| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | -0.50% | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.6 L+₹1,276.44 (0.50%)Admitted-Finance 32 LOOTERY MOHAL ORDERLY BAZAR PO BARRACKPORE DIST 24 PARGANAS NORTH KOLKATA 700 120 W B | KOLKATA | 24 PARGANAS NORTH | WEST BENGAL | 700120 | +0.00% | ₹2.6 L+₹1,276.44 (0.50%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 L+₹5,105.76 (2.01%)Admitted-Finance 123 2 9 BECHARAM CHATTERJEE ROAD BEHALA KOLKATA 700034 | KOLKATA | SOUTH 24 PARGANAS | WEST BENGAL | 700034 | +1.50% | ₹2.6 L+₹5,105.76 (2.01%) | L3 | Admitted-Finance |
| 4 | L4₹2.6 L+₹7,658.65 (3.02%)Admitted-Finance | +2.50% | ₹2.6 L+₹7,658.65 (3.02%) | L4 | Admitted-Finance |
Tender Value
₹2.6 L
EMD Value
₹5,200
Closing Date
10 Sept 2026, 11:00 amClosed
EXE. ENGR
516 D H ROAD KOL-34
MAINTENANCE OF PAVER BLOCK PAVEMENTS AT DIFFERENT PLACES OF SAHEB MAHAL, MALAKAR PARA, KEDARNATH ASRAM, GOBORJHURI ETC. UTTARAN AREAS IN WARD NO. 117, BR.-XIII
2026_KMC_1039883_1
KMC/XIII/117/004/26-27/UTTARAN
Open Tender
CIVIL WORKS
Percentage
60 days
W-117
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹5,200
12 Sept 2026
1 Sept 2026
12 Sept 2026
1 Sept 2026
10 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including
spreading the spoils properly over the flank as necessary or on berm
to approximate grade & camber and rolling the sub-grade with power
roller to proper camber and grade as per direction and satisfaction of
Engineer-in-charge including uprooting and removing plants and
jungles when and where necessary.
(a) Depth up to 150 mm. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 3.16
Page No.240) | - | SQUARE METER | 14.4 | - |
| 2 | Supplying, spreading and compacting Sand to required thickness, in
layers not exceeding 150 mm to proper gradient and camber,
inundating each layer by water and packing and ramming layer by
layer to achieve desired compaction, including lighting, guarding,
barricading and making adequate earthen bundh where necessary,
curing with water as per direction, mending cracks and depressions
by ramming wherever necessary.
Note:- Add cost at site of the materials to arrive at the complete rate.
The compaction factor for dry, clean sand may be taken as 0.835.
(The payment is to be made on the basis of finished compacted
volume).
(c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page
No.245 & page-222 sl. No-4) | 1 | CUBIC METER | 1,172.6 | ₹1,172.6 |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and
dressing bed to proper level and filling joints with local sand. ( Ref
:PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda
dtd-04.06.18,P-1) | 1 | SQUARE METER | 361 | ₹360.96 |
| 4 | Labour for laying single brick flat soling including ramming and
dressing bed to proper level and filling joints with powdered earth. (
Ref :PWD (Bldg.)-2017, It. No. 2, Page No. 14) | 1 | SQUARE METER | 40 | ₹40 |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20
mm nominal size) excluding shuttering and reinforcement,if any, in
ground floor as per relevant IS codes. a) Pakur Variety ( Ref :PWD
(Bldg.)-2017, page-24 (item -4(a), consumption chart pg-B-60, sl-1
and Annexture-II , Format-A, 3rd Corrigenda & addenda p-10
dtd-04.06.2018, PWD(R&B) 2018, Chapter-1, pg-227 I-1.03,
pg-230,Table-I , Table III-2 pg-226, ) | 1 | CUBIC METER | 5,732.59 | ₹5,732.02 |
| 6 | SUPPLYING AND LAYING IN THE SPECIFIED PATTERN OF
INTERLOCKING CONCRETE BLOCK PAVEMENTS (ICBP) WITH
CONCRETE BLOCKS (WITH CONCRETE GRADE AS SPECIFIED
AS PER TABLE 1 OF IS 15658: 2006) MANUFACTURED FROM BIS
LICENSEE MANUFACTURER, WITH SPACER NIB (SMALL
PROTRUDING PROFILES ON THE VERTICAL FACE OF PAVER
BLOCK USED AS A DEVICE FOR KEEPING MINIMUM JOINT GAP
IN BETWEEN THE PAVING BLOCK, AS PER CL. NO 3.26 OF IS
15658) AND OF
SPECIFIED SIZE AND SHAPE WITH ASPECT RATIO (THE RATIO
OF LENGTH TO THICKNESS OF A PAVER BLOCK, AS PER CL.
NO. 3.3 OF IS: 15658) AS PER TABLE 1 OF
IS 15658 WITH FLEXURAL STRENGTH / BREAKING LOAD AS
PER ANNEXURE G OF IS: 15658, ON THE PREPARED BASE
COURSE OF SPECIFIED CBR AS PER TABLE 1 OF IRC SP 63
(2018) OR ELSE AS OF 25-35 MM THICK (GRADING OF THE
BEDDING SAND
AS PER CLAUSE 6.5.1 OF IRC SP-63) AND FILLING UP THE
GAPS IN BETWEEN PAVER BLOCKS WITH JOINT FILLING SAND
(THE GRADING OF THE JOINT FILLING SAND WILL BE AS PER
CLAUSE 6.5.2 OF IRC SP 63) AND COMPLETING THE EDGES
WITH CUT BLOCKS AS PER CL. NO. 8.7 OF IRC SP 63(2018)
WITH PROPER CONFINEMENT OF BEDDING AND JOINT FILLING
SAND , COMPACTION , LEVELING AND FILLING UP OF THE
EDGE GAPE. 50MM THICK.
(II) COLOUR DECORATIVE | 1 | SQUARE METER | 875 | ₹874.91 |
| 7 | Laying of interlocking Paver Blocks as per approved design over
20-30mm th medium yellow sand bed with true to line,lavelling,proper
compaction with vibrator etc. with jointing with kerb/edge should be
made with Cement Concrete (1:2:4)etc. as per the direction of the
Engineer-in-charge and including cost of materials,labour etc.
complete | 1 | SQUARE METER | 124 | ₹123.99 |
| 8 | SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in
position reinforced cement polymer concrete manhole /gully pit cover
with matching frame.As per I.S-12592(M.D) (iv) 15 MT load bearing
capacity round manhole cover provided with two lifter hooks fitted
with matching frame of size Cover: 460 mm X 75 mm Frame: 620 mm
X 150 mm opening: 360mm Weight: 100 kg (approx) | - | EACH | 2,536 | - |
| 9 | Raising cover and frame of Special Inspection Pit with CBW (1:4),
250 mm thick up to 100mm high with 20mm thick sand and cement
plaster (1:4) including finishing with neat cement after cutting the
asphaltum pavement taking out and re-fixing the existing cover and
frame with cement concrete (1:1.5:3) with stone chips all round the
frame surface including removal of surplus spoils. ( Ref :Rate based
on PWD Current SOR,
PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a),
p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226,
PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date
04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60,
sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018,
p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria &
Adda, Page-4, Date 08.01.2018, page-12 (item -13)) | - | EACH | 1,758.9 | - |
| 10 | Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick
up to 100mm high with 20mm thick sand and cement plaster (1:4)
including finishing with neat cement after cutting the asphaltum
pavement taking out and re-fixing the existing cover and frame with
cement concrete (1:1.5:3) with stone chips all round the frame
surface including removal of surplus spoils. ( Ref :Rate based on
PWD Current SOR,
PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a),
p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226,
PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date
04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60,
sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018,
p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria &
Adda, Page-4, Date 08.01.2018, page-12 (item -13)) | - | EACH | 1,507.28 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_2553765.xls
BOQ • 0.29 MB
TForm117042627UTTARAN.pdf
Tender Documents • 0.23 MB
AddlSpc.pdf
Additional Documents • 3.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .