Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.9 LAccepted-AOC | L1 | Accepted-AOC awarded |
Tender Value
₹47.1 L
EMD Value
₹78,300
Closing Date
17 Mar 2020, 4:00 pmClosed
Executive Engineer Division No-I HPPWD Shimla-3
Executive Engineer Division No-I HPPWD Shimla-3
Long Wood to Kelti road Km.0/00 3/190 ) Bhatta Kuffer to Koti Road Isolation Hospital road
2020_PWD_35901_8
SD-I-CTR-Tender-25221 dt 17-02-2020
Open Tender
Civil Works
Item Rate
60 days
Shimla
AS per SBD
14 documents required · 14 mandatory
₹2,000
Executive Engineer Division No-I HPPWD Shimla-3
₹78,300
25 Aug 2020
4 Mar 2020
18 Mar 2020
4 Mar 2020
17 Mar 2020
4 Mar 2020
Amount
Providing and applying tack coat with paving Bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.25 to 0.30Kg. per sqm (zero point two five to zero point three zero kilogram/square metre) on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying 30mm (thirty milimetre)thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes(seventy five tonnes) per hour crushed aggregates of specified grading, premixed with bituminous binder @ 5.40 to 5.60 per cent (five point four zero to five point six zero percent) of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.508. (i) 30mm(thirty milimetre) thick.
Earth work in excavation for structure in all depths as per drawing and technical specification for rural roads August 2004 clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lift including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where balsting is prohibited) all earth work in cutting/ excavation including rock excavation shall be carried out true to lines grades, side slopes, width , camber super elevation and level as shown on the drawings or as directed by the Engineer-in-charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified dimension or as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost).Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be dully compensated by him at his on cost in all cases including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802,803,1202 & 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. I. P.C.C. grade M 10 (i) Nominal mix 1:3:6 (one cement :three sand: six graded stone aggregate)
Stone soling properly hand packed filling interstices with spalls and consolidating with power road roller to the required gradient and camber including spreading, watering and rolling of binding materials, moorum or earth etc. complete as per HP PWD specification 100mm (one hundred milimetre)spread thickness (finished work including materials and labour) including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .