Loading…
Loading…
Tender Value
₹44.1 L
EMD Value
₹88,166
Closing Date
13 Jul 2026, 11:00 am5d left
Executive Engineer/Sports Division-1
The Executive Engineer, SD-1, Siri Fort Sports Complex, New Delhi - 110049
Waterproofing of space frame roof (pyramid/sloped geometry with valleys and hips) at Siri Fort Sports Complex (Specialized work).
2026_DDA_916256_1
12/NIT/EE/Sports Divn.-I/DDA/2026-27.
Open Tender
Civil Works
45 days
The Executive Engineer, SD-1, Siri Fort Sports Com
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹88,166
Yes
7 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
13 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and applying a high-performance comprehensive micro-fibre reinforced acrylic roof waterproofing treatment on the existing Space Frame (Pyramidal/Sloped) roof surface using the Sika or equivalent or better system, including surface preparation, joint sealing, priming, and multi-coat application to achieve a seamless, highly flexible, and UV-resistant finish. The work shall be executed as per the manufacturer's technical specifications & as per direction of Engineer in charge and includes the following steps:
Surface Preparation: Cleaning the substrate mechanically to remove all dust, loose friable material, oil, and cement laitance to achieve a sound surface.
Joint & Crack Sealing for Grid &Valley Treatment: Sealing connection joints, drain spouts, corners etc elements using Sikaflex®-127 or equivalent or better, a single-component, moisture-curing hybrid polyurethane sealant.
Flashing & Repair Tape: Applying Sika® Multi Seal AP or equivalent or better, a self-adhesive, rubber-modified bituminous sealing tape with aluminum foil, over broken roof, leaking gutters, or ductwork. The points where longitudinal and transverse valleys intersect (the "Plus +" Junctions) are critical where required.
Primer Coat: Applying Sikalastic®-11 W Primer or equivalent or better, a two-component water-based epoxy primer, applied by brush, roller, or squeegee at a consumption rate of 0.15 to 0.25 kg/sqm to stabilize the substrate and promote adhesion.
Base Coat: Applying the first coat of Sikalastic®-520 Cool Coat Fibers IN or equivalent or better (acrylic polymer dispersion with micro-fibers) at a consumption rate of 0.75 kg/sqm using a short pile roller, brush, or airless spray.
Top Coat: Applying the second coat of Sikalastic®-520 Cool Coat Fibers IN or equivalent or better at a consumption rate of 0.75 kg/sqm after the required inter-coat waiting time of approximately 6 to 8 hours.
Finish: The final surface should be seamless, uniform white (or specified color), with no pinholes or bubbles and a minimum dry film thickness (DFT) of 1000 microns. Note: The rate shall be inclusive of all scaffolding, safety arrangements for working at height and slope , and applying material on sloped/vertical surfaces, complete in all respect as per the direction of Engineer-in-Charge. | 2,860 | Sqm | 1,541.36 | ₹44,08,289.6 |
| 2 | XX | 1 | NOS | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.01 MB
BOQ_962910.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid