Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹8.7 L
EMD Value
₹18,000
Closing Date
15 Sept 2022, 4:00 pmClosed
SE OMC IV CTPS PTPP PARICHHA
OFFICE OF SE OMC IV CTPS PTPP PARICHHA
Routine and breakdown maintenance of ESP electrical system including ESP LT switchgears and BAPCON RAPCON Controllers along with Ash Level Indicator System all ESP LT motors upkeeping of ESP switchgear rooms of CTPS PTPP Parichha
2022_RVUNL_723311_1
PAR/C/OMC4/EMD2/6000000525_00
Open Tender
Electrical Works
Fixed-rate
365 days
PARICHHA
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Dy CAO CFA AND BO PTPP Parichha
₹18,000
21 Oct 2022
25 Aug 2022
16 Sept 2022
25 Aug 2022
15 Sept 2022
25 Aug 2022
Amount
Regular Technical Assistance for BAPCON & RAPCON Controllers along with Routine, Preventive Maintenance work of Ash Level Indicator System and all rapping motors in ESP electrical system of Unit#5&6 of 2X250 MW, PTPP Parichha as per scope of work. (Completion Period- One Job per Month).
Electrical Routine/Preventive maintenance work and upkeep of ESP switchgear rooms, various electrical control panels of ESP, BAPCON/RAPCON electronic controllers, HVR transformers and other auxiliaries of ESP electrical system alongwith cleaning work of cable galleries below ESP Control Rooms of 2x250 MW Unit#5&6, PTPP, Parichha(Jhansi).
Breakdown Maintenance Work: Dismantling, Repairing and Testing of M/s BHEL Make “BAPCON PLUS” electronic controllers as per scope of work. (Completion Period- 20 days per Job).
Breakdown Maintenance Work: Dismantling, Checking, Repairing/ Replacement of defective component, Assembling and Testing of HVR Transformers as per scope of work. (Completion Period- 05 days per Job).
Breakdown Maintenance Work: The work of removing and installing the sensing probe from the wall of Ash hopper as per scope of work. (Completion Period- 04 days per Job).
Breakdown Maintenance Work: Overhauling of 0.26 KW Rapping motor as per scope of work. (Completion Period- 02 Days per Job).
Shifting of repaired/damaged/new ESP transformer from place of storage near electrical workshop area to ESP ground floor or from ESP ground floor to electrical workshop.
Lifting the transformer from ESP ground floor up to the ESP top floor and placing it at the required place platform (or Lowering down transformer from ESP top floor to ground floor)
Preventive maintenance upkeeping and cleaning of ESP transformer, support insulators, isolator insulators, negative bushing and their chambers (1 transformer 4 nos. support insulator, 3 nos. isolator insulator, 2 nos. negative bushing and respective chambers of 1 ESP field = one job)
Upkeeping and cleaning of ESP top floor area.
Attending oil leakage of HVR transformer
Manpower assistance in night hours for ESP electrical maintenance
M/S ELECTRICAL AND INSTRUMENTATION ENGINEERS
M/S MRP CONSTRUCTIONS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .