Tender Value
₹16.7 L
EMD Value
₹40,000
Closing Date
29 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer (East)
Executive Engineer (East), U.P State Road Transport Corporation, H. Q. Lucknow
Re Tender Construction of Passenger shelter at Village. Badhaya, siswabazar Distt. Maharajganj
2026_UPSRT_1196489_1
99/B/DA/E/Tender/2026
Open Tender
Civil Works
Lump-sum
Maharajganj
Please refer tender documents.
3 documents required · 3 mandatory
₹1,180
Executive Engineer (East), UPSRTC Lucknow
₹40,000
14 Oct 2026
14 Oct 2026
30 Oct 2026
14 Oct 2026
29 Oct 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as | 31.9 | cum | 139.4 | ₹4,446.86 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials DSR 2.26.1 All kinds of soil | 8.7 | cum | 99.58 | ₹866.35 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.10 | 7.5 | cum | 5,119.39 | ₹38,395.43 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :DSR 5.1.2 1:1.5:3 (1 cement :1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 8.8 | cum | 7,104.09 | ₹62,515.99 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers with water proof ply 12 mm thick DSR 5.9.21 | 10.3 | sqm | 661.23 | ₹6,810.67 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.DSR 5.9.1 | 23.8 | sqm | 307.98 | ₹7,329.92 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform with water proof ply 12 mm thick DSR 5.9.20 | 17.1 | sqm | 807.65 | ₹13,810.82 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete .DSR 5.22.1 Mild steel and Medium Tensile steel bars | 1,382 | kg | 84.11 | ₹1,16,240.02 |
| 9 | Brick work with common burnt clay (non modular) bricks of Class-150 in foundation and plinth in cement mortar 1:4(1 cement :4 coarse sand . (SI 6.1.1) | 2.1 | cum | 5,788.55 | ₹12,155.96 |
| 10 | Providing and fixing mild steel round holding down bolts with nuts and washer plate complete. DSR 10.19 | 93 | kg | 76.34 | ₹7,099.62 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Tendernotice_2.pdf
PDF • 1.18 MB
BOQ_2260473.xls
BOQ • 4.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .