Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹2.0 L+₹415 (0.21%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹2.0 L+₹2,706 (1.36%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
30 Dec 2020, 4:00 pmClosed
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
REMOVAL OF P.G. CLAMP AND JUMPER TIGHTENING OF 220KV RAEBARELI (PG)-UNCHAHAR (NTPC)-I TRANSMISSION LINE ALONGWITH OTHER ASSOCIATED WORKS UNDER ETD, RAEBARELI.
2020_UPTCL_535586_1
T. NO. 86/ETCS/2020-21
Open Tender
Electrical Works
Item Wise
60 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
SE ETC Sultanpur
₹2,000
1 Jan 2021
5 Dec 2020
31 Dec 2020
5 Dec 2020
30 Dec 2020
5 Dec 2020
5 Dec 2020 - 30 Dec 2020
Amount
Following Works are to be Carried out on 220KV Raebareli(PG)-Unchahar(NTPC)-I Line under Raebareli with all Cost of Men, Misc. Consumables, T&Ps etc. Required for Satisfactory Completion of the Work as per Technical Specifications & Direction of the Supervising Engineer :
Diversion/ Mobilization of Gang for Removal of P.G. Clamps from the Conductor Earlier Used for Connecting the Jumper by Fixing of Jumper with Compresed Cone on Conductor and Replacement of above 220KV Transmission Line Required to Complete the Work in Bare Minimum Time and Return Back of the Gang after Completion of the Work. (1 Job per Planned Shut Down)
Replacement of P.G. Clamps from the Conductor of above 220KV Transmission Line by Way of Releasing the Respective Phase Conductor from Suspension Fitting of the Towers, if Required between the Section Towers, Cutting of the Damaged Portion / Part Portion of the Conductor, Jointing new Conductor with the help of Mid Span Joint & Dead End Fitting by Making Compression Joint. Finally, Re-Stringing & Sagging of the Conductor as per Sag Chart with Clamping the Conductor at Suspension Towers as Required, as per Details below
1 Conductor of 1 Span Section
1 Conductor of more than 1 Span Section and Length upto 1 Km
Tightening of Jumper along with Replacement of Fasteners, if Required, to be Provided by the Department as per Requirement on Section Towers of above 220KV Raebareli(PG)-Unchahar(NTPC)-I Line
M/S R.K. ERACTORS
MANAS ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .