Loading…
Loading…
Updated dates
Tender Value
Refer Docs
EMD Value
₹4.0 L
Closing Date
23 Jun 2026, 5:00 pm2d left
Similar tender results from the same govt authority in the past 3 years.
EO DANKAUR
np dankaur office
Nagar Panchayat Dankaur Prangan me karyalya bhavan ka Nirman karya
2026_DOLBU_1158554_8
02ET/2026-27 DATED 11 June 2026
Open Tender
Civil Works
180 days
NP DANKAUR
Nagar Panchayat Dankaur Prangan me karyalya bhavan ka Nirman karya
2 documents required · 2 mandatory
₹4,720
EO
₹4.0 L
12 Jun 2026
12 Jun 2026
24 Jun 2026
12 Jun 2026
23 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil(loam,clay or sand)including lift upto 1.50M and lead 30M and including filling watering and ramming of excavated earth into the trenchesor into the space between building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer in chrge upto a distance of 30M from the foundation trenches S.I. No.251(a) | 189.54 | M3 | 110 | ₹20,849.4 |
| 2 | cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 Including supply of all materials, labour, tools & plant etc. required for proper completion of the work. As per S.I. No. 281 | 40.2 | M3 | 6,100 | ₹2,45,220 |
| 3 | RCC Work with cement,approved coarse sand @2 cm gauge approved stone grit in proportions of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc and supply of all materials,labour,tools & plants etc and supply of all materisals, labour,tools @plants etc required for proper completition of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. | 54.11 | M3 | 8,580 | ₹4,64,267.66 |
| 4 | M-150 Brick work in cement mortar in proportion pf 1:4 (1cement and 4 coarse sand) in foundation & plinth including supply of all material, labour, T&P etc required for propercomletion of the wprk.as per S.I.No. 305a | 47.39 | M3 | 5,170 | ₹2,45,026.98 |
| 5 | M-150 class B/W in 1:4 ratio cement and coarse sand in super structure including supply of all materials , lab,and T&P all complete S.I No. 305(a)+309+310 | 80.02 | M3 | 5,930 | ₹4,74,518.6 |
| 6 | RCC Work with cement,approved coarse sand @2 cm gauge approved stone grit in proportions of 1:11/2:3 in plinth ,slabs & lintel of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc and supply of all materials,labour,tools & plants etc and supply of all materisals, labour,tools @plants etc required for proper completition of the work including cost of binding wire. The raet excludes making of drip course which shall be paid extra S.I No. 284 New Item | 40.02 | M3 | 9,030 | ₹3,61,380.6 |
| 7 | M.S or iron work of heavy size such as trusses, built up gates , record rack ,roof work ,gates etc. including rivertting or welding where necessary and their fixing required for proper completion of work S.I. No. 503 | 10 | Qtl. | 8,000 | ₹80,000 |
| 8 | 12mm thick plaster with cement and fine sand of 1.25 fineness modules in 1:4 over brick work minumum thickness not to be less than 1cm. Including supply of all materials, labour, tools & plant etc. required for proper completion of the work. As per S.I. No.584 | 985 | M2 | 200 | ₹1,97,000 |
| 9 | Making Drip Course in sunshades or facia with 1:3 cement and Fine sand morta | 100 | Rm | 25 | ₹2,500 |
| 10 | cement concrete with 2 cm gauge approved stone ballast coarse sand & cement in the proportion of 4:2:1 Including supply of all materials, labour, tools & plant etc. required for proper completion of the work. As per S.I. No. 279a | 0.9 | M3 | 7,050 | ₹6,345 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
DocumentsTender8.pdf
Tender Documents • 1.94 MB
BOQ_2173205.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid