| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.9 CrAccepted-AOC NAGPUR | SINDHUDURG | MAHARASHTRA | 416510 | 1 | Accepted-AOC aoc | |
| 2 | 2₹11.2 Cr+₹23.9 L (2.19%)Rejected-Finance 102 SAIPREM COMPLEX JUNA AUSA ROAD LATUR 413 512 | LATUR | LATUR | MAHARASHTRA | 413512 | 2 | Rejected-Finance reject | |
| 3 | 3₹11.3 Cr+₹39.7 L (3.63%)Rejected-Finance 413 512 | LATUR | MAHARASHTRA | 413512 | 3 | Rejected-Finance reject | |
| 4 | Rejected-Technical MANORA 85 KESHAV NAGAR KHAT ROAD BHANDARA | BHANDARA | BHANDARA | MAHARASHTRA | 441904 | - | Rejected-Technical Technically disqualified | |
| 5 | Rejected-Technical NA | NA | NA | 121004 | - | Rejected-Technical Technically disqualified |
Tender Value
₹10.5 Cr
EMD Value
₹5.2 L
Closing Date
14 Sept 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Director Deparnment of Archaeology Nagpu
Assistant Director Deparnment of Archaeology Oppo Govt Press Civil Line Nagpur
Conservation and Repair to Manikgad Fort( Phase- I), At. Manikgad Tal. Jivati, Dist. Chandrapur
2023_TCADM_940244_1
etender/Notice 14/2023-24
Open Tender
Civil Works - Others
Percentage
731 days
MANIKGAD
Please refer Tender Documents
3 documents required · 3 mandatory
₹3,540
₹5.2 L
Assistant Director Deparnment of Archaeology Nagpu
8 Dec 2023
31 Aug 2023
15 Sept 2023
31 Aug 2023
14 Sept 2023
31 Aug 2023
8 Sept 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 metres out side the periphery of the area. | 1,76,150 | Sqm. | 4 | ₹7,04,600 |
| - | Cutting down trees including trunks and branches with girths above 30cm to 60cm and stacking the materials neatly with all lifts and lead of 1000m as directed and earth filling in the depression / pit if any. | 10 | No. | 511 | ₹5,110 |
| - | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 255 | Cum. | 207 | ₹52,785 |
| - | Providing Soil Bag Support to the monument with contractor´s soil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags, removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the site etc. complete.a) Providing Soil Bags for lowering the members | 2,404.42 | Cum. | 2,752 | ₹66,16,963.84 |
| - | Providing Soil Bag Support to the monument with contractor´s soil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags, removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the site etc. complete.a) Providing Soil Bags for lowering the members b) Providing Soil Bags for Reconstructing the members | 2,404.42 | Cum. | 1,274 | ₹30,63,231.08 |
| - | Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete. | 3,040.81 | Cum. | 2,398 | ₹72,91,862.38 |
| - | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5m.) By Mechanical Means | 1,050.99 | Cum. | 252 | ₹2,64,849.48 |
| - | Providing soiling using 80 mm size trap metal in 15cm. Layer including filling voids with sand/ grit ramming, watering complete. | 304.97 | Cum. | 4,056 | ₹12,36,958.32 |
| - | Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete. | 137.49 | Cum. | 10,284 | ₹14,13,947.16 |
| - | Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in foundation and plinth as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, bailing out water, watering and all exposed masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. | 2,906.16 | Cum. | 11,181 | ₹3,24,93,774.96 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1639190.xls
BOQ Document • 0.31 MB
128332808.pdf
Tender Document • 0.94 MB
doc.pdf
Tender Document • 3.91 MB
128332812.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .