Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.1 LAdmitted-Finance | -14.99% | ₹14.1 L | L1 | Admitted-Finance |
| 2 | L2₹14.7 L+₹64,158.21 (4.56%)Admitted-Finance | -11.11% | ₹14.7 L+₹64,158.21 (4.56%) | L2 | Admitted-Finance |
| 3 | L3₹18.2 L+₹4.1 L (29.4%)Admitted-Finance | +9.99% | ₹18.2 L+₹4.1 L (29.4%) | L3 | Admitted-Finance |
Tender Value
₹19.5 L
EMD Value
₹39,020
Closing Date
2 Sept 2026, 6:00 pmClosed
Executive Engineer, PWD Division II Sawai Madhopur
Executive Engineer, PWD Division II Sawai Madhopur
Construction of Ghat at the Small Pond/Lake in Shiwad Village
2026_CEPWD_593448_1
E-NIT No. 07/2026-27 EE PWD Dn. II SWM
Open Tender
Civil Works
Percentage
180 days
Sawai Madhopur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Egras Office ID 4075
₹39,020
Yes
3 Sept 2026
28 Aug 2026
3 Sept 2026
28 Aug 2026
2 Sept 2026
28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter.
All kinds of soils | - | Cum | 178 | - |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | Cum | 3,962 | ₹3,958.04 |
| 3 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:
Cement Mortar 1:4 ( 1-Cement : 4-Sand). | - | Cum. | 3,818 | - |
| 4 | Supplying and Filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete including cost of sand. | - | Cum. | 450 | - |
| 5 | Random rubble dry stone Kharanja under floor. | - | cum | 1,118 | - |
| 6 | Supplying and fixing machine cut fine dressed Red/Pink sand stone dasa or coping, with full moulding if required laid on cement mortar 1:4 including pointing with admixture of pigment matching with the stone shade.
75 mm thick | - | Sqm. | 1,997 | - |
| 7 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish :
20mm thick . | - | Sqm. | 242 | - |
| 8 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, making of lines or groove etc complete but excluding the cost of nosing of steps etc. complete.
75mm thick with 20mm thick nominal size aggregate. | - | Sqm. | 504 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.02 MB
BOQ_1053268.xls
BOQ • 0.28 MB
Agreement.pdf
Tender Documents • 1.38 MB
Circulars.pdf
Tender Documents • 15.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .