| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.7 LAccepted-AOC | L1 | Accepted-AOC first lowest | |
| 2 | L2₹39.0 L+₹2.9 L (7.91%)Rejected-AOC 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | L2 | Rejected-AOC second lowest | |
| 3 | L3₹39.1 L+₹3.0 L (8.39%)Rejected-AOC | L3 | Rejected-AOC third lowest | |
| 4 | L4₹39.5 L+₹3.4 L (9.47%)Rejected-AOC | L4 | Rejected-AOC forth lowest | |
| 5 | Not Admitted-Fee/PreQual/Technical NEW MADHOPUR COLONY SURAJKUND GORAKHPUR UTTAR PRADESH 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
19 Dec 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer Electricity Transmission Circle I 57 George Town Prayagraj 211002
Installation, Erection and commissioning of 40 MVA T/F and associated work at 132 KV Substation Jhunsi, under Electy. Trans. Division-I, Prayagraj.
2023_UPTCL_869705_1
113-ETC-I(A)/2023-2024
Open Tender
Electrical Works
Item Rate
60 days
Jhunsi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
SE,ETC,PRAYAGRAJ
₹40,000
12 Jun 2024
12 Dec 2023
20 Dec 2023
12 Dec 2023
19 Dec 2023
12 Dec 2023
Amount
The following are to be carried for increasing capacity from (2X63) MVA T/F to (2X63+1X40) MVA T/F at 132KV S/S Jhusi, under Electy Trans Division-I Prayagraj.
Shifting of main tank of 40 MVA transformer from unloading place to plinth including turning of tank if required including men T&P and all other associates works also if required to complete the job satisfactory at 132KV Jhusi, Prayagraj.
Up to 20 Meters
Additional Shifting of main tank of 132/33 KV 40 MVA T/F from unloading place (132 KV S/S Jhusi ) upto plinth including turnning of tank (if required) including men ,T&P all other work required to complete the job satisfectorily (01Job for every 5 meters).
Safe handling and shifting of all accessories of 132/33KV, 40 MVA transformer such as radiators, conservator tank, all bushing with its turrents, connecting pipe lines, cooling fan, motor drive mechanism of tap changer, RTCC Panel and associated oil pipelines etc from stored place of 132 KV S/S jhusi to erction site including other associated work to complete the job satisfactorily.All men, extra material(if required any) & T&P will be provided by contracor without any extra cost.
Complete erection of 40MVA transformer by erection of its radiators conservator tank all bushing their turrets connecting oil pipe lines. cooling fans, motor drive mechanism of tap changer oil pumps and associated oil pipe lines etc. to complete the job satisfactory including first filling of oil and topping up of transformer oil (Not circulation) in tank radiators oil pipes lines conservator tank etc. and attending the oil leakage, if any and all other associated works for satisfactory completion of work at 132KV S/S Jhusi contactor shall provide all assistance in getting the transformer successfully commissioned by providing qualified man power till commissioning including all men, T&P and associated arrangements.
Centrifuging of complete transformer oil of 01 no 40MVA transformer in transformer tank or oil tanker by connecting centrifuging pipes. Circulating the transformer oil through centrifuging machine to be provided by the contractor and taking the BDV values of the oil periodically till the required value of the oil as achieved as per direction of supervising engineer. All T&P, labor, centrifuging machine & other associated arrangements shall be provided by the contractor at his own cost.
Erection of new 40MVA T/F RTCC and C&R panel including shifting from store to control room.
Connection of the control cable as per cable schedule of 40 MVA T/F and its OLTC/RTCC panel, C&R panel, cooling fans & pumps, marshaling box etc using new cable including laying, dressing & binding of cable and as per site requirement of termination along with fixing of glands ferruling as per technical specification.
Earthing of main tank of 40MVA T/F by using M.S flat of size 75X10 mm, its jointing with already laid earth mat/deltas preparing neutral bushing support excavation of trenches for earthing work, its back filling etc. MS flat will be provided by contractor at his own cost.
Painting of 75X10 mm and 50x6mm earthing strip above the ground level by one coat of red oxide and two coat of green paints. Paint will be provided by contractor. All men, extra material(if required any) & T&P will be provided by contracor without any extra cost.
Delta earthing of 40MVA Transformer HV/LV neutral busing and 30KV LA by using M.S fiat 75x10 mm and earhing electrodes including its painting of 75x10 mm M.S fiat with one coat of red oxide primer and two coat of bus green enameled paint MS round bar and M.S fiat 75x10 mm provided by department.
Jumpering of 40MVA TF HV/LV side cutting of conductor and tightening of conductor with connector and complete all job satisfactorily.All men, extra material(if required any) & T&P will be provided by contracor without any extra cost.
Following pre-erection and pre–commissioning testing are required for erection and to charge 40 MVA, 132/33KV transformer at 132KV S/S Jhusi (Testing kit will also be provide by contractor on their own risk). The job includes the following works.
Polarity test, current ratio and knee point voltage test.
Current ratio of HV & LV bushing.
Knee point voltage test.
Transformer primary and secondary winding capacitance dissipation factor (Tan delta test, bushing capacitance test before erection and after erection on transformer.
Core insulation resistance test of Transformer.
Magnetizing current test of Transformer winding.
Vector group.
Open circuit and short circuit test.
Magnetizing balance test of Transformer.
Voltage ratio test.
Measurement of HV and LV winding resistance test of transformer.
Carriage of Oil tank 20KL including loading at 132 KV Saidabad & uloading at 132 KV S/S jhusi under ETD-Praygraj and after completing the work successfully oil tank will be returned back at 132 KV S/S saidabad ( Distance approx 15 KM labour ,hydra extra material (if required any ) & T&P will be provided by contractor without any extra cost .
supply of 75x10 mm MS Flat
supply of 50x6 mm MS Flat
Supply of 40MM dia MS Electrode of 3 meter length
Laying of following sizes of Copper control Cables in the Cable trenches from various equipments/marshalling boxes/J.B.s in switchyard to control/relay panels in Control Room as per cable schedule, its saddling with 25x 33 A.I saddle to every 750mm distanceand termination of control cable of control panels, Relay panel, CT. PT CB Isolator, ACDB. DCDB, Control Room and Switchyard. including carriage of cable drum from store to site and shiftin back to store and all other associated work to be complete the job saisfactorly as per technical specification.
2 core x 2.5 Sq. mm Control Cable
4 core x 2.5 Sq. mm Control Cable
6 core x 2.5 Sq. mm Control Cable
The following works required for Increasing capacity work ,construction of new one number 132/33 KV 40MVA Transformer III Bays and Existing of 33 KV Main Bus at 132 KV Substation Jhusi Under ETD-I Prayagraj
Sorting, counting and stacking erection mark wise and proper loading of structure, tower parts in truck/trailor
Safe carriage of loaded structure parts from EFU Naini, Prayagraj to 132KV S/S Jhusi. (Distance 35 KM approx)
Unloading of structure parts from the truck/trailer. Its sorting, counting and proper stacking at the sub-station premises as per direction of supervising engineer.
Erection of Main & Auxiliary Structure, equipments etc required for installation of CTs, PTs, isolator , Breaker, LAs etc at 132KV S/S Jhusi . The job consist shifting of all material i.e. structure parts, nuts, bolts, washers etc, from store to site of erection. Erection of structure as per relevant drawing and using flat/spring washer with each bolt matching holes, cutting notching of members if required shall also be done by the contractor without any extra cost of complete the work satisfactorily. All material to be erected shall be supplied by UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor on his own cost.
Erection of Equipment in properaligment and with complete adjustment in switchyard on the erected structure as permanufactures drawing or as per direction of supervising engineer ,after including shifting the equipment from store to working site etc .alongwith theirjunction boxes ,control cubicles andaccessories including cost of all labour ,T&P etc for proper complitonof work
145 KV SF-6 Circuit Breaker
145 KV Bus Isolator with Post Insulator
145 KV Current Transformer
145 KV Post insulator
132/33 KV CT/PT Junction Box
120/30 KV Lightning Arrestor
36KV VCB
36KV Bus Isolator
Stringing of Main Bus /Jack Bus bar Twin ACSR moose conductor including hosting of disc insulator tension stong with associated tension fitting along with shifting of the new conductor tension fitting ,spacer etc from stores at the sub station to the switch yard (01 job for each pahse of each section of the main & jack bus )
Stringing of 33 KV Main Bus of Twin Moose Conductor Having Length more ( one span for is phase = 1job)
Stringing of Jack Bus of Moose Conductor Having Length more than 24 Mtr ( one span for is phase = 1job)
Fixing of spacer suitable for 33 KV Bus bar to twin ACSR moose Conductor with 250 mm spacing and duly made of LM-6 Aluminium alloy complite with 12 mm distance HDS bolts nuts .spring & plain washers as per techanical specification & sample .
Interconnection & jumpering of various 132 KV equipments/ Bus with ACSR Panthor Main Bus Conductors, Post Insulator equipments with the help of suitable PG clamps (to be provided by department) with all other associated works for satisfactory completion of the job as per technical specifications. (1 Job includes Interconnection and jumpering of all the equipments in that Bay)
Earthing of all equipment of structure by using 50x6 MS flat ( provided by contractor) below 600 mm form ground level and connecting it with existing Earthmats includes back filling of excavated earth its leveling and proper ramming and associated works including the cost of labour and T&P required to complete the job satisfactorly
Painting of MS flat by one coat of red oxide primer and two coat green enamel paint.(Asian/Berger)
Providing and fixing of 160 watt LED light AC volatge90-300 Volt 50 Hzhousing of pressure diecasting with operating temprature 20 to 60 degree celsius along with 1 meter long steel band pipeand clamp with nut & bolt for fixing of Cromption /Bajaj /Havels make CRI not less than 70 inch as position to give maximum output .
supply and fixing of junction box on coloum of size100x200x150mm .The box consists of 01 Nos 6 amp MCB and bakelite terminal strip of 04 Nos terminal fixed inside the box.The fixing clip nut bolt &washer will be arranged by the contractor at his own cost.
laying 2x2.5sq mm PVC control cable from LED Light to inside the junction box with the help of cable supporting clap (control cable providedby department)
Laying of 40mm diameter MS round bar 800 mm blue ground level including cutting strengthening welding and jointing to existing Earth Mat planting of one coat red oxide and two coat of black bituminous paint adjoins excavation of trench it's back filling and all other associated work to be complete extension bay as per drawing and technical specification excluding the cost of M S round bar ( Row to row distance 6 mtr)
Supply of 40 mm Dia MS rod
Fabrication of 3M long electrods with 40 mm round bar having 150 mm long conical shape and then its piercing vertically inside the ground level and its welding with earthmat excluding the cost of Bar
Supply and laying of following B class M.S.pipe line as per specification at 132 KV sub station jhusi Prayagraj .T scket ,flange etc Complete with associated elbow /bend with anticorrosive treatment by bituminous painting on surface of pipe lines and then wrapping hot dipped bitumen jute in ywo layers by cutting ,bending ,fabrication welding etc.of M.S. pipe lines as per site requirement including digging of earth 1 meter below groung level as ewll as below the bed of cable trenchs and road crossing and finally filling leveling of earth including concerting of road crossing as per standerd ratio of RCC
supply & laying of 100 mm dia MS Pipe
supply & laying of 80 mm dia MS Pipe
100 NB Valve
80 NB Valve
Supply and installation of fire hose box 63 mm dia gun metal hydrent with hose pipe 15 mtr long hose pipe and nozzle.
Providing and Fixing of 50x50x6 MS angle for supporting of pipe line and hose box.
Supply of bolted type single tension fitting along with turn buckle and all accessories for single panther conductor as per sample
Supply of bolted type double tension fitting along with turn buckle and all accessories for double moose conductor as per sample
Supply of rigid spacer for moose conductor 02 bolts 250 mm spacing complite with hot dip galvonized nut bolts spring &plain washer .The spacer shall be naving minimum current carrying caoacity of 800 Amp .
supply of tension clamp suitable for 7/3.25 mm GS earth wire .
supply of B-metelic PG Clamp duly made of LM-6 aluminium ally suitable of ACSR Mooseconductor to Panther conductor
supply of B-metelic PG Clamp duly made of LM-6 aluminium ally suitable of ACSR Mooseconductor to Panther conductor
Laying, tensioning, stringing, clamping, jointing etc. complete with ACSR Panther conductor per phase including hoisting of insulators, fitting of all necessary hardware and accessories etc. of all three conductors for all the three phases for 33KV Main Bus . (Cost includes all T&P, labour and transportation charges of material from UPPTCL store to site of work)
Erection of main & auxiliary structure at 132 KV sub station jhusi .The job including shifting of all material from store to site then erection of structure as per drawing proper site of nuts bolts and washer will be provided by UPPTCL.All labour and T&P required for satisfectoily complition of work ,shall be arrenged by the contractor at his own cost.
Erection of following equipments as per instruction manual of various equipments including its shifting from the store to the site including the other associated works to complete the job satisfactory.
33 KV Circuit Breaker
36 KV CT with Junction box
36 KV Bus Isolator / line isolator
Capacitor Bank Structures
Capacitor Unit
Series Reactor
Jumpering of equipments by ACSR Panther conductor including shifting of conductor, fitting , insulators from store to site, its straightening, cutting, bending of conductors for making jumpers and shifting of remaining of conductor/ material from site to the store.
Stringing of various Single phase bus of 33 KV Jack Bus with different type conductor and different length of span as mentioned below .The work Includes cutting & bending of conductor ,Fixing of single /double bolted type tension fitting /suspension .Hoisting of disc insulator and shifting of material from store to eraction site and all other associated work to complete the work satisfactorily as per drawing and techanical specification.
Laying of following size of unarmoured control cable in the cable trench from the control relay panel to the various equipments junction boxes etc in switchyard as per cable schedule, its saddling at every 75mm distance with MS saddle of size 25x3mm including carriage of cable drums from store to the laying site and shifting back of remaining materials back to store and other associated work to complete the job satisfactory.
Termination of following size control cable as laid above as per cable schedule including making necessary holes in glands plate of junction boxes , supply and fixing of cable gland ferrule of appropriate size and quantity respectively for each core of cable and its termination with crimping type lugs including lugs, ferrules & other minor accessories to complete job satisfactory
Earthing of auxiliary structures by 50 x 6mm size MS flat (to be provided by the contractor at his own cost) including cutting, straightening, bending, laying 600 mm below ground level by digging trenches of suitable size, its welding with main earthmat including painting of joints with non corrosive paint on flat. Painting of the flats above ground level with good quality Berger/Shalimar/Asian make bus green paint after cleaning and applying one coat red oxide primer on the flats. Back filling of excavated earth, its leveling and proper ramming and all associated works including the cost of labour, T&P required to complete the job satisfactory.
Dismantalling and shifting of following Equipments of as per2X5 MVAR capacitor bank instruction manual of various equipment ,shifting from site to store including all other associated works for satisfactory complete of the job satisfactorily
33 KV VCB
33 KV isolator LI
33 KV isolator BI
33 KV Series Reactor (3 phase)
33 KV NCT
33 KV 5 MVAR capacitor unit
Dismantalling of 3-phasejumper main Bus to Line isolator and line isolator to capacitor bank unit ,unit to reactor at 132 KV sub station jhusi
Dismantalling and shifting of following Equipments of 2Nos 132 KV Kunda and 132 KV soraon bay with all equipment .Shifting from site to store including all other associated works for satisfactory complete of the job satisfactorily
132 KV CVT
132 KV Lighting arrester
132 KV CT/PT Juction Box
132 KV Line/Bus isolator
Opening /Cutting of R,Y& B phase panther conductor from 132 KV bus,CT,PT,LSI and BSI of 132KV Kunda Soraon bay including cost of all T&P andlabour
Dismantalling and shifting of following Main & Auxilery Equipments Structure of 132 KV Kunda Bay ,132 KV Soraon Bay & 33 KV 2X5 MVAR capacitor bank instruction manual of various equipment ,shifting from site to store including all other associated works for satisfactory complete of the job satisfactorily
ATM (3 No)
AXM (2No)
XPM(3 No)
YMM (3No)
BBL (4 No)
BCT (12 No)
ALP (14 No)
CCM(4 No)
CGM(2 No)
CPM (4 No)
ABL (3 No)
Dismentalling of following equipment as instruction manual of various equipment encluding shifting from control room to store side including allother associated work to complete the job satisfectory
132 KV Control panel
132 Kv relay panel
Removing /Discementling of old and used control cable 2x2.5qmm,4x2.5 sq mm ,6x2.5 Sqmm &10 Sqmm from control room to 132 KV bay at 132 KV s/s Jhusi prayagraj the work including opening the tranch cover open the tag from parforated tray after disconnection of terminal removing the cable from tranch then replacing the store after proper make roll
Hi-tech power transmission
M/s S.S. Refregeration
Meena Elect & Engg. Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .