Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-Finance | ₹1.1 Cr | 1 | Accepted-Finance as per upload |
| 2 | 2₹1.3 CrAccepted-Finance GOURI TOWER FIRST FLOOR NEAR SON CHIRAIYA HOTEL SHIVPURI M P 473551 | SHIVPURI | SHIVPURI | MADHYA PRADESH | 473551 | ₹1.3 Cr | 2 | Accepted-Finance as per upload |
| 3 | 3₹1.3 CrAccepted-Finance | ₹1.3 Cr | 3 | Accepted-Finance as per upload |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-as per attachment |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-as per attachment |
Updated dates
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
27 Jan 2026, 5:00 pmClosed
EE WR Division Jalore
EE WR Division Jalore
Construction of 2 Nos. Sub Surface Barrier in Sarbh Nalla Near Village Deldari GP Bibalsar Tehsil and District Jalore
2026_WRDAS_525799_1
EE WR Division Jalore NIT 11 Item 04
Open Tender
Civil Works
Jalore
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
EE WR Division Jalore
₹2.6 L
Yes
26 Feb 2026
7 Jan 2026
28 Jan 2026
7 Jan 2026
27 Jan 2026
7 Jan 2026
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required.
750micron thick HDPE Geomembrane as water proofing layer: 750 micron thick HDPE Geomembrane textured (Both side) as waterproofing layer: Supply of HDPE liner 1 mm thickness manufactured as per GRI GM 13 standards complete at site. Testing of HDPE Geo membrane should be done as per specifications of GRIGM 13 from independent approved lab.
Laying, welding & testing of 1mm HDPE Liner
Supplying, laying & spreading of LDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_938278.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.30 MB
BOQ_938278.xls
BOQ • 0.39 MB
nit.pdf
Tender Documents • 6.29 MB
Download all tender documents and submit your bid