, black of any size as approved by Engineerin- Charge, in skirting, risers of steps and dados, over required thickness of cement mortar 1:3 (1 cement : 3 coarse sand) with close chipping to existing surface where necessary and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. with supply of all materials , labour, T&P, taxes, all transportation charges , staging, scaffolding, curing, etc. complete as directed by Engineer-in-charge.( Excluding cost of GST).
R.C.C. (1:1.5:3) for R.C.C. works using 12mm to 20mm size H.B.G. CB chips for all floors, foundation & plinth, roof slab,coloumn,beam,lintel etc. of approved quality, mixing as per required propertion, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties,laboratory charges for testing etc. all complete as directed by Engineer-in-charge.( Excluding GST )
Supply Tor/TMT steel manufactured by any IS certified company i.e. SAIL/TISCON/VIZAG Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding, fabricating grouting,anchoring with chemical if necessary as per site condition & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes, etc. all complete as per the direction of Engineer-in-charge. (NB: No payment shall be made for extra weight than theoretical co-efficient).( Excluding GST )N.B. No Wastage shall be paid as laid down in IS 1786. The steels are to be welded to old steel as per reqiured length in case of chajja, slab, parapet and cornice when necessary.
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank & MS pipes, jacks and other accessories of approved quality for R.C.C. work for following structures and deshuttering, removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete for all floors / height as directed by Engineer-in-charge.( Excluding GST ).
Cement conc. (1:2:4) works using 10mm & down size H.B.G. chips for all floors, with addiing of 2.00 % WPC by wt. of cement after cleanning the surface, making strips with use of glass where necessary (if necessary as per site consider) etc of approved quality, mixing as per required proportion hoisting, laying, compacting, curing including centring & shuttering with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, laboratory charges for performing & testing as per relevant IS code etc. all complete as directed by Engineer-in-charge. (Excludicng cost of GST)
Providing and fixing anodised aluminium grill (anodised transparent or dyed to required shade according to IS: 1868 with minimum anodic coating of grade AC 15) of approved design/pattern, with approved standard section and fixed to the existing window frame with C.P. brass/ stainless steel screws @ 200 mm centre to centre, including cutting the grill to proper opening size for fixing and operation of handles and fixing approved anodised aluminium standard section around the opening, all complete as per requirement and direction of Engineer-in-charge. ( Excluding GST )(Only weight of grill to be measured for payment).
Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3 mm thick water proofing membrane, black finished reinforced with nonwoven polyester matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/ litre and viscocity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc, and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : Joint strength in longitudinal and transverse direction at 23°C as 650/ 450N/ 5cm. Tear strength in longitudinal and transverse direction as 300/250N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane. ( Exluding GST). The warrenty period on the above item will be 05 years an amount of 10.00% will be kept withheld for aperiod of 05 years any damage or leakage occure during the warrenty period will be rectified by the agency at his own cost. If the agency will not able to do so the department can rectify the same by using alternative manner and the cost will be recovred from the agency who initially done the job.
Painting two coats to the exterior wall surface with weathercoat exterior paint of asian paint APEX /APEX ULTIMA/nerolac EXCEL/EXCEL MICA MARBLE of approved shed over the prepared surface with supply of all materials,the paint shold be applied with roller/brush with horizontal and vertical strokes( one coat consist of one horizontal and one vertical stroke) with supply of all materials, labour, T&P, taxes, all transportation charges , staging, scaffolding etc. complete as directed by Engineer-in-charge.( Excluding cost of GST). NB: The agency has to produce manufacturing test cirtificate during purchase of paint and should be produced to the office during submission of the bill. The warrenty period on the exterior paint is 03( three) years and the 10.00% of the above amount will be kept withheld and relesed after warrenty period. Any damage found during the warrenty period will be repainted by the agency with his own cost, otherwise the department will repaired the same and the cost will be recovered from the contractor amount.
Painting two coats to the wall face with Plastic Emulsion paint of Asian paint Royal/Berger silk/ Nerolac Impression approved quality & shade including cleaning , scraping with scrapers/wire brush, washing the surface with bio wash with supply of all materials , labour, T&P, taxes, all transportation charges , staging, scaffolding, curing, etc. complete as directed by Engineer-in-charge.( Excluding cost of GST).
Priming one coat to the exterior & Interior wall surface with ceiling of approved quality & shed including cleaning , scraping with scrapers/wire brush, washing the surface with supply of all materials,the paint shold be applied with roller/brush with horizontal and vertical strokes( one coat consist of one horizontal and one vertical stroke) with supply of all materials, labour, T&P, taxes, all transportation charges , staging, scaffolding etc. complete as directed by Engineer-in-charge.( Excluding cost of GST).
Enamel painting one coat/two coats to wood/iron work of approved quality & shedover a coat of primer after scrapping, sand prepering & cleaning the surface & filling the joints & holes with putty(bolied or raw) where found necessary before paint including all cost, supplying of all labour, materilas, T&P, scaffolding at any hight all complete as per the direction of Engineer-in-charge. (Excludicng cost of GST)
ONE COAT
TWO COAT WITH PRIMER
Supplying of following items including cost and supply of all labour, all fittings, T&P, all taxes, transportation to departmental as per direction of Engineer-in-charge. etc. all complete & as per direction of Engineer-in-charge. (Excludicng cost of GST)
Mosquito net
Velcro tape ( male/female)
Stiching charges for mosquito net
6mm BWR PLY
Green/blue fiber sheet
4mm/5mm thick Plain/ coloured/ Fursted glass
Screw full thread / half Screw with different sixes.
Providing and applying of polymer modified concrete (1:1½:3) using polymer sika latex or equivalent @3% by weight of cement using 10mm. & down h.b.g. chips including supply of all labour, T&P, etc. as directed by Engineer-in-charge. (Excluding of cost of GST)
Factory made single/double leaf rigid FRP sand which composite door shutter of 32mm./1 mm. thick laminated with two FRP skin with wood grain finish fabricated using U.V. stabilized Isopthalic Gelcoat and one layer of 450 GSM E-Glass chopped Strand Mat (CSM), impregnated with orthopthalic polyster resin. The thickness of the skins will not be less than 1.5mm. Expanded Polystyrene (EPS) structural form panel of 29mm. thickness and a density of 20 Kg./Cum shall be used as core material. Wooden reinforcement made of seasoned Sal wood blocks of cross section not less than 27mm. x 38mm. and also necessary Sal wood reinforcement for fixing the metal fitting such as tower bolts, aldrops, handles etc. shall be provide. A material, the Sal wood reinforcement & the skins. with supply of all materials, labour, T&P, taxes, transportation, etc. all complete as per direction of Engineer-in-charge (Excludicng cost of GST)
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done.
Factory made FRP Door frames of 75mm. x 100mm. or 70mm. x 120mm. size shall be fabricated using E-Glass Chopped Strand Mat (CSM), U.V. stabilized Isopthalic Gelcoat & impregnated with Isopthalic resin. The thickness of the FRP skin shall not be less than 2.0mm. The Door frame will consist of three segments which are provided with plug-in-socket arrangement in-situ in the mould. The segments are plugged in & with joined together by means of screws. The FRP frame shall be provided with wooden reinforcement of 6 locations for high screw holding capacity for fixing metallic hold fast & shall be consolidated by filling with plaster of pairs with fibre reinforcement with supply of all materials, labour, T&P, taxes, transportation, etc. all complete as per direction of Engineer-in-charge. (Excludicng cost of GST)
Supplying of labour with tools & plants for refixing the fittings and other necessary items as directed by Engineer in charge ( Excluding GST)
Skilled labour
Un-skilled labour
Supplying fitting & fixing green transparent fiber sheet over G.I. pipe (Heavy Duty) truss frame with required size & quantity with fixing all screw, nut and bolt by drilling holes and fixing with windties water proof washers, etc. all taxes, tollage, royalties, etc. complete as directed by the Engineer-in-charge including dismantling the damaged sheet (including cost of green sheet).
50mm dia (Heavy Duty) GI Pipe vertical post (TATA/ JINDAL)Make
40mm dia (Heavy Duty) GI Pipe Slope portion(TATA/ JINDAL)Make
Supplying, fitting, fixing of precoated galvolume metal sheet (TATA) or its equivalent of 0.5mm. thick of approved quality including fixing of all EPDM Screw, ridge piece, eve board fixing of windities with L.I.J. hooks, water proof washer, cutting the sheets to proper profile with supply of all materials, labour, T&P, staging, transportation, scaffolding, taxes, etc. complete as per direction of Engineer-in-charge. ( Excluding GST )
Supplying,fitting & fixing of well seasoned ,antitermite treated,rought free ,sapwood free,knought free Pia salwood Panel shutter with cost of loading & un-loading stacking at Maintenance stores all complete including cost and supply of all materials, T&P, all taxes, transportation, etc. complete as per direction of Engineer-in-charge. (Excludicng cost of GST), NB: Without painting.
Supplying, fitting, fixing of 25mm to 30mm. Thick Concrete Tile of approved quality & shade as per Latest relevant code IS 13801 laying over a base coarse of cement mortar (1:3) required thick with cement slurry including close chhiping to the existing floor or newly prepared base, cutting of tiles to size, filling the joints with the proper materials laid to proper slope and level cleaning the top surface with cost and supply of all materials, labour, T&P, taxes, curing,loading & unloading, transportation charges,stacking etc. all complete as per direction of Engineer-In-Charge. (Excluding GST).
Supplying and applying two coats of acrylic base wall putty (Birla) to Ceiling and interior wall after cleaning, sand papering, washing the wall surface and sand papering , scrapping preparing smooth to the surface at any height with Scafolding ,stagging etc.with supplying of all labour,materials, including all taxes, all complete as per the direction of Engineer-in-charge.(Excluding GST).
Repairing to MS rolling shutter including replacement of spring, latch, locking arrangements, top cover, Greesing, oiling, for smooth functioning of shutter with supply of all labour, T&P, all taxes, Safety arrangements, scaffolding, staging, fabricating at any height as per direction of Engineering-in-charge.(Excluding GST)
Supplying, Fitting & fixing of 110mm dia PVC rain water pipe with all fittings like Elbow, bend, sucket, offset clamp etc. as per requirement at side including cement jointing , cutting of holes in brick work /RCC work laying at the vertical/Horizontal side of the work at any height with supply of all labour, T&P, all taxes, Safety arrangements, scaffolding, staging as per direction of Engineering-in-charge.(Excluding GST)
Supplying , fitting and fixing rolling shutters of GI / Alluminium make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.with supply of all materials, labour, T&P, staging, transportation, scaffolding, taxes, etc. complete as per direction of Engineer-in-charge. ( Excluding GST ).N.B. 80x1.25 mm M.S. laths with 1.25 mm thick top cover. The agency has to maintainance the shutter upto 12 Month from date at installation and if any damage occured the agency has to Maintain the shutter and no additional cost will be given.
Naresh Chandra Bhatta
Mihir Kumar Nayak
ASSTABHUJA ENGG AND CONSTRUCTIONS
SURYAA CONSTRUCTION
Aakar Engineers and Contractors
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
CORRIGENDUM-1.pdf
Additional Documents • 0.32 MB
BOQ_633119.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .