| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.0 LAdmitted-Finance | ₹40.0 L | L1 | Admitted-Finance |
| 2 | L2₹41.0 LAdmitted-Finance 27 KARUPANAN STREET NAICKEN KADU GOBI 638 476 ERODE DIST | GOBI | ERODE | TAMIL NADU | 638476 | ₹41.0 L | L2 | Admitted-Finance |
| 3 | L3₹44.0 LAdmitted-Finance | ₹44.0 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S RATHIKA CONSTRUCTIONS L1 | P.V.CONSTRUCTIONS L2 | PRANEET AND CO L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing Heavy Jungle and disposing off to a place away from the site as directed by the Engineer in charge including all Labour charges, T&Ps etc., complete. | 1,460 | M2 | 5 ₹7,300 | 2 ₹2,920 | 5 ₹7,300 |
| 2.00 | Earth work excavation for foundation in HGS and and depositing on bank with initial lead of 10 m and initial lift of 2 m in Hard stiff clay Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per standard Specification as directed by the Engineer at site. | 200.01 | M3 | 150 ₹30,001.50 | 100 ₹20,001 | 200 ₹40,002 |
| 3.00 | Earth work excavating for foundation in depositing on bank with initial lead of 10m and initial lift of 2 m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting as per standard Specification as directed by the Engineer at site. | 189.06 | M3 | 200 ₹37,812 | 100 ₹18,906 | 150 ₹28,359 |
| 4.00 | Earth work excavation for Foundation in Hard rock by Wedging and Chiseling and trimming to proper shape where blasting is prohibited and stacking for measurements including all leads, lifts etc., as per standard specification and as per instruction of the Engineer at site. | 11 | M3 | 1,000 ₹11,000 | 10 ₹110 | 200 ₹2,200 |
| 5.00 | Filling the foundation and floor with M Sand including cost of sand, filling charges as per standard specification(watering & consolidation with all leads and lifts etc., complete. | 20 | M3 | 1,500 ₹30,000 | 1,000 ₹20,000 | 1,500 ₹30,000 |
| 6.00 | Plain cement concrete in CC 1:3:6, using 20mm HBG metal, including cost of cement, all materials, labour charges including solidation, curing, all leads, lifts, as per standard specification etc., complete. | 28 | M3 | 5,500 ₹1.5 L | 7,500 ₹2.1 L | 7,000 ₹2.0 L |
| 7.00 | PCC 1:2:4 mix using 20mm HB stone machine crushed metal without form work for plinth including cost of all labour, materials, lead, lift, curing, etc., complete. | 167 | M3 | 6,300 ₹10.5 L | 7,500 ₹12.5 L | 8,000 ₹13.4 L |
| 8.00 | PCC 1:2:4 mix using 20mm HB stone machine crushed metal with form work for plinth including cost of all labour, materials, lead, lift, curing, etc., complete. | 40 | M3 | 9,900 ₹4.0 L | 8,000 ₹3.2 L | 8,000 ₹3.2 L |
| 9.00 | Reinforced cement concrete in C.C. 1:1 ½ :3 mix for mat concrete with out form work using 12 to 20mm HBG machine crushed metal including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement | 3 | M3 | 9,000 ₹27,000 | 9,500 ₹28,500 | 8,000 ₹24,000 |
| 10.00 | Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal with form work for Breaker plinth including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. (But excluding cost of steel reinforcement.) | 33 | M3 | 14,000 ₹4.6 L | 10,500 ₹3.5 L | 8,000 ₹2.6 L |
Tender Value
Refer Docs
EMD Value
₹47,000
Closing Date
28 Jan 2026, 2:00 pmClosed
SE GCC CBE
office of the Superintending Engineer General Construction Circle 182 Dr Subbarayan Road Tatabad Coimbatore 641 012
Construction of 110 33KV SS plinth for enhancement of 110 33Kv bay at the existing Mudalipalayam 110 33KV SS
2026_EB_644047_1
ETS No. 55/25-26 of SE GCC Cbe
Open Tender
Civil Works
coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹47,000
Yes
12 May 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
Clearing Heavy Jungle and disposing off to a place away from the site as directed by the Engineer in charge including all Labour charges, T&Ps etc., complete.
Earth work excavation for foundation in HGS and and depositing on bank with initial lead of 10 m and initial lift of 2 m in Hard stiff clay Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per standard Specification as directed by the Engineer at site.
Earth work excavating for foundation in depositing on bank with initial lead of 10m and initial lift of 2 m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting as per standard Specification as directed by the Engineer at site.
Earth work excavation for Foundation in Hard rock by Wedging and Chiseling and trimming to proper shape where blasting is prohibited and stacking for measurements including all leads, lifts etc., as per standard specification and as per instruction of the Engineer at site.
Filling the foundation and floor with M Sand including cost of sand, filling charges as per standard specification(watering & consolidation with all leads and lifts etc., complete.
Plain cement concrete in CC 1:3:6, using 20mm HBG metal, including cost of cement, all materials, labour charges including solidation, curing, all leads, lifts, as per standard specification etc., complete.
PCC 1:2:4 mix using 20mm HB stone machine crushed metal without form work for plinth including cost of all labour, materials, lead, lift, curing, etc., complete.
PCC 1:2:4 mix using 20mm HB stone machine crushed metal with form work for plinth including cost of all labour, materials, lead, lift, curing, etc., complete.
Reinforced cement concrete in C.C. 1:1 ½ :3 mix for mat concrete with out form work using 12 to 20mm HBG machine crushed metal including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement
Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal with form work for Breaker plinth including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. (But excluding cost of steel reinforcement.)
Providing steel reinforcement MS/RTS rods upto16mm dia for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete.
Supplying and fixing of approved quality of MS Rails (90 LBS) for transformer plinth including in proper alignment and interconnections the two rails with flat on both ends by welding including labour, lead, lift etc. complete, as per standard specification.
Labour charges for assembling of various plinth template for providing concrete, including transporting from one plinth to another aligning fixing to correct level and dismantling the template after concrete, including cost of Labour lead, lift, etc., complete, as per standard specification.
Supplying and Fabrication of 20mm dia sizes of M.S grouting bolt including cutting, bending, threading 100 mm length including galvanizing and providing 2 nos. nuts with washer etc and fixing them in plinth including cost of material, Labour lead, lift, etc., complete, as per standard specification.
Supplying and Fabrication of 25mm dia sizes of M.S grouting bolt including cutting, bending, threading 100 mm length with galvanized and providing 2 nos. nuts with washer etc and fixing them in plinth including cost of material, Labour lead, lift, etc., complete, as per standard specification.
Brick work in C.M 1:5 using chamber burnt class II bricks, for Breaker approach steps & Cable duct including, cost of cement, all materials, labour, curing, all leads and lifts, etc complete as per Standard Specification.
Supplying and fixing readymade earth collars of size 45 cm inner dia with 30 cm height and shell thickness of 40 mm including cost of all materials,transport to site , labour, lead, lift, etc., complete., as per standard specification.
Supplying and fixing PVC bib cock including cost of all materials, labour, lead, lift, etc., complete., as per standard specification,
Supplying, fixing, laying and testing of 25mm dia PVC pipe 10kg/cm2 pressure of approved good Quality ISI make for earth pit including cost of pipe, GI specials, all materials, lead, lift, etc., complete, as per standard specification.
Supplying and fixing, laying and testing of 40mm dia PVC pipe 10kg/cm2 pressure of approved good Quality ISI make for earth pit main line including cost of pipe, GI specials, all materials, lead, lift, etc., complete, as per standard specification.
Supplying & fixing of PVC Gate Valve 25mm with ISI make for PVC water Supply arrangements including cost of Pipe, Bend, Tee, l - Bow, reducer etc., as required of all mateials, lead, lift , Labour charges ete. Complete.
Supplying & fixing of PVC Gate Valve 40mm with ISI make for PVC water Supply arrangements including cost of Pipe, Bend, Tee, l - Bow, reducer etc., as required of all mateials, lead, lift , Labour charges ete. Complete.
Supplying and spreading of 20 metal to a thickness of 100mm over the quarry dust of 100 thickness layer inside the yard including cost of all materials, labour charges , all leads, lifts, as per standard specification etc., complete.
Disposal of surplus hard rock away in low lying area with a lead of 100 Mts including spreading and levelling labour, lead, lift as per standard specification, etc., complete.
Filling the low lying areas with gravel and consolidating in 150mm thick layers, well rammed with all leads and lifts , watering, as per standard specification, etc., complete.
Plastering with CM 1:3, 12mm thick, including cost of cement, labour, curing, all leads and lifts as per standard specification, etc., complete.
Colour washing with two coats using ready mixed Weather Proof Exterior Emulsion (First quality - Apex or its equivalent) of approved quality and colour over a coat of exterior emulsion water based primer for Plinth exterior surfaces including through scrapping, clan removal of dirt, cost of all materials, scaffolding, Labour, Lead, Lift etc., complete and including necessary crack filling paste, putty whereever required.
Fabrication and supplying fixing LAS wicket gate using structural steel ,angla,flat,plates squres etc as perdirection of Engineer with two coat of approved enamal paint over one coat of primer including cost of all materials, labour charges , all leads, lifts, etc., as per standard Specification complete.
Supplying, Fabrication, galvanishing and fixing of GI angles for fencing coner post of size 75x75x6mm & height 2.44 m with fixing in position of 50x6mm Galvanished MS Flat to tie the chain link fencing with fence post of 2.20 m in length including cost of fixing charges, all materials, lead, lift, as per standard specification, etc., complete.
Supplying, Fabrication, galvanishing and fixing of GI angles for fencing intermediate post of size 65x65x6mm height 2.44 mwith fixing in position of 50x6mm Galvanished MS Flat to tie the chain link fencing with fence post of 2.20 m in length including cost of fixing charges, all materials, lead, lift, as per standard specification, etc., complete.
Supplying ,laying and tensioning of chain link fencing with height of 1.85 m tying with intermediate post using GI flat with bolt & nut including cost of all materials, labour charges all leads, lifts, etc., as per standard Specification complete.
Supplying and laying and fixing of 75mm dia PVC pipe to resist 6 Kg/cm2 water pressure to proper alignment & slope for weep holes as required and as directed by the Engineer at site including cost of pipe and fixing in position, testing all matrials solution , lead, lifts etc., complete.
Labour charges for Transporting of all types of fence post to working site, keeping them alignment and erecting them in position including lead, lift, labour etc., complete.
Dismantling for Stone Masonry Existing as per direction of Engineer incharge at site including all lead, labour, lift, etc., complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_771709.xls
BOQ • 0.35 MB
55s.pdf
Tender Documents • 0.59 MB
Download all tender documents and submit your bid