Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical NO 28 BAGYALAKSHMI NAGAR 1ST MAIN ROAD ALAPAKKAM CHENNAI 600 116 | CHENNAI | CHENNAI | TAMIL NADU | 600116 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical NO 12 RAMVILAS NAGAR NGO B COLONY TIRUNELVELI 627 007 | TIRUNELVELI | TAMIL NADU | 627007 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 17 NETHAJI ROAD MADURAI 625001 | MADURAI | TAMIL NADU | 625001 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical NITHYA FORTUNE APARTMENTS NO 1A S2 SECOND FLOOR NAIDU STREET KOTTURPURAM CHENNAI 600 085 | CHENNAI | CHENNAI | TAMIL NADU | 600085 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical 39 3A 1 DHARMAPURI MAIN ROAD CHIKKANAMPATTY VILLAGE KADAIYAMPATTY TK SALEM DT 636 309 | SALEM | TAMIL NADU | 636309 | Admitted-Fee/PreQual/Technical |
Tender Value
₹9.8 Cr
EMD Value
₹5.0 L
Closing Date
27 Jan 2026, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending engineer
SIPCOT Head office Egmore chennai
Strengthening of 1st Main Road of Phase I and 1st Main Road of Phase II at SIPCOT Industrial Park, Cheyyar.
2026_SIPCT_642373_1
NIT.No.51/CD/T.No.51/2025-26
Open Tender
Civil Works
Lump-sum
SIPCOT Industrial Park, Cheyyar.
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹5.0 L
SIPCOT Head office
6 Mar 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
27 Jan 2026
20 Jan 2026
19 Jan 2026
(Part-A) - Strengthening of Roads
Providing and laying Tack coat over the existing B.T surface using 2.00 Kg bitumen emulsion (RS1) to cut back for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 503 of MORT & H specifications. etc., complete complying with standard specification and as directed by SIPCOT Officers.
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver at site etc.,including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher,Vibratory rollers and all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5 etc., complete complying with standard specification and as directed by SIPCOT Officers.
Providing and laying 30mm compacted thickness bituminous concrete using 0.13 cum of 19.0 - 9.5 mm graded IRC size HBG metal 0.17 cum of 9.5-2.36mm IRC graded metal and 0.26 Cum. of 2.36 mm and below size graded metal with 50.30 Kg of bitumen grade VG 30 confirming to IS 73 for pre mixing for 10 Sq. meter and using materials as per table 500 - 17 and staifying the physical requirement for material for course aggregates for BC as per table 500 - 16 of MORTH REV-V including cost and conveyance of all materials to CMP site , heating the bitumen andaggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity, conveyin the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidation 80-100 kn vibratory/Pneumatic road roller to the required density etc., includinglabour charges for loading the bitumen in bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire, fuel charges for 20-30 tonnes capacity CMP unit bitumen boiler, tipper trucks, paver finaisher/5m paver finisher /Vibratory/Pneumatice road roller , and all other tools and plants requried, including fuel and all other incidental charges etc., complete as per specification using CMPP as per clause 507 OF MORTH REV. specification etc., complete complying with standard specification and as directed by SIPCOT Officers.
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per standard specifications and as directed by SIPCOT Officers as per MORT&H specification No.803
Road Markers / Road Stud with Lens Reflector: Providing and fixing reflective road studs of "category A" Raised pavement markers made out of poly carbonate / methyl methecrylate / ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MORTH circular No RW / NH. 33023 / 10 / 97 - DO.III dt 11.06.97. The height, width and length shall not be less than 15mm, 90mm and 100mm and with minimum reflective area of 13 sq.cm on each side and the slope to the base shall be 35 +/- degree. Each reflector shall have a CIL not less than values specified in table 2 of said MORTH circular. The strength of detachment of the integrated cylindrical shanks, (of diameter not less then 19 +/- 2mm and height not less than 30+/- 2mm) from the body is to be a minimum value of 500 Kgf. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35 - 2015 guidelines and MORT&H specification 804 etc., complete complying with standard specification and as directed by SIPCOT Officers.
Providing and Laying of Gravel including cost and conveyance of the same to work site from approved quarry including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading, including all hire and fuel charges for power roller for compaction, etc., complete complying with standard specification and as directed by SIPCOT Officers.
Sub Total of Total Amount in Column BA (ie. Qty x Unit Rate)
Added GST of 18%
stage.html
html • 0.03 MB
cancelled_1.pdf
pdf • 0.24 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_769596.xls
BOQ • 0.30 MB
Annexure1.pdf
Tender Documents • 0.57 MB
Annexure2.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .