Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.2 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | Rejected-Technical | - | Rejected-Technical non-responsive |
Tender Value
₹41.1 Cr
EMD Value
₹82.3 L
Closing Date
27 Jan 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
xen
BDA OFFICE
Upliftment and Beautification of Junction namely Kali Bagichi Junction, Traffic Chauraha, Sheesham Tiraha Enty Plaza, Circuit House Junction and Red Cross Junction at Bharatpur City.
2026_UITBR_528788_1
online nit 35(2025-2026)01 bharatpur Development Authorit
Open Tender
Civil Works
Percentage
bharatpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
Secretary, BDA
₹82.3 L
Yes
BDA office
9 Feb 2026
17 Jan 2026
2 Feb 2026
17 Jan 2026
27 Jan 2026
17 Jan 2026
20 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202.
By Mechanical Means
Cement Concrete | 1,712 | Cum | 305 | ₹5,22,160 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202.
By Mechanical MeansReinforced Cement Concrete | 832.5 | Cum | 478 | ₹3,97,935 |
| 3 | Dismantling Stone Masonry as per MoRTH Specification Clause 202.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202.
Rubble Stone Masonry in Cement Mortar | 428.75 | Cum | 195 | ₹83,606.25 |
| 4 | Dismantling Kerb Stones
Dismantling kerb stones by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per MoRTH Specification Clause 202. | 1,155 | Rmt. | 8 | ₹9,240 |
| 5 | Dismantling CC jali including cost of making grooves in plaster and making good and including disposal of unserviceable surplus material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge. . | 50 | Sqm | 80 | ₹4,000 |
| 6 | Dismantling of Cement Concrete Pavements as per MoRTH Specification Clause 202.
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately (Exisiting Road).
Exisiting Circle Area | 2,790.83 | Cum | 632 | ₹17,63,804.56 |
| 7 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 Bituminous Courses.
Exisiting Site Road Area | 532.39 | Cum | 445 | ₹2,36,913.55 |
| 8 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 Granular Courses.
Exisiting Site Road Area | 1,330.99 | Cum | 312 | ₹4,15,268.88 |
| 9 | Dismantling of barbed wire fencing / wire mesh fencing including posts, foundation concrete, backfilling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m, stacking serviceable material and unserviceable material separately as per MoRTH Specification Clause 202. | 260 | Rmt. | 31 | ₹8,060 |
| 10 | Dismantling steel work in single sections including dismembering and stacking within 50 meters lead in: Channels, angles, tees & flats. | 36,400 | Kg | 1 | ₹36,400 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.21 MB
BOQ_943204.xls
BOQ • 0.45 MB
BidDocumentupliftment.pdf
Tender Documents • 7.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .