Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 CrAccepted-AOC NOT SPECIFIED | ₹5.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.9 CrRejected-Finance | ₹5.9 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹6.0 CrRejected-Finance | ₹6.0 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹6.3 CrRejected-Finance BHAGATPUR SHIVPUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | ₹6.3 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹6.4 CrRejected-Finance | ₹6.4 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SHIVANSH CONSTRCUTION L6 | ASHUTOSH KUMAR VERMA L3 | NARAIN ENGINEERS INFRATECH PRIVATE LIMITED L2 | M/s Singh Traders L4 | M/S R.P. SINGH AND COMPANY L1 | NIKHIL CONSTRUCTION L7 | M/S CONSTRUCTION NETWORK INDIA L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work by power transport for a lead of upto 16 km. including excavation loading, unloading, Manual compaction and dressing including all left. Including all Cost of M/L &T&P etc. | 9,813.44 | Cum | 381.64 ₹37.5 L | 300 ₹29.4 L | 360 ₹35.3 L | 369.46 ₹36.3 L | 250 ₹24.5 L | 400 ₹39.3 L | 320 ₹31.4 L |
| 2.00 | Dismentaling and Relaying 300 mm thick damaged stone boulder pitching on slope of bund including all labour T&P etc. complete. | 15,930.9 | Cum | 340.65 ₹54.3 L | 260 ₹41.4 L | 308 ₹49.1 L | 329.78 ₹52.5 L | 370 ₹58.9 L | 350 ₹55.8 L | 300 ₹47.8 L |
| 3.00 | Providing and Laying of new boulder 300 mm thick in place of damaged and missing stone boulder pitching on slope of bund including all labour T&P etc. complete. | 5,479.27 | Cum | 4,355.46 ₹2.4 Cr | 4,200 ₹2.3 Cr | 3,900 ₹2.1 Cr | 4,216.45 ₹2.3 Cr | 3,800 ₹2.1 Cr | 4,380 ₹2.4 Cr | 4,010 ₹2.2 Cr |
| 4.00 | Construction of New Rain Chutes in Place of totally Damaged Rain Chutes Including all Cost of M/L &T&P etc. | 18 | No. | 1,43,142.26 ₹25.8 L | 1,30,000 ₹23.4 L | 1,28,675 ₹23.2 L | 1,38,573.89 ₹24.9 L | 1,10,000 ₹19.8 L | 1,52,279 ₹27.4 L | 1,52,279 ₹27.4 L |
| 5.00 | Construction of New Rain Chutes needs to be provided additionally to maintain spacing of Rain Chutes @ 50 metre c/c.(already provided @100 metre c/c in reach km.3.00 to 5.950) Including all Cost of M/L &T&P etc. | 126 | No. | 1,43,142.26 ₹1.8 Cr | 1,30,000 ₹1.6 Cr | 1,28,675 ₹1.6 Cr | 1,38,573.89 ₹1.7 Cr | 1,10,000 ₹1.4 Cr | 1,52,279 ₹1.9 Cr | 1,52,279 ₹1.9 Cr |
| 6.00 | Maintenaince of existing damaged Rain Chutes Including all Cost of M/L &T&P etc. | 180 | Rm | 7,533 ₹13.6 L | 7,500 ₹13.5 L | 6,800 ₹12.2 L | 7,293.36 ₹13.1 L | 6,500 ₹11.7 L | 8,014 ₹14.4 L | 7,800 ₹14.0 L |
| 7.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. excluding cost of centering, shuttering, finishing and reinforcement :R.C.C. 1:1.5:3 (1 cement : 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size ) Including all Cost of M/L &T&P etc. | 909.35 | Cum | 8,304 ₹75.5 L | 8,000 ₹72.7 L | 7,300 ₹66.4 L | 8,039.55 ₹73.1 L | 6,800 ₹61.8 L | 8,500 ₹77.3 L | 8,500 ₹77.3 L |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding Including all Cost of M/L &T&P etc. | 36,363.44 | Kg | 83.44 ₹30.3 L | 75 ₹27.3 L | 72 ₹26.2 L | 80.78 ₹29.4 L | 70 ₹25.5 L | 85 ₹30.9 L | 80 ₹29.1 L |
Tender Value
Refer Docs
EMD Value
₹14.0 L
Closing Date
18 Mar 2026, 10:00 amClosed
Superintending Engineer
Office of Superintending Engineer, VII Circle Irrigation Works, Sarojni Naidu Marg, Lucknow.
AS PER TENDER NOTICE-07 LOT-03
2026_UPIDC_1124672_3
07/SE-VII/2025-26
Open Tender
Civil Works
120 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹14.0 L
Lucknow
4 May 2026
13 Mar 2026
18 Mar 2026
13 Mar 2026
18 Mar 2026
13 Mar 2026
13 Mar 2026
Earth work by power transport for a lead of upto 16 km. including excavation loading, unloading, Manual compaction and dressing including all left. Including all Cost of M/L &T&P etc.
Dismentaling and Relaying 300 mm thick damaged stone boulder pitching on slope of bund including all labour T&P etc. complete.
Providing and Laying of new boulder 300 mm thick in place of damaged and missing stone boulder pitching on slope of bund including all labour T&P etc. complete.
Construction of New Rain Chutes in Place of totally Damaged Rain Chutes Including all Cost of M/L &T&P etc.
Construction of New Rain Chutes needs to be provided additionally to maintain spacing of Rain Chutes @ 50 metre c/c.(already provided @100 metre c/c in reach km.3.00 to 5.950) Including all Cost of M/L &T&P etc.
Maintenaince of existing damaged Rain Chutes Including all Cost of M/L &T&P etc.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. excluding cost of centering, shuttering, finishing and reinforcement :R.C.C. 1:1.5:3 (1 cement : 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size ) Including all Cost of M/L &T&P etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding Including all Cost of M/L &T&P etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_2095938.xls
BOQ • 0.34 MB
BID07LOT03.pdf
Tender Documents • 2.04 MB
Download all tender documents and submit your bid