Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.0 CrAdmitted-Finance | ₹79.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹88.7 CrAdmitted-Finance | ₹88.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹94.3 CrAdmitted-Finance | ₹94.3 Cr | L3 | Admitted-Finance |
| 4 | L3₹94.3 CrAdmitted-Finance | ₹94.3 Cr | L3 | Admitted-Finance |
| 5 | L4₹110.9 CrAdmitted-Finance | ₹110.9 Cr | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RATNA INFRASTRUCTURE PROJECTS PVT LTD L3 | C Gopal Reddy and Co L1 | M/s DURGA CONSTRUCTION COMPANY L5 | A G CONSTRUCTION L4 | M/s Kampung Kamyer Trading Co. L2 | OVERSEAS INFRASTRUCTURE ALLIANCE (INDIA) PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km. 59+000 to Km. 72+450] (Design Length – 13.450 Km)(Package V) in the state of Nagaland under SARDP-NE Phase A on EPC Mode | 1 | Lumpsum | 94,28,20,000 ₹94.3 Cr | 79,00,00,001 ₹79.0 Cr | 1,23,11,00,000 ₹123.1 Cr | 1,10,90,88,890 ₹110.9 Cr | 88,73,60,000 ₹88.7 Cr | 94,28,20,000 ₹94.3 Cr |
Tender Value
₹110.9 Cr
Closing Date
1 Jul 2021, 11:00 amClosed
A K Jha
National Highways and Infrastructure Development Corporation Ltd. Third Floor, PTI Building, 4 Sansad Marg. New Delhi
Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) from existing Km 59.000 to Km 73.640 (Package V) in the state of Nagaland - 2nd Call.
2021_NHIDC_631948_1
NHIDCL/Civil Work/ Nagaland/MTM Pkg 5/2020
Open Tender
Civil Works
547 days
Nagaland
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,600
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
15 Jul 2021
1 Jun 2021
2 Jul 2021
1 Jun 2021
1 Jul 2021
24 Jun 2021
1 Jun 2021 - 15 Jun 2021
17 Jun 2021
Amount
Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km. 59+000 to Km. 72+450] (Design Length – 13.450 Km)(Package V) in the state of Nagaland under SARDP-NE Phase A on EPC Mode
M/s Kampung Kamyer Trading Co.
RATNA INFRASTRUCTURE PROJECTS PVT LTD
OVERSEAS INFRASTRUCTURE ALLIANCE (INDIA) PRIVATE LIMITED
A G CONSTRUCTION
M/s DURGA CONSTRUCTION COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Schedule.pdf
Tender Documents • 5.55 MB
Drawing.pdf
Tender Documents • 37.15 MB
BOQ_665043.xls
BOQ • 0.23 MB
RFP.pdf
Tender Documents • 2.55 MB
DCA.pdf
Tender Documents • 2.56 MB
Download all tender documents and submit your bid