Tender Value
₹43 L
EMD Value
₹86,000
Closing Date
5 Jan 2022, 4:00 pmClosed
Executive Engineer I and F C Division Leh
Executive Engineer I and F C Division Leh
Improvement of Head Work of Irrigation Khuls of Shenam and Skara (Check Dam at various spots) (Under Distt. Plan)
2021_PWD_2872_12
12 of I and F C of 2021-22
Open Tender
Civil Works - Others
Item Rate
30 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Executive Engineer I and F C Division Leh
₹86,000
20 Jan 2022
4 Dec 2021
7 Jan 2022
4 Dec 2021
5 Jan 2022
4 Dec 2021
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
Dumping stone Including cost of stones. in Horizontal on level.
Constructing vertical bunds with sloping faces, by boulder filling (dry,hand packed tightly); including cost of stones and wire crates.
Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: a) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including cost and carriage of cement.
b) 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including propping etc strutting and removal of form work for.Retatning walls. return walls. walls (any thickness) including attached pilasters. buttresses. plinth and string courses fillets etc.
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Riveted and bolted
Carriage of material from source to site of work by Mechanical Transport including Loading ,Unloadng and Stacking . a) Sand and stone agg an avg lead 15Km.
b) Soling stone an avg lead 25KM
c) Structural Steel an avg lead 3KM.
Carriage of material by head load including Loading , Unloadng and Stacking. A) Cement an avg. lead 200 mtr.
B) Sand and Stone agg. Avg lead 200 mtr.
C) Soling stone an avg. lead 200 mtr.
M/S THINLES ODZER
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .