Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.8 LAccepted-AOC | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹32.5 L+₹3.7 L (12.7%)Rejected-AOC JYOTI BAKERY 1ST FLOOR A5 HSEDRI G RZA 5 PALAM NEW DELHI SOUTH WEST DELHI DELHI 110045 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110045 | L2 | Rejected-AOC Not L1 Bidder | |
| 3 | L3₹35.8 L+₹7.0 L (24.4%)Rejected-AOC ROOM NO 145 MASJID WALI GALLI GANESH MURTI NAGAR PART NO 2 COLABA MUMBAI 05 | L3 | Rejected-AOC Not L1 Bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical MORE THAN 05 TIMES RESIDUAL LOAD ON CONTRACTOR |
Tender Value
₹44 L
EMD Value
₹88,000
Closing Date
18 Apr 2025, 6:00 pmClosed
GE U WATER SUPPLY DELHI CANTT 10
GE U WATER SUPPLY DELHI CANTT 10
PETTY REPAIRS FOR ATTENDING DAY TO DAY EM EXTERNAL WATER SUPPLY COMPLAINTS AT MOUDE ROAD AREA ARJUN VIHAR CARRIAPPA VIHAR AREA PRATAP CHOWK KHYBER LINES MANEKSHAW CENTRE PUMP HOUSE BAIRD PLACE AND ALLIED AREA IN THE AREA OF AGE U WS No II UNDER GE U
2025_MES_702216_1
GE/WS/Token-54 OF 2024-25
Open Tender
Civil Works
Item Rate
330 days
GE U WATER SUPPLY DELHI CANTT 10
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
GE U WATER SUPPLY DELHI CANTT 10
₹88,000
Yes
10 Jun 2025
21 Mar 2025
21 Apr 2025
21 Mar 2025
18 Apr 2025
4 Apr 2025
Amount
Labour only for attending day to day external/treated water supply complaints of all nature including grey water pipe leakage i.e leakage in water supply pipe lines , fitting/fixture, over flow of overhead tank, no water supply in supply tank/direct kitchen tap and grey water supply in various locations & taking out water from trenches during repair including note down the complaints in complaint register complete all as specified and as directed (Note:- Any material required for attending complaints shall be measured and paid separately under respective item herein after as 'Supply only').
Labour only for attending day to day electric supply complaints of day to day maintenance of existing LT Panels involving replacement of meterials including connecting electrical accessories / spares of water supply installation from 0830 hrs to 1730 hrs and electrical fitting & light, short circuits in pump house including Note down the complaints from various locations in complaints register and distribution to the trademen complete all as directed. (Note:- (i) Any meterial required for atteding complaints shall be measured & paid seperately under respective item here after as 'supply only') (ii) The suitable shift duites as deems fit shall be decision of the Engr-in-charge
Notes for Item No 1.01 & 1.02 :- (i) Any material required for attending complaints shall be measured & separately under respectvie items here - in- after. (ii) The complaints shall be attended and the defetcs shall be rectified by a team of matric qualified having minimum 03 years experienced electrician/Plumber as applicable assisted with adequate number of helpers as directed by Engineer-in-charge. (iii) The complaints shall be attended & defect shall be rectified within 08 hrs commencing from date and time of notifying the complaint failing which a penalty @ Rs 200/- per complaint per day (08 hrs) shall be levied upon/imposed on the contractor and recovery shall be made from contractor's dues. (iv) In case, after checking & attending the defect, it is not possible to rectify the defect within 08 hrs, the facts shall be brought to the notice of Engineer-in-charge by the contractor/his rep. If Engineer-in- charge is satisfied with contractors view, no recovery will be made. (v) While attending the complaint of water supply if earth work is required then the same shall be measured and paid seperately under appropriate item of Sch 'A' of BOQ. However, no extra payments shall be made for dewatering. (vi) Cutting of GI pipe in position and threading is also deemed to be included in the job rate (Fittings and fixtures will be measured and paid separetely under respective items of Sch as 'supply only'). (vii) All T&P required for attending the Complaints shall be provided by the contractor.)
(viii) The Pipe Fitter shall always be in possession of die set complete with cutters,Taps, Pipe wrench, Chain wrench, Caulking tools, complete set of spanners and ladders etc as required at site. (ix) The Electrician shall always in possession of all Electrician tools, LT Megger, Earth Tester, Multimeter, Crimpling tool, insulation tape, Hand gloves etc required at site. (x) Rate for taking down/out existing & fittings & fixtures and refixing to make it functional shall be into account. All the fitting & fixtures shall be measured and paid supply only in respective items of BOQ i.e. Ser Item No. 3 to 16, 17, 18.01 to 18.05, 24, 44 to 50 and 54 to 60. (xi) A BOO ordered for material procured by contractor and taken on charge through RV and complaint wise dockets will maintained and USR's duly vetted by AO GE (E/M) for procured materials issued for incorporation in work will be mentioned in BOO. BOO will concorn/approved by Accepting Officer in one time for complete materials to be consumed in work and if any balance quantity of material left with contractor the same will received back on credit USR's & kept on record. (xii) Old U/s material iron scarp obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV of weight in (KG) shall be taken into account and attach with RAR/F Bill).
Supply only in replacement of GI socket Med grade ISI marked of following sizes :
15 mm bore
20mm bore
25mm bore
40mm bore
50mm bore
80mm bore
Supply only in replacement of GI Elbow Med grade ISI marked of following sizes :
15 mm bore
20mm bore
25mm bore
40mm bore
50mm bore
Supply only in replacement of GI Union Med grade ISI marked of following sizes :
15 mm bore
20mm bore
25mm bore
40mm bore
50mm bore
Supply only in replacement of GI Nipple of different length as per requirement, both end screwed Medium Grade, ISI marked of following size:-
15 mm bore
20mm bore
25mm bore
40mm bore
50mm bore
Supply only PVC 'L' type Holder suitable for Aluminium rod,Float Ball etc all as required at site and complete all as specified and as directed of following Sizes:-
15 mm bore
20 mm bore
25 mm bore
Supply only in replacement GI Reducing socket Med grade ISI marked of following sizes :
25mm x 15mm bore
20mm x 15 mm bore
25mm x 20mm bore
40 mm x 20 mm bore
40 mm x 25 mm bore
50 mmx 20mm bore
Supply only in replacement GI Reducing Elbow medium grade ISI marked of the following sizes :-
20mmx15mm bore
25mmx15 mm bore
Supply only in replacement GI Tee of different length as per requirement, both end screwed Medium Grade, ISI marked of following size:-
15mm x 15mm x15 mm bore
20mm x 20mm x 15 mm bore
20mm x 20mm x 20 mm bore
25mm x 25mm x 25 mm bore
25mm x 25mm x 15 mm bore
25mm x 25mm x 20 mm bore
40mm x 40mm x 20mm bore
40mm x 40mm x 25mm bore
Supply only in replacement GI solid plug heavy duty ISI marked of following sizes :
15 mm bore
20mm bore
25mm bore
40mm bore
Supply only of Lead Pig bar of standard quality inclosed container complete all as specified and directed.
Supply only of Spun yarn
Supply only of gland packing of any size
Supply only 3mm thick rubber gasket of standard quality complete all as specified and directed.
Supply only in replacement PTMT Float valve with epoxy coated aluminium rod and high density HDPE ball (as per manufacturer's instructions) of following sizes complete of following sizes :
15 mm bore
20 mm bore
25 mm bore
40 mm bore
50 mm bore
Supply only Tank Nipple suitable for HDPE water tank 20 mm dia
Supply only in replacement of gun metal gate valves with iron wheel head screwed both ends for iron pipe, ISI marked, as per IS : 778 of following sizes complete all as specified and as directed:-
15 mm bore
20 mm bore
25 mm bore
40 mm bore
50mm bore
M&L for testing of drinking water being collected from local source (bore wells / shallow wells/under ground sumps) one test in one month for one source in the area under AGE (U) W/S No-II as directed by EIC and submission of detailed test report to the office of Engineer-in-Charge. (a) Collection of water from different sources of water ie Sump, bore wells & shallow wells in sterilized bottle and testing in Govt Approved laboratory as mentioned in specification. (b) Carrying out minimum essential testing of water as per IS 10500-1991 mandatory for chemical colour, odour, taste, turbidity, Lead, PH value TDS total hardness, iron, chloride, fluride and residual free chlorine and Bacteriological total Collie from organisms per 100 ml (MPN) and E Collie in 100 ml) and submission to this office with specific recommendation regarding suitability of water for drinking purpose. Note :- Rate quoted shall deemed to be included for : - (i) Cost of sterilized bottle as required. (ii) To and fro transportation charges for collection of samples from source(sump/bore well/shallow wells) (iii) Contractor will required to visit the site of AGE (U) W/S-II area for working out number of sources i.e borewells/shallow wells/under ground sumps etc. Approximately 16 Number of tests will be carried out in eleven months period. (iv) Period of testing of water sources is of 11 (Eleven) months from the commencement of work. (v) Mode of payment: - Payment will be made after completion of work as one JOB for 11 (Eleven) months for number of tests. Part payment will be allowed after dividing number of months in quoted unit rate.
Excavation in trenches not exc 1.5 M wide and not exc 1.5 M in depth for pipe line, etc in soft/ loose soil getting out and levelling of bottom surface to required level complete all as specified and as directed.
Returning filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm thick complete all as specified and as directed.
Removing excavated material to a distance not exc 50 m and depositing where directed not exc 1.5 meters above the starting point complete all as specified and as directed.
Surface dressing of uneven surfaces of the natural ground, rough excavated surfaces and filled area where ordered shall be trimed to an even surface horizontal or slopping, by removing vegetation and by scrapping high patches and filling low patches with the scrapping soil to given an even and neat look to the site. depth of cutting not exceeding 15 cm complete all as specified and directed by Engineer-in-Charge.
Supply only in replacement 15 mm bore Bib tap in replacement of old standard of PTMT any colour high pressure screwed for male/ female treaded, for UPVC pipe of size 15mm bore with not less than 75 gram complete all as specified and as directed. (Note:- Old U/s material obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV of PVC scrap in weight (KG) shall be taken into account and attach with RAR/F Bill.
Labour work required for taking out suction pipe from sump of any capacity 80 mm to 200 mm size screw / flanged type and relowering after refixing in position the same duly cleaned / minor repair if any required such as replacement of rubber gasket / lifting bolts & nuts including making thread for the suction pipes off sizes etc complete all as specified and directed by Engineer - in - charge
Supply and fixing in replacement rotational moulded polyethylene water storage tank, cylindrical vertical with closed top, 500 litres capacity, tripple layered, hoisted and fixed in position after taking down as existing at site (of any capacity) complete all as specified and as directed..
Supply and fixing in replacement rotational moulded polyethylene water storage tanks, cylindrical vertical with closed top, 1000 litres capacity, tripple layered, hoisted and fixed in position after taking down as existing at site (of any capacity) complete all as specified and as directed. (Note for ser item No 26 & 27 :- (i) For Pump Priming purpose in pump house. (ii) Old U/s material PVC tank obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV of PVC scrap in weight (KG) shall be taken into account and attach with RAR/F Bill. (iii) Tank shall be provided on PCC (1:2:4) type B-I using 20mm graded crushed stone aggregate ramp of 150mm thick round shape over roof slab or in ground floor over sub base of PCC (1:4:8) type D-2 using 40mm graded crushed stone aggregate and top surface of ramp finished even and smooth using extra cement complete the cost of ramp will be deemed included in quoted unit rate.)
Supply and fixing in replacement GI pipe "medium grade" ISI marked including all fittings as in walls,ceilling ,roof and trenches complete all as specified and as directed of following sizes :- (Note:- Old U/s material obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV of iron scrap in weight (KG) shall be taken into account and attach with RAR/F Bill.
15 mm dia
20 mm dia
25 mm dia
40 mm dia
50 mm dia
80 mm dia
S & F in replacement of old worn out/broken cast iron/ DI fitting for flanged /spigot and socketed pipes such as bends , reducer, tee pieces , tail pieces , collar, cross , caps & plug upto 150mm bore complete all as specified and directed. (Note:- Old U/s material CI/DI fitting obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV in weight (KG) shall be taken into account and attach with RAR/F Bill.
80 mm bore
100 mm bore
150 mm bore
200 mm bore
S & F in replacement PPR Pipe PN-16, SDR 7.4 of following size :- (Note:- Old U/s material PPR Pipe obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV of PVC scrap in weight (KG) shall be taken into account and attach with RAR/F Bill.)
20 mm bore
25 mm bore
50 mm bore
90 mm bore
110 mm bore
Supply and fixing in replacement of old mild steel work for manhole cover, stair case steps made of MS angle/ flats/channels etc including cutting out top and bottom to shape as directed, drilling holes, notching for wire etc flat iron fillets including all necessary drilling, bolting or rivetting etc and similar works confirming to Fe-290, Gde E-165 and applying two coats of synthetic enamel paint over a coat of red oxide primer including preperation after demolition of existing covers,steps etc complete all as specified and as directed. (Note:- Old U/s material frame work obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV in weight (KG) shall be taken into account and attach with RAR/F Bill.)
M&L including jointing and testing of cast iron sluice valves class PN-1.0, conforming to IS:14846 flanged ends drilled having stainless steel spindle with cast iron wheel at top complete with nuts, bolts, washers and rubber gaskets including taking out unserviceable sluice valve and removal from site for the follwing sizes complete all as specified and directed:- (Note:- Old U/s sluice valve material obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV in numbers (EACH) shall be taken into account and attach with RAR/F Bill.)
80 mm bore
100 mm bore
150 mm bore
200 mm bore
Supply, fixing, jointing and testing of Cast iron Non Return valve without by pass arrangement, swing type, confirming to IS 5312, flanged ends pressure rating PN 1.0 complete including taking out unsv NRVcomplete all as specified and as directed at site by the Engr-in-Charge. (Note:- (i) Flanged joints complete with jointing material shall deemed to be included in the unit rate of this item. (ii) Old unserviceable NRV shall be taken on charge and enter in demolition / salvage register in 'EACH' and attach the same page of salvage register with each RAR.)
100 mm bore
150 mm bore
Supply, fixing, jointing & testing Cast Iron Foot Valve flanged ends, swing type operation with rubber sheet confirming to IS 4038 complete including taking out unsv Foot Valve complete all as specified and as directed. Note:- (i) Flanged joints complete with jointing material including replacement of SS Hexagonal nuts, bolts and washers of suitable size including replacement of flange gasket of suitable thickness shall deemed to be included in the units rate of this item. (ii) Old U/s material foot valve obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV in quanity (EACH) shall be taken into account and attach with RAR/F Bill.)
100 mm bore
150 mm bore
Supply, installation and testing of flanged ends Water Meter woltman type, including testing and making good connection with flanged ends, with gasket rubber sheet and nut & bolts etc ISI Marked fixing in horizontal/incline/vertical position, including taking out unserviceable water meter of following sizes complete all as specified and as directed at site by the Engineer-in-Charge. (Note:- (i) Flange Joints Including Jointing material shall deemed to be included in the unit rate of this item. (ii) Old U/s water meter obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV of water meter in number (EACH) shall be taken into account and attach with RAR/F Bill)
80 mm bore
100 mm bore
150 mm bore
Material & Labour for painting on steel and iron surfaces with one coat of synthetic enamel paint as per existing colour scheme or pattern complete all as specified and directed
Supply and filling Multipurpose Grease lubricant for Motors & Pumps complete all as specified and as directed at site by the Engr-in-Charge. (Note:- Lubricant shall be provided in sealed container only.)
Supply & Fixing in replacement of XLPE insulated, armoured heavy duty electric cables with aluminium conductor, 1100 volts grade of following sizes complete all as specified and directed (Note : Earth work excavation will be measured and paid seperately under relevant items)
Cross-sectional area 16 Sqmm x 4 core
Cross-sectional area 25 Sqmm x 3.5 core
Cross-sectional area 35 Sqmm x 3.5 core
Cross-sectional area 50 Sqmm x 3.5 core
Cross-sectional area 120 Sqmm x 3.5 core
Labour only for laying existing burnt bricks sub class 'B' old size obatined from taking down of LT XLPE cable laid in trenches with equal to length of bricks across the cable for cable protection complete all as specified and as directed.
Supply and spread clean dry river sand to required width at bottom and top for cable cushioning all as specified and as directed. (Note: Punned down thickness of sand shall only be taken for measurement & payment.)
Material and Labour & laying of Burnt bricks sub class 'B' old size laid in trenches with equal to length of bricks across the cable for cable protection all as specified and as directed
Repair/maintenance of juction box/pole box as per site including serviceable of bus bar, MCB & changing of cable or make it serviceable condition complete all as specified and directed.
Supply only in replacement elecrtonic timer type ST 100 for fixing in panel complete all as specified and as directed
Supply only in replacement of Fully automatic Star-Delta Starter with sheet metal enclosure ML 1.5 complete all as specified and directed.
Supply only in replacement of 3 pole power contactor Type MNX 25, 110 Amp ,415/220 volts ,50 hz coil voltage 415 volt complete all as specified and directed.
Supply only in replacement of 3 pole power contactor Type MNX 32, 110 Amp ,415/220 volts ,50 hz coil voltage 415 volt complete all as specified and directed.
Supply only in replacement of thermal over load relay type MN relay range 28-42 Amps complete all as specified and directed.
Supply only in replacement of thermal over load relay type MN relay range 20-32 Amps complete all as specified and directed.
Supply only in replacement of thermal over load relay type MN relay range 13-21 Amps complete all as specified and directed.
Supply and fixing in replacement LED batten arrow for multi application suitable for 18 watts with & including necessary cable connection complete all as specified and directed. (Note:- Old U/s material batten obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV of PVC scrap in weight (KG) shall be taken into account and attach with RAR/F Bill.)
M&L Earthing complete with galvanised steel earth plate electrode 600 x 600 6 mm thick burried directly in ground not less than 2.25 mtr deep below normal ground level with top edge of earth plate not less than 1.5 mtr below normal ground level connected to the Galvanised iron strip 32 x 6 mm size by means of bolts, nuts, check nuts and washers of galvanised iron and 32 x 6 mm GI strip procted by provision of GI light grade pipe 40 mm bore including provision of concrete pit in PCC 1: 2: 4 type B-1, using 20 mm graded stone aggregates with 40 mm thick cover of RCC (1:2:4) reinforced with XPM weight not less than 4 kg/sqm and 6 mm dia bar handle, excavation and earth work in any type of soil, charcoal dust and salt light grade GI watering pipe 20 mm bore with funnel and wire mashe and medium GI protection pipe 15 mm bore 5 Mtr long and GI strip upto main earthing of pole complete all as shown in electrical plate No 3 of MES Sch 2009 Part-I including dismentling of existing pit complete all as specified and as directed. Note:- (i)Main Earthing strip from earth plate electrode to test point upto length of 7.t meters shall deemed to be included in the unit rate quoted against this items. (ii) On testing after completion of the earthing work if the desired resistenance is not obtained, the contractor shall redo the the complete earth work without any extra cost to the department. (iii) Old u/s material such as GI pipe, strip etc shall be taken on charge as iron scrap.
Material and labour in replacement for point wiring complete with 1.5 sqmm (nominal crossectional area) FRLS PVC insulated unsheathed and stranded copper conductor cable ISI marked and including PVC concealed conduit ISI marked of size 20 mm dia medium grade and PVC conduit fittings such as tees, bends, elbows, reducers except conduit junction box (Junction box will be of MS) including FRLS PVC insulated unsheathed 1.5 sqmm copper earth wire, connecting to common earth dolly and including metal flush box of suitable size for fixing switches/sockets/fan regulators etc including taking down of existing point wiring alongwith switch & sockets etc complete all as directed for the following:- (Note:- Old point wiring & fittings shall be taken on charge in copper scrap & iron scrap in 'KG'.
(a) One light point/fan point/exhaust fan point/circulator fan point/bell/buzzer controlled by one 1 way switch/bell push etc.
(b) One socket outlet point 5 Amps on the same board
(c) One socket outlet point 5 Amps on the independent board
(d) Power point with 3 pin socket outlet 15 Amp, independent with 4 sqmm copper FRLS wire complete all as specified and directed.
Supply only in replacement of switch piano, flush type single pole 1 way, 5/6 Apms complete all as specified and directed.
Supply only in replacement of swithc Piano flush type single pole 1 way 15 Amps complete all as specified and directed.
Supply only in replacment of socket outlet 6 Amp 2 in 1,3 pin complete all as specified and directed.
Supply only in replacment of socket outlet 16 Amp 2 in 1, complete all as specified and directed.
Supply only in replacement of Fan regulator step type complete all as specified and directed.
Supply only in replacement of Ceiling rose, surface bakelite, 3 terminal, 240 volts, 5 Apms complete all as specified and directed.
S & F in replacement for fixing MCCB's of following sizes in existing/new location complete all as specified and directed. (Note:- Old U/s material MCCB obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV of iron scrap in weight (KG) shall be taken into account and attach with RAR/F Bill.)
MCCB 63 Amps 3 Pole 16 KA
MCCB 100 Amps 3 Pole 16 KA
MCCB 125 Amps 3 Pole 16 KA
MCCB 160 Amps 4 Pole 36 KA
MCCB 200 Amps 4 Pole 36 KA
MCCB 250 Amps 4 Pole 36 KA
Supplying, laying, jointing, welding and testing MS Pipe (Heavy class 'C') IS : 1239/3589, of followiing sizes 8mm thick laid in trenches or in Horizontal/Vertical/inclined position or laying on floors for connections for suction, to header and connected to out going water main CI/DI pipe line, for following size including taking out the old unserviceable pipes :- (Note:- (i) MS Flanges incl fabrication work will be measured and paid separately. (ii) Excavation and earth work will be measured and paid separately. (iii) Old U/s material obtained from demolition shall be taken on charge in demolition/salvage register and enter page number in demolition statement. Necessary RV in weight (KG) shall be taken into account and attach with RAR/F Bill.)
80 mm dia
100 mm dia
150 mm dia
M&L distempering walls with oil bound distemper dry including washing rubbing down, filling of cracks with Birla care putty, including necessary scaffolding work etc. complete all as specified and directed
M&L apply two coat of cement base paint after prepation of surface of walls/sump including Writing letter on Wall/Sump and necessary scaffolding work etc. complete all as specified and directed
M & L for preparation of old surfaces of LT steel tubular poles of any size and type with bracket clamps etc and painting with two coats of Aluminium paint upto 6 mtr long and exposed surface of Pole yellow and black paint in strips alternative 30 cm wide ipto 1.5 mtr from ground level including marking of pole No's with paint complete all as specified and as directed.
M&L for re-painting of LT Panels/feeder pillars with 2 coats of super enamal paint over a coat of red-oxide with sparygun including writing on feeder pillar in appropriate size of letters as directed.
Supply & installation in replacement of steel tubular swaged poles type 410 SP-31 (9 mtr long) of approx wt.147 kg conforming to IS 2713 (Part-II) with top cap including excavation, earth work, PCC foundation, base plate,PCC coping,GI pipe for cable protection etc. and GI bracket for fitting mounting, complete all as per manufacturer's instructions and as specified and as directed by E-in-charge. Note:- (i) The unit rate in this item is deemed to be included the cost of exacavation and earth work in any type of soil,PCC foundation 1:4:8 type D-2 , PCC coping 1:2:4 type B-1 as in steel tubular pole and GI bracket made of GI pipe medium grade 40 mm bore, 1.5 mtr long for fixing of street light fitings . The steel pole shall be painted by bituminious paint total length inside and up to planting depth outside and remaining portion of pole painted with two coat of aluminium paint over a coat of red oxide primer complete all as specified and directed. (ii) Old U/s PCC steel pole shall be taken on charge as iron scrap in 'KG' in demolition ledger.)
M&L Re-development of existing bore well, if any capacity size, not more than 160mtrs deep, at the pressure not less than 6 Kgs/Sqcm by disel engine driven air compressor of capacity 630 CFM with & including air pipe and connected items to achieve the minimum yield of 3 litres per second of tube well including transport complete all as specified and as directed. (Note:- Compressor machine including deisel driver & transportation charges shall be paid by contractor and unit rate quoted shall be deemed included this aspect.)
HSEDRIG ENGINEERS AND CONTRACTORS (BID ID -3280477)
CHOUDHARY ELECTRICAL (BID ID -3283274)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .