| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.7 LAdmitted-Finance | ₹58.7 L | L1 | Admitted-Finance |
| 2 | L2₹64.1 L+₹5.4 L (9.15%)Admitted-Finance | ₹64.1 L+₹5.4 L (9.15%) | L2 | Admitted-Finance |
| 3 | L3₹64.6 L+₹5.8 L (9.95%)Admitted-Finance | ₹64.6 L+₹5.8 L (9.95%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | F A CONSTRUCTION L3 | INDIA ENGINEERING WORKS L2 | S.K.Engineers L1 |
|---|---|---|---|---|---|---|
| 1.00Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.7(110MW) | ||||||
| 1.01 | Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.7(110MW) (One job consists one Shift of 08 hrs.) | 1,830 | Jobs | 2,575 ₹47,12,250 | 2,452 ₹44,87,160 | 2,410 ₹44,10,300 Lowest |
| 1.02 | Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.7(110MW) during RSD (Reserved Shut Down) / any major break down of Unit / Overhauling (One job consists one Shift of 08 hrs.) | 360 | Jobs | 685.3 ₹2,46,708 | 653 ₹2,35,080 Lowest | 1,000 ₹3,60,000 |
| 2.00Breakdown Maintenance & Overhauling of Ash Slurry Pumps, Sump Pumps & Sealing pumps of ‘C’ Ash Slurry Pump House and LP, HP flush pumps & Clinker Grinders | ||||||
| 2.01 | Complete overhauling of Ash Slurry pumps ‘Flow More’ & ‘SAM’ make | 10 | Nos. | 39,821 ₹3,98,210 | 38,891 ₹3,88,910 | 15,000 ₹1,50,000 Lowest |
| 2.02 | Alignment of suction and Delivery side pipeline and testing and commissioning of Ash slurry pump | 8 | Nos. | 3,664 ₹29,312 | 4,444 ₹35,552 | 2,500 ₹20,000 Lowest |
| 2.03 | Minor repair/replacement of Ash slurry pump components. | 3 | Nos. | 12,657 ₹37,971 | 15,870 ₹47,610 | 1,000 ₹3,000 Lowest |
| 2.04 | Replacement of Ash Pump from foundation at (-) 4 Mtr. and (-) 8 Mtr. to ground level and vice- versa | 5 | Nos. | 6,843 ₹34,215 | 7,472 ₹37,360 | 2,500 ₹12,500 Lowest |
| 2.05 | Fabrication of steel pedestal structure (for supporting of ash pipelines) | 151 | Nos. | 45 ₹6,795 | 46 ₹6,946 | 30 ₹4,530 Lowest |
| 2.06 | Repairing of broken M.S ash pipeline by patch work/welding process. | 35 | Nos. | 555 ₹19,425 | 625 ₹21,875 | 300 ₹10,500 Lowest |
Tender Value
₹67.3 L
EMD Value
₹1.3 L
Closing Date
12 Aug 2026, 1:00 pmClosed
Er Ramayan Singh SE OMC I DTPS Kasimpur
Office of the SE OMC I DTPS Kasimpur
Round the Clock Operation Routine Preventive and Breakdown Mechanical Maintenance Works of Ash Handling Plant of Unit No 07 CTPS HTPS Kasimpur for a period of two year
2026_RVUNL_1172568_1
STET-01/OMC-I/AHD/CTPS/26-27
Open Tender
Repair and Maintenance Works
Lump-sum
730 days
AHD CTPS Kasimpur area
As per PQC of Tender Documents
4 documents required · 4 mandatory
₹5,900
SAO EPAD HTPS Kasimpur
₹1.3 L
31 Aug 2026
27 Jul 2026
13 Aug 2026
27 Jul 2026
12 Aug 2026
27 Jul 2026
27 Jul 2026 - 11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.7(110MW) | |||||
| 1.01 | Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.7(110MW) (One job consists one Shift of 08 hrs.) | 1,830 | Jobs | - | - |
| 1.02 | Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.7(110MW) during RSD (Reserved Shut Down) / any major break down of Unit / Overhauling (One job consists one Shift of 08 hrs.) | 360 | Jobs | - | - |
| 2Breakdown Maintenance & Overhauling of Ash Slurry Pumps, Sump Pumps & Sealing pumps of ‘C’ Ash Slurry Pump House and LP, HP flush pumps & Clinker Grinders | |||||
| 2.01 | Complete overhauling of Ash Slurry pumps ‘Flow More’ & ‘SAM’ make | 10 | Nos. | - | - |
| 2.02 | Alignment of suction and Delivery side pipeline and testing and commissioning of Ash slurry pump | 8 | Nos. | - | - |
| 2.03 | Minor repair/replacement of Ash slurry pump components. | 3 | Nos. | - | - |
| 2.04 | Replacement of Ash Pump from foundation at (-) 4 Mtr. and (-) 8 Mtr. to ground level and vice- versa | 5 | Nos. | - | - |
| 2.05 | Fabrication of steel pedestal structure (for supporting of ash pipelines) | 151 | Nos. | - | - |
| 2.06 | Repairing of broken M.S ash pipeline by patch work/welding process. | 35 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
TenderSpecificationstet01ahd.pdf
Tender Documents • 1.47 MB
BOQ_2201983.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .