| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.7 LAccepted-Finance | ₹88.7 L | L1 | Accepted-Finance Low Rate |
| 2 | L2₹89.7 LRejected-Finance | ₹89.7 L | L2 | Rejected-Finance Hight Rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT OK |
| Sl No | Description | Qty | Unit | M/s Sharada Electricals L1 | M.K.S Enterprises L2 |
|---|---|---|---|---|---|
| 1.00Supply of following Decentralized materials Provide by Contractor at the works site as per RESSPO norms. | |||||
| 1.01 | X-arms holding clamps with bolts & nuts for ST/PCC Pole | 240 | No. | 270 ₹64,800 | 265 ₹63,600 |
| 1.02 | M.S clamp for Top, T-off channel with bolts & nuts | 160 | No. | 230 ₹36,800 | 230 ₹36,800 |
| 1.03 | Stone pad 300x300x75 mm | 330 | No. | 50 ₹16,500 | 40 ₹13,200 |
| 1.04 | F-bracket with bolts & nuts for ST/PCC Pole | 254 | No. | 200 ₹50,800 | 190 ₹48,260 |
| 1.05 | Danger board with clamp & bolts for ST/PCC Pole | 254 | No. | 150 ₹38,100 | 190 ₹48,260 |
| 1.06 | Guarding Angle | 80 | No. | 170 ₹13,600 | 160 ₹12,800 |
| 1.07 | E-bracket with bolts & nuts | 10 | No. | 150 ₹1,500 | 145 ₹1,450 |
| 1.08 | P.G clamps | 90 | No. | 210 ₹18,900 | 105 ₹9,450 |
| 1.09 | LT Clamp | 90 | No. | 210 ₹18,900 | 195 ₹17,550 |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
19 Dec 2025, 2:00 pmClosed
SUPERINTENDING ENGINEER EDC MIRZAPUR
FATAHA, MIRZAPUR
Under the deposit scheme year 2025-26, under the Electricity Distribution Division-Mirzapur, under the Government and Private Deposit Scheme, construction of 11 KV line, LT line and line shifting work including installation of transformers of differe
2025_PVVNV_1096094_1
30/EDC(M)/2025-26
Open Tender
Electrical Works
365 days
SUPERINTENDING ENGINEER EDC MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Executive Engineer(A)
₹90,000
24 Dec 2025
5 Dec 2025
20 Dec 2025
5 Dec 2025
19 Dec 2025
5 Dec 2025
Amount
Supply of following Decentralized materials Provide by Contractor at the works site as per RESSPO norms.
X-arms holding clamps with bolts & nuts for ST/PCC Pole
M.S clamp for Top, T-off channel with bolts & nuts
Stone pad 300x300x75 mm
F-bracket with bolts & nuts for ST/PCC Pole
Danger board with clamp & bolts for ST/PCC Pole
Guarding Angle
E-bracket with bolts & nuts
P.G clamps
LT Clamp
Z-Clamp
Suspension Clamp
NEUTRAL CUM EARTH WIRE
EYE HOOK
Dead end clamp for Suspension
Dead end clamp
Alluminium Lug of Different size
LT Shackle Insulator
NUT AND BOLT for Shackle Insulator
COPPER L-PIECE 50*225*10 MM SQ
COPPER L-PIECE 62*225*12 MM SQ
SINGLE PHASE METER BOX
SINGLE PHASE METER BOX CLAMP
3 PHASE DRISTIBUTION BOX
3 PHASE DRISTIBUTION BOX CLAMP
BARBED WIRE
LOOP GARD
JOINTING KIT OUTDOOR/INDOOR
ALUMINIUM BINDING WIRE
T/F CLAMP
Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge.
STP Poles,11 meter long
PCC Poles,11 meter long
PCC Poles,8.5 meter long
Line materials with ACSR Weasel Conductor etc
Transformer10 KVA
Transformer25 KVA
Transformer63 KVA
Transformer100 KVA
Transformer250 KVA
Transformer400 KVA
11 KV XLPE Cable size 3x70/120/185mm2
11 KV Pilfer proof metering cubicle
LT PVC Cable 3.5x25mmsq
LT PVC Cable 3.5x50mmsq
LT PVC Cable 3.5x70mmsq
11 KV CT/PT Combined unit.
Erection
Erection of single support ST/PCC Pole for construction of 11 KV Line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms(cement sand & brick ballast wil be supplied by the constractor on his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing of Poles
Erection of Sectional Double Pole Structure of ST/PCC Pole including digging of pit. Fitting of accessories back fitting of earth, earthing, grouting of each pole & all stay sets (coment sand & brick ballst will be supplied by the contractor on this own his own cost) & other required works.
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering.
Stringing & sagging of LT line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering.
Drill/cut stone for erection of pole/stay in hill Area
Mounting of 10 KVA Transformer along with HT< Connections per RESSPO norms.
Mounting of 25 KVA Transformer along with HT< Connections per RESSPO norms.
Mounting of 63 KVA Transformer along with HT< Connections per RESSPO norms.
Mounting of 100 KVA Transformer along with HT< Connections per RESSPO norms.
Mounting of 250 KVA Transformer along with HT< Connections per RESSPO norms.
Mounting of 400 KVA Transformer along with HT< Connections per RESSPO norms.
Laying, of 11 KV XLPE cable aiongwith cost of bricks & sand as Per RESSPO norms
Grouting of11 KV Line as per RESSPO norms
Filling of 11cable jointing kit size 3x70/120/185mm2 11 KV indoor type as per Respo norms.
Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing nut and bolts after checking allgnment with trench & connecting incomming & outgoing cable in the CT Chamber as per RESPO norms.
Installation of CT/PT combind unit as per RESPO norms
Connection of LT/PVC service cable for consumers
PLINTH OF 250 KVA T/F
PLINTH OF 400 KVA T/F
FANCING OF 250 KVA T/F
FANCING OF 400 KVA T/F
WELL TYPE EARTHING 100/250/400 KVA
Receive back material Of ACSR weasel/dog conductor etc from work site to store centre mzp
Receive back material Of Scrap iron from work site to store centre mzp
M.K.S Enterprises (BID ID -5756641)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_2017645.xls
BOQ • 0.27 MB
TC.pdf
Tender Documents • 0.39 MB
Download all tender documents and submit your bid