| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | +0.00% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 LAdmitted-Finance AMBARI PO KAMALA BAGAN DIST DARJEELING WEST BENGAL 734 426 | DARJEELING | WEST BENGAL | 734426 | +2.30% | ₹1.6 L | L2 | Admitted-Finance |
| 3 | L3₹1.7 LAdmitted-Finance | +4.99% | ₹1.7 L | L3 | Admitted-Finance |
Tender Value
₹1.6 L
EMD Value
₹3,300
Closing Date
14 Mar 2026, 5:00 pmClosed
Executive Engineer (civil HQ)
The Executive Engineer (C ) HQ at 48, Market Street, Kolkata - 87
ARRANGEMENT OF FILTER WATER SUPPLY AT SEMI UNDER GROUND RESERVOIR (S.U.G.R) AT KALIGHAT TEMPLE COMPLEX WITH OTHER ANCILLARY WORKS.
2026_KMC_1019343_1
KMC/DG(C)/EEC/HQ/25-26
Open Tender
CIVIL WORKS
15 days
KMC AREA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹3,300
11 May 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
14 Mar 2026
7 Mar 2026
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(I) Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) (a) For Exposed Work PVC Pipes (Dia) (e)40 mm
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS Supply of Chlorinated Polyvinyl Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007Q) Ball Valve (e) 40mm
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.29Hire charges for engaging Air Compressor machine with minimum pressure capacity of 5.0 Kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, Tools and plants all complete for cutting Road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of EIC . a) With Pneumatic hammers For minimum engagement of 8 hrs. In a day
ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018)
BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 34. Supplying,fitting & fixing granite slab 15mm to 18mm thick in floor, lobby, stair, landing and treads etc. over 20mm (avg) thick base of cement morter (1:2) laid with white cement slurry @ 4.40Kg per Square meter before placing of granite and jointed with white cement slurry @ 2.0 Kg per square meter with necessary pigments and complete as per direction of Engineer-in-charge including cost of all materials, labours, curing and roughening of concrete surface complete. In ground floor (b) Area of each Granite slab 0.6 to 1.0 Square meter. Add extra for each addl, floor over the rate for item A(33, 34) I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs. 16/- per Sq.m
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 13)Santras. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
form_1-13.pdf
Tender Documents • 1.03 MB
C1.pdf
Additional Documents • 4.88 MB
BOQ_2504935.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid