| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | ₹3.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.3 L+₹11,277.79 (3.57%)Admitted-Finance | ₹3.3 L+₹11,277.79 (3.57%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 L+₹39,558.23 (12.5%)Admitted-Finance | ₹3.6 L+₹39,558.23 (12.5%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | C MALARKODI L2 | R.S.MURUGESAN L1 | SRI R S ASSOCIATES L3 |
|---|---|---|---|---|---|---|
| 1.001) Construction of Protection Wall Near Open Well @ Thalakarai H/O P.K.Hills Keelnadu | ||||||
| 2.00 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B. | 16.43 | cum | 550 ₹9,036.5 | 345.5 ₹5,676.57 Lowest | 385 ₹6,325.55 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications | 2.74 | cum | 8,000 ₹21,920 | 6,255.55 ₹17,140.21 Lowest | 7,165.25 ₹19,632.79 |
| 4.00 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon | 76.88 | Sqm | 850 ₹65,348 | 650.75 ₹50,029.66 Lowest | 747.55 ₹57,471.64 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 27.08 | cum | 6,444 ₹1,74,503.52 Lowest | 7,135.55 ₹1,93,230.69 | 7,970.25 ₹2,15,834.37 |
| 6.00 | Provision forsWeepage Pipe 90mm Pipe | 11.25 | RM | 300 ₹3,375 | 135 ₹1,518.75 Lowest | 152.5 ₹1,715.63 |
| 7.00 | Refilling in Foundation and Basement with excavated earth in layer of not more than15mm thick. | 11.21 | cum | 300 ₹3,363 | 35 ₹392.35 Lowest | 47.5 ₹532.48 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 49,958 ₹49,958 | 48,238 ₹48,238 Lowest | 54,272 ₹54,272 |
Tender Value
₹3.5 L
EMD Value
₹3,550
Closing Date
6 Aug 2026, 3:00 pmClosed
BDO(VP)
BDO Office, P.N.Palayam
Construction of Protection Wall Near Open Well at Thalakarai H/O P.K.Hills Keelnadu Panchayat P.N.Palayam Block In Salem District Panchayat General Fund - 2026-27
2026_RDTN_687837_6
Roc.No.158/2026/T2
Open Tender
Civil Works
Item Wise
45 days
BDO Office, P.N.Palayam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,550
2 Sept 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1) Construction of Protection Wall Near Open Well @ Thalakarai H/O P.K.Hills Keelnadu | - | - | - | - |
| 2 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B. | 1 | cum | - | - |
| 3 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications | - | cum | - | - |
| 4 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon | 1 | Sqm | - | - |
| 5 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 1 | cum | - | - |
| 6 | Provision forsWeepage Pipe 90mm Pipe | - | RM | - | - |
| 7 | Refilling in Foundation and Basement with excavated earth in layer of not more than15mm thick. | 11.21 | cum | - | - |
| 8 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount (in Rupees) | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
06.pdf
Tender Documents • 1.27 MB
BOQ_826922.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .