Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.6 Cr+₹9.8 L (6.48%)Rejected-Finance | ₹1.6 Cr+₹9.8 L (6.48%) | L-2 | Rejected-Finance Rates Quoted by the bidder are higher than the L-1 Bidder. |
| 3 | L-3₹1.8 Cr+₹23.9 L (15.7%)Rejected-Finance | ₹1.8 Cr+₹23.9 L (15.7%) | L-3 | Rejected-Finance Rates Quoted by the bidder are higher than the L-1 Bidder. |
| 4 | Rejected-Technical NA ROHIT TYAGI BEGUM BRIDGE MEERUT BEGUM BRIDGE BEGUM BRIDGE MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | - | - | Rejected-Technical Technically Disqualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
Tender Value
₹1.9 Cr
EMD Value
₹2.9 L
Closing Date
26 Sept 2019, 3:00 pmClosed
Chief General Manager/Sangaldan/J and K
USBRL Head Office, Satyam Complex, Marble Market, P.O. Sainik Colony, Jammu, J and K 180011
RENOVATION AND MAINTENANCE WORKS AT BANIHAL CAMPUS OF NORTHERN RAILWAY AND IRCON INCLUDING SUPPLY OF FURNITURES AND RELATED MISCELANEOUS WORKS IN CONNECTION WITH USBRL PROJECT, BANIHAL, J AND K.
2019_IRCON_30724_1
IRCON/JK CELL/JAT/14/1014/KB/Renov. of BNLCamp/423
Open Tender
Civil Works - Buildings
Percentage
180 days
Banihal, J and K
As per tender conditions
8 documents required · 8 mandatory
₹10,000
Yes
Ircon International Limited
₹2.9 L
Yes
17 Feb 2020
22 Aug 2019
27 Sept 2019
22 Aug 2019
26 Sept 2019
2 Sept 2019
23 Aug 2019 - 29 Aug 2019
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .