| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 CrAdmitted-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹1.5 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | SWAPAN KUMAR AKHULI L2 | BABLU SINHA L1 |
|---|---|---|---|---|---|
| 1.00Installation, commissioning and dismantling of 1000mm wide x 490 mtr long, 90KW x 2, 550V belt conveyor in RVIIA seam from 46L/10ED to 46L/4WD for B1 panel of SHCM at Shyamsundarpur Colliery under Bankola Area.” | |||||
| 2.00 | Transportation & installation of complete drive drum driven drum with gear motor base frame-12,5MT+discharge unit-2.5MT+tail end-1MT+Load table-1M+Hoop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-490mtr @106Kg/mtr =51.94MT +11 times Tail end extension-11MT= total weight =86.54 MT | 87.54 | MT | 26,822.6 ₹23.5 L | 26,421 ₹23.1 L |
| 3.00 | Fitting of tail end and discharge scraper. | 4 | nos | 1,236.51 ₹4,946.04 | 1,218 ₹4,872 |
| 4.00 | Belt laying including transporting of belt, jointing, tensioning. trial run etc | 990 | mtr | 566.48 ₹5.6 L | 558 ₹5.5 L |
| 5.00 | Foundation bolting for fitting of drive unit, discharge unit, loop take up & tail end etc =120nos | 120 | nos | 454.81 ₹54,577.20 | 448 ₹53,760 |
| 6.00 | Cleaning of coal & unused materials before installation job | 1 | ls | 21,025.81 ₹21,025.81 | 20,711 ₹20,711 |
| 7.00 | Making, and fabrication of Load table | 1 | nos | 28,558.59 ₹28,558.59 | 28,131 ₹28,131 |
| 8.00 | Fencing of drive, loop take up & tail end | 1 | ls | 18,551.76 ₹18,551.76 | 18,274 ₹18,274 |
| 9.00 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding. gas cutting etc. considering cost of consumables. | 1 | ls | 55,288.81 ₹55,288.81 | 54,461 ₹54,461 |
| 10.00 | Dismantling of complete drive drum driven drum with gear motor base frame-12.5MT+discharge unit-2.5MT+tail end -1 MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc-2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-490mtr @106Kg/mtr =51.94MT = total weight=75.54 MT | 75.54 | MT | 10,265.7 ₹7.8 L | 10,112 ₹7.6 L |
Tender Value
₹1.5 Cr
EMD Value
₹1.8 L
Closing Date
30 Mar 2026, 4:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
(1) Installation commissioning and dismantling of 1000mm Conveyor belt setup for Panel No.B1 and B3 in RVIIA seam for SHCM package and Installation and Commissioning of 1200mm wide X 420M long and 1200mm wide x 385m long conveyor belt for Panel C
2026_ECL_356676_1
ECL/GM/BA/E TENDER/25-26/ENM/400 Dt 14.03.2026
Open Tender
Electrical and Maintenance Works
120 days
Shyamsundarpur Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹1.8 L
8 Apr 2026
14 Mar 2026
31 Mar 2026
14 Mar 2026
30 Mar 2026
14 Mar 2026
14 Mar 2026 - 23 Mar 2026
Installation, commissioning and dismantling of 1000mm wide x 490 mtr long, 90KW x 2, 550V belt conveyor in RVIIA seam from 46L/10ED to 46L/4WD for B1 panel of SHCM at Shyamsundarpur Colliery under Bankola Area.”
Transportation & installation of complete drive drum driven drum with gear motor base frame-12,5MT+discharge unit-2.5MT+tail end-1MT+Load table-1M+Hoop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-490mtr @106Kg/mtr =51.94MT +11 times Tail end extension-11MT= total weight =86.54 MT
Fitting of tail end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning. trial run etc
Foundation bolting for fitting of drive unit, discharge unit, loop take up & tail end etc =120nos
Cleaning of coal & unused materials before installation job
Making, and fabrication of Load table
Fencing of drive, loop take up & tail end
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding. gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame-12.5MT+discharge unit-2.5MT+tail end -1 MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc-2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-490mtr @106Kg/mtr =51.94MT = total weight=75.54 MT
Taken out and coiling of belt
Cost of M.S. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for 13 Mato make machine available in mines
Drive base frame, Loop take up base & discharge base 14 cement concrete
Installation, commissioning and dismantling of 1000mm wide x 175mtr ong, 90kW, 550V belt conveyor in RVIIA seam from 43L/10ED to 43L/15ED for B3 panel of SHCM at Shyamsundarpur colliery under Bankola Area.
Transportation & installation of complete drive drum driven drum with gear motor base frame-12.5MT+discharge unit-2.5MT+tail end-1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-170ntr @106Kg/mtr =18.55MT +3 times Tail end shifting(extension)-3MT=total weight=45.15 MT
Fitting of tail end and discharge scraper.
Belt laying including transporting of belt jointing tensiong trial run etc
Foundation bolting for fitting of drive unit, discharge unit, loop take up & tail end etc=120nos
Cleaning of coal & unused materials before installation job
Making, and fabrication of Load table
Fencing of drive, loop take up & tail end
Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by welding. gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame-12.5MT discharge unit-2.5MT+tail end-1MT+Load table-1MT+loop take up with tension trolley drum- 3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc-2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-170mtr @106Kg/mtr=18.55MT = total weight -42.15 MT
Taken out and coiling of belt
Cost of M.S. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base & discharge base cement concrete
Installation and commissioning of 1200mm wide x 420mtr long long, 3.3kV HT belt conveyor in RVIIA seam from 11L/10D to 11L/22D for C2 panel of SHCM at Shyamsundarpur colliery under Bankola Area
Transportation & installation of complete 1200 mm double drive unit with gear motor& base frame -21MT + discharge unit -2.75 MT + loop take up with tension trolley drum-3.6MT +fixed unit with drum -1MT +load table 01 nos =1MT +tail end -1MT +1200 mm wide conveyor structure with top bottomroller & foot stool 420mtr x 80kg/mtr =33.6MT + starter and cable-1.5 MT+Tail end extension/shifting-10MT- total weight =75.45 MT
Making load table 01nos
Fitting of tail end and discharge scraper
Belt laying including transportation of belt jointing, tensioning trail run etc
Providing bolts and nut for fitting of above structure 420mtr 1.5Kg/mtr=630kg load table discharge & bend pulley loop take =630kq
Foundation bolting for drive unit 38 nos + discharge unit 24 nos + loop take with fixed unit 36 + tail end (4x11)-44nos total =142 nos
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding gas cutting etc considering cost of consumables
Cost of belt fasteners
Cleaning coal and unused materials & levelling the floor 9 before installation of drive unit base discharge unit base loop take up tail end
Fencing of drive & tail end etc
Drive base frame, discharge base & loop take up cement concrete
Installation and commissioning of 1200mm wide x 385mtr long long, 3.3kV HT belt conveyor in RVIIA seam from 6L/10D to 6L/21D for C3 panel of SHCM at Shyamsundarpur colliery under Bankola Area
Transportation & installation of complete 1200 mm double drive unit with gear motor& base frame -21MT + discharge unit -2.75 MT + loop take up with tension trolley drum-3.6MT + fixed unit with drum -1MT +load table 01 nos =1MT +tail end - 1MT +1200 mm wide conveyor structure with top bottom roller & foot stool 385mtr x 80kg/mtr = 30.8MT + starter and cable-1.5 MT+Tail end extension/shifting-9MT- total weight =71.65 MT
Making load table 01nos 1 Nos
Fitting of tail end and discharge scraper
Belt laying including transportation of belt jointing, tensioning trail run etc
Providing bolts and nut for fitting of above structure 385mtr 1.5Kg /mtr =570kg load table discharge & bend pulley loop take =570kg
Foundation bolting for drive unit 38 nos + discharge unit 24 nos loop take with fixed unit 36 + tail end (4x10)-40nos total =138 nos
Making vertical support from roof and floor for hanging the 7 conveyor structure from drive head to discharge by welding gas cutting etc considering cost of consumables
Cost of belt fasteners
Cleaning coal and unused materials & levelling the floor 9 before installation of drive unit base discharge unit base loop take up tail end
Fencing of drive & tail end etc
Drive base frame, discharge base & loop take up cement concrete
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_369535.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Tendernotice_2.pdf
PDF • 1.29 MB
BOQ_369535.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid