| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.7 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | Rejected-Technical | - | Rejected-Technical EMD is Satisfied and BQR Conditions are not Satisfied |
| Sl No | Description | Qty | Unit | MOHAN AGENCIES L1 |
|---|---|---|---|---|
| 1.00 | Charges for the opening and closing of valves for the drawl of Hydrochloric acid and Caustic soda lye from the overhead storage tanks to acid / lye dilution tanks for the regeneration of ion exchangers of DM plant and for dosing acid to RO plant, for starting the RO/DM plants and in stopping the RO/DM plant for the production of RO product water and DM water round the clock. To carry out the regeneration of Ion exchanger beds of DM plant, during the starting of the pumps and stopping of the pumps at the plant area, for the neutralization of the effluent water by dosing chemicals and then pumping out the effluent water, collection of water samples from the running RO/DM Plant round the clock as directed by the junior chemist in-charge | 365 | Operations | 2,899 ₹10,58,135 Lowest |
| 2.00 | Testing of Copper, Iron in stator water and feed water samples, testing of Residual Chlorine in cooling water inlet and outlet samples of all three units. | 365 | Operations | 1,279 ₹4,66,835 Lowest |
| 3.00 | Testing of moisture content in Generator coolant Hydrogen gas before and after drier of all three units. Testing of moisture content in compressor air of all three units. | 365 | Operations | 1,099 ₹4,01,135 Lowest |
| 4.00 | Testing conductivity, Total Hardness, Alkalinity, Silica etc in Raw water samples collected from DM plant Auxiliary cooling water of units I,II, and III daily. Reagent preparation for various parameters in sea water weekly. | 365 | Operations | 729 ₹2,66,085 Lowest |
| 5.00 | Testing of conductivity in Raw water, Strong Base anion, Weak base anion, Mixed Bed and DM water Tank samples at DM plant. | 365 | Operations | 607 ₹2,21,555 Lowest |
| 6.00 | Testing of PH in anion and Mixed bed samples at DM plant | 365 | Operations | 607 ₹2,21,555 Lowest |
| 7.00 | Testing of silica in anion and Mixed bed samples at DM plant | 365 | Operations | 607 ₹2,21,555 Lowest |
| 8.00 | Pressure gauge and flow meter reading taken in contact tank, sand filter, Activated Carbon Filter, Filter water and DM water and recorded in treatment register at DM pant | 365 | Operations | 447 ₹1,63,155 Lowest |
| 9.00 | Testing of Hardness, FMA in srong acid cation sample, P-value in anion samples for DM plant | 365 | Operations | 506 ₹1,84,690 Lowest |
| 10.00 | Recirculation of Neutralizing pit and testing of PH for DM plant | 365 | Operations | 447 ₹1,63,155 Lowest |
Tender Value
Refer Docs
EMD Value
₹37,000
Closing Date
1 Jul 2025, 2:00 pmClosed
The Chief Engineer
The Chief Engineer, North Chennai Thermal Power Station - I, Chennai - 120
NCTPS I Operation Circle Chemical Division Annual Maintenance work Testing of various samples collection and testing in RO cum DM plant and operational assistance in RO cum DM plant round the clock carrying out the works by entrusting an external age
2025_EB_569903_1
CE/NCTPS-I/SE/OPN/20/2025-26
Open Tender
Power/Energy Projects/Products
Works
365 days
NCTPS - I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹37,000
Yes
11 Sept 2025
17 Jun 2025
2 Jul 2025
17 Jun 2025
1 Jul 2025
17 Jun 2025
Amount
Charges for the opening and closing of valves for the drawl of Hydrochloric acid and Caustic soda lye from the overhead storage tanks to acid / lye dilution tanks for the regeneration of ion exchangers of DM plant and for dosing acid to RO plant, for starting the RO/DM plants and in stopping the RO/DM plant for the production of RO product water and DM water round the clock. To carry out the regeneration of Ion exchanger beds of DM plant, during the starting of the pumps and stopping of the pumps at the plant area, for the neutralization of the effluent water by dosing chemicals and then pumping out the effluent water, collection of water samples from the running RO/DM Plant round the clock as directed by the junior chemist in-charge
Testing of Copper, Iron in stator water and feed water samples, testing of Residual Chlorine in cooling water inlet and outlet samples of all three units.
Testing of moisture content in Generator coolant Hydrogen gas before and after drier of all three units. Testing of moisture content in compressor air of all three units.
Testing conductivity, Total Hardness, Alkalinity, Silica etc in Raw water samples collected from DM plant Auxiliary cooling water of units I,II, and III daily. Reagent preparation for various parameters in sea water weekly.
Testing of conductivity in Raw water, Strong Base anion, Weak base anion, Mixed Bed and DM water Tank samples at DM plant.
Testing of PH in anion and Mixed bed samples at DM plant
Testing of silica in anion and Mixed bed samples at DM plant
Pressure gauge and flow meter reading taken in contact tank, sand filter, Activated Carbon Filter, Filter water and DM water and recorded in treatment register at DM pant
Testing of Hardness, FMA in srong acid cation sample, P-value in anion samples for DM plant
Recirculation of Neutralizing pit and testing of PH for DM plant
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .