Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-AOC BHAGWATI NAGAR JAMMU | 1 | Accepted-AOC L1 | |
| 2 | 2₹1.5 L+₹12,900 (9.18%)Rejected-AOC BHAGWATI NAGAR JAMMU | 2 | Rejected-AOC L2 | |
| 3 | 3₹1.6 L+₹21,000 (14.9%)Rejected-AOC BYPASS NH NEAR SBI SIDHRA JAMMU | 3 | Rejected-AOC L3 |
Tender Value
₹1.8 L
Closing Date
7 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/NowshERA
Office of the Executive Engineer MID Akhnoor/NowshERA
Repairs to 180 HP three phase induction motor with other allied works at LIS Jogwan.
2021_IFC_150855_1
120/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
8 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER AKHNOOR/NOWSHERA
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
27 Dec 2021
30 Nov 2021
8 Dec 2021
30 Nov 2021
7 Dec 2021
1 Dec 2021
3 Dec 2021
180 days
Repair to 8 cusec discharge 43mtr HC pump unit no. 02 installed at LIS Jogwan . The job involves decoupling of the pump from motor by unfastening the coupling nuts and bolts , removing the top cover, extraction of shaft and impeller assembly together with bearing brackets. by using skilled technicians and shifting the same to workshop by using manual labour and mechanical transport . Dismantling of the impeller shaft assembly and separating shaft, impeller and bushes.P/F of 2-Nos. bushes as per sample. Providing/fabrication of neck rings ( 2 nos.). Fabrication of glands as per sample. Re-assembling of impeller shaft assembly & shifting back to L.I.S. Greasing of all the parts. Fitment of impeller shaft assembly in the pump at proper position & closing the top cover by p/f of new nuts, bolts, washers and packing. Job also includes providing / fitting of gland packing , greasing work etc. Thereafter coupling with motor, alignment setting, testing of pump on load. Complete job includes the cost of material, labour charges, to and fro carriage charges, hire charges of tools and tackles etc. Complete Job
IRepairs to 180 HP three phase induction motor of pumping unit no. 02 at LIS Jogwan. The job involves disconnecting the power supply, unfastening the foundation nuts, bolts and decoupling the motor from the HC pump .Loading of motor in the vehicle by using manual labour and Shifting to workshop through mechanical transport. Dismantling of end covers, Extraction of bearings & rotor from motor. Extraction of damaged winding from the stator. Cleaning of stator with compressed air and requisite chemical cleanser/CCL4. Providing and fitting of new good quality winding wire of gauge and size (as per old sample) in the stator together with replacement of damaged /worn out wedges/strips and p/f of f-class insulation, Application of superior quality varnish (Red Becktol etc.) by spray impregnation process and drying the stator winding with hot air circulation process and thereafter checking the IR value. Providing/fitting of 6319 C3 bearing .Re-assembling the motor after greasing. Carriage / transportation of the motor back from workshop to the site of installation at the LIS. Installation / leveling of the motor over the base frame by providing / fitting nut bolts, washers etc., making of electrical connections, replacing worn out nuts, bolts for the electrical connection. Alignment & coupling with pump. Complete testing & commissioning of the pumping unit. Job includes cost of all material, transportation charges, head load and labour charges for skilled / semi skilled labour, hire charges for tools & tackles at the LIS. Complete Job
Repairs to 300 mm foot valve assembly of pumping unit no 2 installed at LIS Jogwan.. The job involves disconnecting / dismantling of the foot valve assembly from the suction pipe by deploying manual labour and allied tools & tackles. Shifting / transporting to the workshop. Cleaning by washing with water to make the foot valves completely silt free. After drying them completely, carrying out necessary repair works on the valve surfaces and flanged joints by welding using good quality electrodes. Dismantling of damaged foot valve mechanism with flap & rings . Fabrication of new flap plate as per the sample. Providing / fitting of new leather washer cut as per size of the flap plate. Reassembling the foot valve and transporting back to the installation site at LIS. Fitting the valves to the respective suction line with replacement of damaged rubber gaskets of flanged joints and worn-out nuts, bolts etc. Complete job including cost of material, labour charges, transportation charges and hire charges for tools & tackles. Complete Job
PERFECT ELECTRICAL WORKS
G S ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .