| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 CrAccepted-AOC | ₹1.5 Cr Quoted ₹1.3 Cr | 1 | Accepted-AOC L1 BIDDER |
| 2 | 2₹1.4 Cr+₹8.5 L (6.59%)Rejected-Finance 184 NEAR GOODWAY TAILORS PRITHVIPURA RASAL ROAD BRIDGE JODHPUR RAJASTHAN 342006 | JODHPUR | RAJASTHAN | 342006 | ₹1.4 Cr+₹8.5 L (6.59%) | 2 | Rejected-Finance As per price bid evaluation, bidder is L2. |
| 3 | Rejected-Technical OPPOSITE SWAHID BHAWAN VILL MIRZA P O MIRZA DIST KAMRUP 781125 | MIRZA | KAMRUP | ASSAM | 781125 | - | - | Rejected-Technical Bid has been found to be non-responsive. |
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
18 Sept 2023, 12:00 pmClosed
CGM (PPnD), AEGCL
O/o the MD, AEGCL, Bijulee Bhawan, Paltanbazar, Guwahati-781001
Turnkey Construction of a 132kV Railway Traction Bay at 132kV Haflong GSS, AEGCL including Supply of Bay Equipment and Materials and Associated Works
2023_AEGCL_31719_1
MD/Tech-795/RITES/Haflong
Open Tender
Electrical Works
Turn-key
270 days
132 KV HAFLONG GSS, AEGCL
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹2.7 L
Yes
21 Nov 2023
19 Jul 2023
20 Sept 2023
19 Jul 2023
18 Sept 2023
19 Jul 2023
Amount
Circuit Breakers with mounting structures and terminal connectors etc.as applicable as per specification
132 kV Gang operated outdoor SF6 Breakers
SIEMENS make Control & Relay Panel with Automation (Simplex Type) complete with BCU, ethernet switch and all accessories as required for integration with existing SAS (Siemens make).
For 132 kV Feeder Capable of integration into Existing SAS (SIEMENS) at Haflong GSS
Current Transformers (1-phase) with terminal connectors etc. as per specification
132 kV, 400-200/1-1-1 Line CT
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV horizontal centre break isolator With Single Earth Switch (3-phase)
132 kV horizontal centre break isolator Without Earth Switch (3-Phase)
Lightning Arrester with terminal connectors etc. as per specification
132 kV Lightning Arrester
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
132 kV CVT with terminal connectors etc as per specfication.
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV, 400-200/1-1-1 Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Supply and Design of Bay Steel Structures except equipment mounting structures
Column
Column Type 'C1' ( 2 Nos.) [ 2317.41 Kg/ per Column ]
Beams
Beam Type 'B1' ( 2 Nos) [ 751.77 Kg/ per Beam ]
Supply of Power Cables
Supply of Control Cables
Supply of ACSR Panther Conductor
Disc Insulator Strings complete with all hardware fittings, clamps etc.
10 Disc Tension Insulator String
9 Disc Suspension Insulator String
Supply of Earthing System Materials
Main Earh mat (65 x12 mmGI Flat)
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
Supply of AC supply Bay Marshalling Kiosk along with mounting structure
Clamps and Connectors
PG clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
T Clamp witrh connectors and all hardware fittings suitable for ACSR Conductors
Tee connector rigid through type along with all hardware fitting for 132 kV LA and suitable for ACSR Panther Conductor
Tee connector rigid through type along with all hardware fitting for 132 kV CVT and suitable for ACSR Panther Conductor
Supply of ABT meter with cubicle as per specification (SAMAST Compliance)
Mandatory Spares
For 132 kV SF6 Circuit Breakers
Interrupter
Tripping Coil
Closing Coil
For Control & Relay panels
Over current/Earth fault relay
Differential protection Relay, line length 6KM (approx.)
Master Trip Relay
132kV Lightning Arrester
132KV, 400-200/1-1-1 single phase Line CT (3 Core)
132KV, Isolator Moving and Fixed Contact
Terminal connectors for 132KV CT
Terminal connectors for 132KV Isolator
T Clamp suitable for twin ACSR Zebra to Single ACSR Panther Conductor
Description of Work / Item(s)
Amount
Circuit Breakers with mounting structures and terminal connectors etc.as applicable as per specification
132 kV Gang operated outdoor SF6 Breakers
SIEMENS make Control & Relay Panel with Automation (Simplex Type) complete with BCU, ethernet switch and all accessories as required for integration with existing SAS (Siemens make).
For 132 kV Feeder Capable of integration into Existing SAS (SIEMENS) at Haflong GSS
Current Transformers (1-phase) with terminal connectors etc. as per specification
132 kV, 400-200/1-1-1 Line CT
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV horizontal centre break isolator With Single Earth Switch (3-phase)
132 kV horizontal centre break isolator Without Earth Switch (3-Phase)
Lightning Arrester with terminal connectors etc. as per specification
132 kV Lightning Arrester
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
132 kV CVT with terminal connectors etc as per specfication.
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV, 400-200/1-1-1 Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Supply and Design of Bay Steel Structures except equipment mounting structures
Column
Column Type 'C1' ( 2 Nos.) [ 2317.41 Kg/ per Column ]
Beams
Beam Type 'B1' ( 2 Nos) [ 751.77 Kg/ per Beam ]
Supply of Power Cables
Supply of Control Cables
Supply of ACSR Panther Conductor
Disc Insulator Strings complete with all hardware fittings, clamps etc.
10 Disc Tension Insulator String
9 Disc Suspension Insulator String
Supply of Earthing System Materials
Main Earh mat (65 x12 mmGI Flat)
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
Supply of AC supply Bay Marshalling Kiosk along with mounting structure
Clamps and Connectors
PG clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
T Clamp witrh connectors and all hardware fittings suitable for ACSR Conductors
Tee connector rigid through type along with all hardware fitting for 132 kV LA and suitable for ACSR Panther Conductor
Tee connector rigid through type along with all hardware fitting for 132 kV CVT and suitable for ACSR Panther Conductor
Supply of ABT meter with cubicle as per specification (SAMAST Complaince)
Mandatory Spares
For 132 kV SF6 Circuit Breakers
Interrupter
Tripping Coil
Closing Coil
For Control & Relay panels
Over current/Earth fault relay
Differential protection Relay, line length 6KM (approx.)
Master Trip Relay
132kV Lightning Arrester
132KV, 400-200/1-1-1 single phase Line CT (3 Core)
132KV, Isolator Moving and Fixed Contact
Terminal connectors for 132KV CT
Terminal connectors for 132KV Isolator
T Clamp suitable for twin ACSR Zebra to Single ACSR Panther Conductor
Description of Work / Item(s)
Amount
Erection, testing & commissioning of Circuit Breakers including laying & terminating of LT power and control cables as required
132 kV Gang operated SF6 Breakers
Erection, testing & commissioning of Control & Relay Panels including laying & terminating of LT power and control cables as required
For 132 kV Feeder compatible with existing SAS (SIEMENS) at HAFLONG GSS
Erection, testing & commissioning of Current transformers including laying & terminating of LT power and control cables as required
132 kV, 400-200/1-1-1 Line CT
Erection, testing & commissioning of Isolators including laying & terminating of LT power and control cables as required
132 kV With Single Earth Switch
132 kV Without Earth Switch
Erection, testing & commissioning of Lightning Arrester including laying & terminating of power and control cables as required
132 kV Lightning Arrester
Erection, testing & commissioning of Post Insulator including including laying & terminating of power and control cables as required
132 kV Post Insulator
Erection, testing & commissioning of CVT including including laying & terminating of power and control cables as required
132kV CVT
Erection of Mounting structures for different terminal equipments as required for
132 kV, 400-200/1-1-1 Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Erection of Switchyard Lattice Steel Columns
Column Type 'C1' ( 2 Nos.) [ 2317.41 Kg/ per Column ]
Erection of Switchyard Lattice Steel Beams
Beam Type 'B1' ( 2 Nos) [ 751.77 Kg/ per Beam ]
Integration of Control Relay Panel into the existing Substation Automation System (SAS) of SIEMENS make at 132kV Haflong GSS.
Hoisting of Insulator strings, Stringing of Conductors, GI shield wire etc including supply of disc insulator strings, clamps, GI stranded shield wire, connectors etc. As required for whole scope of works
Installation of earthing system with GI flats, electrodes etc. For present scope of area
Illumination
Design and installation of outdoor illumination system for the 132kV bay area (consisting of minimum 6 Nos. of LED lamps with fittings etc.) as per specification Clause 2.14.0, Vol.- 2 including supply of all materials.
Erection of Bay Marshalling Kiosk as per drawings and specifications including construction of foundation inclusive of supply of all foundation Materials and Labour as directed.
Erection, testing and Commissssioning of ABT Meter as per specification
Description of Work / Item(s)
Amount
Construction of Foundation Including Supply of All Foundation Materials & Labour as required for 132kV Circuit Breaker (1 Set)
Excavation (16.21 Cum per breaker)
Filling (10.73 Cum per breaker)
Brick Soiling (8 Sq.m per breaker)
Formwork (15.36 Sq.m per breaker)
PCC (0.46 Cum per breaker)
RCC (4.22 Cum per breaker)
Reinforcement (209.75 Kg per breaker)
Construction of Foundation Including Supply of All Foundation Materials & Labour as required for 132kV Current Transformer ( 3 Nos.)
Excavation (4.29 Cum per CT)
Filling (3.48 Cum per CT)
Brick Soiling (1.82 Sq.m per CT)
Formwork (6.56 Sq.m per CT)
PCC (0.10 Cum per CT)
RCC (0.52 Cum per CT)
Reinforcement (86.18 Kg per CT)
Construction of Foundation Including Supply of All Foundation Materials & Labour as required for 132kV CVT (3 Nos.)
Excavation (4.29 Cum per CVT)
Filling (3.48 Cum per CVT)
Brick Soiling (1.82 Sq.m per CVT)
Formwork (6.56 Sq.m per CVT)
PCC (0.10 Cum per CVT)
RCC (0.52 Cum per CVT)
Reinforcement (86.18 Kg per CVT)
Construction of Foundation Including Supply of All Foundation Materials & Labour as required for 132kV Isolators With/ Without Earth Switch ( 2 Sets)
Excavation (25.13 Cum per Isolator)
Filling (20.40 Cum per Isolator)
Brick Soiling (11.81 Sq.m per Isolator)
Formwork (16.11 Sq.m per Isolator)
PCC (0.72 Cum per Isolator)
RCC (2.83 Cum per Isolator)
Reinforcement (246.07 Kg per Isolator)
Construction of Foundation Including Supply of All Foundation Materials & Labour as required for 132kV Lightning Arresters( 3 Nos)
Excavation (3.52 Cum per LA)
Filling (2.75 Cum per LA)
Brick Soiling (1.56 Sq.m per LA)
Formwork (3.88 Sq.m per LA)
PCC (0.08 Cum per LA)
RCC (0.54 Cum per LA)
Reinforcement (46.65 Kg per LA)
Construction of Foundation Including Supply of All Foundation Materials & Labour as required for 132kV Post Insulator ( 3 Nos)
Excavation (3.52 Cum per PI)
Filling (2.75 Cum per PI)
Brick Soiling (1.56 Sq.m per PI)
Formwork (3.88 Sq.m per PI)
PCC (0.08 Cum per PI)
RCC (0.54 Cum per PI)
Reinforcement (46.65 Kg per PI)
Construction of Foundation Including Supply of All Foundation Materials & Labour as required for Lattice Steel Column ( Column Type (C1), 2Nos.)
Excavation (110.55 Cum per Column)
Filling (97.229 Cum per Column)
Brick Soiling (25.5 Sq.m per Column)
Formwork (23.96 Sq.m per Column)
PCC ( 1.79Cum per Column)
RCC (8.59.Cum per Column)
Reinforcement (855.89 Kg per Column)
Providing 80mm thick 1:4:8 PCC base of switchyard as per specification & drawings including supply of all materials.
Providing 100mm thick graveling of switchyard as per specification & drawings including supply of all materials.
Construction of Cable Trenches including supply of all materials and labour as per specification and drawing
D Type Trench
B Type Trench
Description of Work / Item(s)
Amount
Earthwork in Excavation for foundation trenches of walls, retaining walls, footing of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified (i) In hard rock, (ii) Without using blasting materials (where blasting is not possible/not permissible). 1 x 12.00 x 9.00 x 0.60 = 64.80
Providing drain with cement concrete (1:3:6) 10 cm thick sides, 10 cm thick bed over brick flat soiling including 15 mm thick cement plastering in prop. 1:3 finished with a floating coat of cement slurry as directed with necessary shuttering for sides and earth work in excavation of foundation trenches and refilling the sides after completion of work etc as specified. (i) 300 mm wide and average 250 mm deep with bed slope 1 in 150 with initial depth of 100 mm. 1 x 21.00 = 21.00 1 x 60.00 = 60.00 Total = 81.00
Supplying, fitting & fixing of Security fencing as per drawing & analysis. 1 x 21.00 x 2.50 = 52.50 2 x 9.00 x 2.50 = 45.00 Total = 97.50
Filling, levelling, compacting, grading etc. as per site condition. 1 x 21.00 x 9.00 x 0.30 = 56.70
HI-TECH CORPORATION
HI-TECH CORPORATION
Jayanta Khaund
Jayanta Khaund
HI-TECH CORPORATION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .