| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC BURNPUR | L1 | Accepted-AOC SUCCESSFUL | |
| 2 | L2₹4.4 L+₹1,975.34 (0.45%)Rejected-Finance | L2 | Rejected-Finance REJECTED | |
| 3 | L3₹4.4 L+₹2,150.92 (0.49%)Rejected-Finance | L3 | Rejected-Finance REJECTED | |
| 4 | Rejected-Technical | - | Rejected-Technical INSUFFICIENT DOCUMENTS | |
| 5 | Rejected-Technical | - | Rejected-Technical INSUFFICIENT DOCUMENTS |
Tender Value
₹4.4 L
EMD Value
₹8,779
Closing Date
9 Jul 2026, 2:00 pmClosed
ASSISTANT ENGINEER
2, LARKIN LANE KOLKATA LOK BHAVAN SUB-DIVISION
Extension of Furniture Godown at the Compound of Ministers Quarter at North - West Corner of Lok Bhavan, Kolkata under S.G.E.W.B. during the year 2026 - 2027.
2026_WBPWD_5015901_1
WBPWD/AE/KLB/NIeT-02/2026-2027
Open Tender
CIVIL WORKS
Percentage
21 days
KOLKATA LOK BHAVAN
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,779
Yes
18 Aug 2026
23 Jun 2026
13 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Building Work Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 16.09 | %Cu.M | 11,927 | ₹1,91,905.43 |
| 2 | A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of
finished quantity) (B) Do - by fine sand | 8 | %Cu.M | 1,31,714 | ₹10,53,712 |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceedging 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 3.22 | %Cu.M | 7,754 | ₹24,967.88 |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 53.31 | Sq.M. | 361 | ₹19,244.91 |
| 5 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion | 4.04 | Cu.M. | 4,626.81 | ₹18,692.31 |
| 6 | 125 mm. thick brick work with 1st class bricks in cement mortar (4:1) in ground floor. | 30 | Sq.M. | 728.31 | ₹21,849.3 |
| 7 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth | 5.14 | Cu.M. | 5,366.86 | ₹27,585.66 |
| 7.01 | b) In superstructure, ground floor (1:6) | 0.79 | Cu.M. | 5,589.86 | ₹4,415.99 |
| 8 | Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (upto roof of ground floor) (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of Engineer-in-charge. | 5.06 | Sq.M. | 335 | ₹1,695.1 |
| 9 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups,binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor / upto 4m. (i) Tor steel/Mild steel TATA / RINL | - | MT | 54,915 | - |
stage.html
html • 0.14 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.53 MB
BOQ_5084966.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .