Tender Value
₹42 L
EMD Value
₹84,000
Closing Date
9 Jun 2022, 6:00 pmClosed
GE (MCTE) Mhow
GE (MCTE) Mhow (MP) 453441
CERTAIN MISC REPAIR TO SEWAGE LINE, MANHOLES, SEPTIC TANK, DRAINS, INCLUDING CLEAING OF SEWAGE LINE, DESILTING OF DRAINS, HARDSTANDING, PAVER BLOCK, FENCING, COMPOUND WALL, GATES AND OTHER MISC WORK AT OTM AND MD ACCN JCOS/ORS, HEMA LINE, THIMMAYA LI
2022_MES_523944_1
GE(MCTE)/MHOW/21(T) OF 2022-23
Open Tender
Civil Works
Works
180 days
GE (MCTE) Mhow
As Per Tender Document
9 documents required · 9 mandatory
₹500
Yes
GE (MCTE) Mhow
₹84,000
Yes
24 Aug 2022
13 May 2022
11 Jun 2022
13 May 2022
9 Jun 2022
27 May 2022
Amount
Excavation in trenches, not exceeding 1.5 M wide and not exceeding 3 M depth for foundation, etc., and getting out in hard/ dense soil. Complete all as specified note taking out drain pipe shall be measured and paid separately
All as per iitem No 4.00 here in before but exc 1.5m and n. exc 3m deep all as specified and directed.
Demolition and breaking 100mm bore. drain pipes (Salt glazed ware, AC or reinforced concrete set in cement mortar, separation of serviceable materials from the unserviceable, stacking the serviceable materials within 100 M and disposal of unserviceable materials, debris and rubbish to a distance not exceeding 100 M as directed by the Engineer in Charge.
Demolition and breaking 150 mm bore. drain pipes (Salt glazed ware, AC or reinforced concrete set in cement mortar, separation of serviceable materials from the unserviceable, stacking the serviceable materials within 100 M and disposal of unserviceable materials, debris and rubbish to a distance not exceeding 100 M as directed by the Engineer in Charge.
Demolition and breaking 200mm bore. drain pipes (Salt glazed ware, AC or reinforced concrete set in cement mortar, separation of serviceable materials from the unserviceable, stacking the serviceable materials within 100 M and disposal of unserviceable materials, debris and rubbish to a distance not exceeding 100 M as directed by the Engineer in Charge.
M & L for PCC 1:3:6 type C2 (using 40mm graded stone aggregate) in concrete bed to drain pipes including packing under and haunching against the sides of pipes after they are laid and tested for pipes of 100mm bore complete all as specified. Note : Thickness of bed below the barrel of pipe 10cm for pipe 100 mm and 150mm bore, 15cm for 200mm bore & over
M & L for PCC 1:3:6 type C2 (using 40mm graded stone aggregate) in concrete bed to drain pipes including packing under and haunching against the sides of pipes after they are laid and tested for pipes of 150mm bore complete all as specified. Note : Thickness of bed below the barrel of pipe 10cm for pipe 100 mm and 150mm bore, 15cm for 200mm bore & over
M & L for PCC 1:3:6 type C2 (using 40mm graded stone aggregate) in concrete bed to drain pipes including packing under and haunching against the sides of pipes after they are laid and tested for pipes of 200 mm bore.complete all as specified. Note : Thickness of bed below the barrel of pipe 10cm for pipe 100mm and 150mm bore, 15cm for 200mm bore & over
M & L for Salt Glazed stone ware pipes, 100mm bore grade "A" jointed with cement mortor, laid in trenches andincluding fittings of same grade, complete all as specified
M & L for Salt Glazed stone ware pipes, 150mm bore grade "A" jointed with cement mortor, laid in trenches andincluding fittings of same grade, complete all as specified
M & L for Salt Glazed stone ware pipes, 200mm bore grade "A", jointed with cement mortor, laid in trenches andincluding fittings of same grade, complete all as specified
Returning, filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in hard soil complete all as specified
Removing Excavated spoiln to a distance execeeding 1.50 km but not exceeding 5 KM and depositing where directed. At a level not exe 1.50 m above the starting point complete all as specified
Cleaning the septic tank/sludge chamber of any depth/area/condition including taking out stagnated sludge or any other material mixed with the sludge etc deposited in the septic tanks, filling in closed containers and depositing in excavated pit, covering the pit with earth after depositing sludge, sprinkling fresh lime on covered pit and around septic tanks/ soakage wells to make it hygenic complete all as specified and directed. Note:- (i) Cost of pumping with mechanical sewage pump, excavation of earth pit and fresh lime shall be deemed to include in the unit rate quoted. (ii) Charges of covered container incl its transportation shall be deemed to include in the quoted unit rate. (iii) Depth of liquid sludge in the septic tank will be determined and recorded before commencement of work by any Engg conventional method in the presence of Engr-in charge and Contractor.
Disludging Man Holes by taking out sludge and foregin materials and excavating a pit of appropriate size depositing sludge in the pit and covering with 30 cm thick layer of soil to cover the sludge including removing surplus soil where directed by Engineer-in-Charge including sprinking of bleaching powder over the pits. (a) Depth of manhole upto 2 Mtrs
Cleaning of existing sewage lines of 100mm bore by rodding with split bamboo/ cleaning rods so as to clean the line blockage and allow to flow effluent to the next man hole including pumping of sewage water wherever required. all as directed by enginner in charge
Cleaning of existing sewage lines of 150mm bore by rodding with split bamboo/ cleaning rods so as to clean the line blockage and allow to flow effluent to the next man hole including pumping of sewage water wherever required. all as directed by enginner in charge
Cleaning of existing sewage lines of 200mm bore by rodding with split bamboo/ cleaning rods so as to clean the line blockage and allow to flow effluent to the next man hole including pumping of sewage water wherever required. complete all as directed by enginner in charge
M&L for Cleaning the blockage gully trap/ floor trap/ nahani trap up to firs manhole by rodding complete enable the sewage to flow freely to the next manhole removing the sludge and other materials from the manholes by suitable means and removing all the materials obtained from the manholes out side md land and clearitng the complete area incl making good any damages to the manholes, complete all as directed by enginner in charge
Desilting of Drains in any condition [including foul condition] with necessary dewatering and temporary diversion of drain water as required including disposal of spoil to outside MD land including removing and replacing cover slabs complete all as directed.
M & L for removing the plants from the surfaces of the building with complete roots, applying recommended chemical to prevent further growth as directed, making good the disturbed surface with cement mortar 1:3 and applying the same surface finish of the existing surface and finished to match with the surrounding surfaces including removal of debris etc. out side the premises complete all as required and as directed by Engineer-in-charge.
Demolition of reinforced cement concrete in ground floors and pavings not exceeding 15 cm thickness, (Below or above ground level) separation of serviceable materials from the unserviceable, stacking the serviceable materials within 100 M and disposal of unserviceable materials, debris and rubbish to a distance not exceeding 100 M as directed by the Engineer-in-Charge.
Precast cement concrete 1:2:4, type B1 (Using 20mm graded stone aggregate) in landings, bed plates, pintle blocks, anchorage blocks, cover slabs (for manholes etc.) shelves and similar articles with plain faces and set in cement mortar 1:4 including necessary form work, complete all as specified.
Mild steel deformed or TMT bars 8mm to 10 mm bore. cut to length, bent to shape required, in stirrups, spacers and binders and binding with mild steel wire (annealed) not less than 0.9mm bore. or securing with clips.
All as per item No 23 above but 6 to 8 mm bore.
Cutting into existing manholes for connecting new drains making good to pipe and rendering cutting out existing benching for and forming branch channel (1/2 round or 3/4 round section) in cement concrete 1:2:4 type B1, smooth finished and reforming benching as required for 100mm bore. of pipe.
Cutting into existing manholes for connecting new drains making good to pipe and rendering cutting out existing benching for and forming branch channel (1/2 round or 3/4 round section) in cement concrete 1:2:4 type B1, smooth finished and reforming benching as required for 150mm bore. of pipe.
Cutting into existing manholes for connecting new drains making good to pipe and rendering cutting out existing benching for and forming branch channel (1/2 round or 3/4 round section) in cement concrete 1:2:4 type B1, smooth finished and reforming benching as required for 200mm bore. of pipe.
Taking down pvc, soil, waste and rain water pipes (any size or pattern) including all fittings, heads, shoes. Bends, swan-necks etc. including cleaning or refixing or removal to store. up to 4th storey
S & F for 75mm bore PVC (SWR) Soil, waste and vent pipes single socketed in any length with rubber ring joints fixed to walls up to 4th storey
S & F for 110mm bore PVC (SWR) Soil, waste and vent pipes single socketed in any length with rubber ring joints fixed to up to 4th storey
S & F for 75mm bore PVC (SWR) bends of any radius with access door from ground floor to 4th storey.
S & F for 110mm bore PVC (SWR) bends of any radius with access door up to 4th storey
S&F for 75mm bore PVC (SWR) branch piece, single (single Y) equal or unequal from ground floor to 4th storey.
S&F for 110mm bore PVC (SWR) branch piece, single (single Y) equal or unequal from ground floor to 4th storey.
Dismantling of cast iron/ pvc pipes jointed in cement mortar 100/110mm bore all as specified and directed
Dismantling of cast iron/pvc pipes jointed in cement mortar 75mm bore all as specified and directed
S & F 75mm bore Cast Iron Spun pipes, Soil, waste and vent pipes in any length with or without ears, with cement joints, fixed to walls up to 4th storey
S & F 110mm bore Cast Iron Spun pipes, Soil, waste and vent pipes in any length with or without ears, with cement joints fixed to walls up to 4th storey
S&F for 75 bore Bends (any radius), diminishing pieces or tapers (larger bore measured) from ground floor to 4th floor
S&F for 110 bore Bends (any radius), diminishing pieces or tapers (larger bore measured) from ground floor to 4th floor
S&F for 75mm bore Branch pieces, single (equal or unequal), ordinary or inverted (spigot or socket type) or with parallel branches
S&F for 110mm bore Branch pieces, single (equal or unequal), ordinary or inverted (spigot or socket type) or with parallel branches
S&F for 75mm bore pipe stack clamps out of 50mm x 5mm flat iron and 16mm dia round iron stays including bolts and nuts and securing ends of stays to wall or roof from ground floor to 4th floor.
S&F for 110mm dia pipe stack clamps out of 50mm x 5mm flat iron and 16mm dia round iron stays including bolts and nuts and securing ends of stays to wall or roof from ground floor to 4th floor.
S & F Cast Iron Floor trap of 100mm outlet with grating including jointing to waste pipe fixed in cement concrete Type B1 1:2:4. up to 4th storey
S & F Cast Iron Nahani trap of 100mm outlet with grating including jointing to waste pipe fixed in cement concrete Type B1 1:2:4. up to 4th storey
S&F in repairs PVC floor trap, with grating 75mm including jointing to wast pipe fixed in cement concrete type B1 (1:2:4) ,in repairs and including waterleak proor treatment complete all as specified and directed.
S&F Reinforced concrete pipes 200mm bore class NP2, laid and jointed complete with collars
S&F Reinforced concrete pipes 300mm bore class NP2, laid and jointed complete with collars
S& F in repairs vitreous china wash down water closet pan padestal pattern, white, (excluding flushing cistern and flush pipe) and connected to trap and flush pipe complete all as specified and directed.
S & F vitreous china squatting pan 'Orissa' pattern, size 580 x 440mm white in repairs with integral foot rests (Excluding flushing cistern and flush pipe)
S & F in repair PVC syphonic action type flushing cistern 10 lit capacity with complete internal kit including bracket fixed in repair (including flushing pipe complete) of make as specified.
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing debrish and rubbish off the premises and stacking serviceable tiles.
M&L for non skid ceramic coloured tiles 7 to 8 mm thick (square/rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including 15mm thick screed bed in CM 1:6
M&L for Glazed ceramic tiles in vertical surface 300x 200x 7 mm thick over 10mm thick bakcing coat in Cm 1:4 etc set and jointed in neat cement slurry and pointed in white or colour cement to match
M&L for Glazed ceramic tiles in vertical surface 350 x 250 x 7mm/ 450 x 350 x 7mm over 10mm thick bakcing coat in Cm 1:4 etc set and jointed in neat cement slurry and pointed in white or colour cement to match
Demolition of un-reinforced Cement Concrete of any description and in any position not otherwise specifically provided for, separation of serviceable materials from the unserviceable, stacking the serviceable materials within 100 M and disposal of unserviceable materials, debris and rubbish to a distance not exceeding 100 M as directed by the Engineer in Charge.
M&L for PCC 1:5:10 type E2 using 40mm graded aggregate oas in Mass concrete in sunkan treatment.
M&L for water proofing treatment to sunken surfaces of the slab in following sequences:-
(a) Slope correction by using M-20 (Nominal Mix) concrete minimum 25mm thickness at one end and a slope of 1:20 by using 12.5mm graded stone aggregate with integral water proofing Chemical PIDI PROOF-LW mixed in proporation 200ml /50 Kg cement of DR Fixit of Pidilite Industries Ltd or STP No 1 (liquid) of STP Ltd in proporation 200ml / 50 Kg cement or equivalent as per manufacturer instructions complete.
(b) PCC padding with cement concrete 1:1.5: 3 type A 0 (using 12.5mm graded stone aggregate) 25mm thick with integral water proofing compound "Dr Fixit" manufactured by M/S Bouchemic or equivalent as per manufacturer instructions complete.
(c) Vertical sides plastered in CM 1:3, 15mm thick with WPC and 72 hours testing for water tightness by ponding of water complete.
(d) Application of two coats proof coats black manufactured by M/S Dr fixit or equivalent as per manufacturer instructions all over and testing again for water tightness by ponding of water for 72 hours complete.
Demolition of brick work or stone/ boulder masonry, built in cement mortar including all quoins, pillars etc. separation of serviceable materials from the unserviceable, stacking the serviceable materials within 100 M and disposal of unserviceable materials, debris and rubbish to a distance not exceeding 100 M as directed by the Engineer in Charge.
Walling of random rubble, uncoursed, well bonded, bedded and solidly hearted, built in cement mortar 1:6
Walling of random rubble, uncoursed, well bonded, bedded and solidly hearted, built in cement mortar 1:6 but except stone.
M&L for Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6 M mean radius built in cement mortar 1:4 using old size bricks , complete all as specified
M&L for brick work with modular size kiln well burnt sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick wall built in CM 1:4
M&L for plain cement concrete, type B1, 1:2:4 (Using 20mm graded granite stone aggregate) cast in situ in bed blocks, copings and the like including weathering, solightly rounded or chamfered angles and throating as directed including use and waste of form work.
Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. including removal of rubbish off the premises, removal and depositing serviceable materials where directed and leaving the work clear of any plastering.
Rendering 15mm thick on fair faces of brick work or concrete surfaces in cement mortar 1:4 and finished even and smooth without using extra cement including mixing of water proofing compound wherever required.
M&L for raised pointing to RR stone walling with CM 1:3 complete all as specified and as directed
M &L for Cement concrete type B2, 1:4:8 (using 40mm graded stone aggregate) in foundation filling and mass concrete complete all as specified and as directed.
M & L for Chequered cement concrete tiles 300 x 300mm, 25mm thick, as in floor/path, set, jointed and pointed in neat cement slurry with grey cement and pigments, laid over and including 15mm thick screed bed in CM(1:4)all as specified.
M&L for sand filling under floors or in foundations below interlocking tiles path including watering and consolidation complete all as specified
M & L for Machine pressed precast conctete interlocking paver block any shape and size confirming to IS 15658-2006 of 60mm thickness M-40 Grade with grey cement and pigment complete all as specified.
M&L for providing Precast cement concrete in type B-1, 1:2:4 (20mm graded aggregate) in Kerbs and edging to road, divider and foothpath etc incl necessary earthwork with plain fair faces, incl chamfered whethereing, throating etc and setting in cement mortar 1:4 complete with joints to match.
M&L for preparation of new concrete surface of any description over 10cm girth or width, not otherwise described and applying two coats of synthetic enamel paint compete all as spcified and directed.
M&L for Precast Cement concrete 1:2:4 Type B0 (Using 12.5mm graded stone aggregate) in 35mm thick Jallies or louvers including all mouldings complete and set in Cement Mortar 1:4 complete all as specified
Dismantling of RCC Jallies of any thickness and disposal of unserviceable materials, debris and rubbish out side MD Land complete all as directed by the Engineer in Charge.
M&L for Preparing new plastered surfaces of walls by brooming down or by steel wire brushing, scrapping down smoke, soot, moulds, moss and efflorescent salts and trading oil and greasy Spots and applying two coat of white wash complete all as specified and as directed.
M&L for PCC 1:3:6 Type C-1 using 20mm graded coarse aggregate in coping including necessary formwork and benching in bottom of manholes in half round shape.
M&L for PCC 1:2:4 type B-1 using 20mm graded stone aggregate, 40mm thick in flooring complete all as directed.
M&L for cement concrete 1:3:6 type C-2 using 40 mm graded coarse aggregate in foundation of drain or Manhole.
Puncturing existing SWG pipe line of any dia at any place between manholes for clearing blockage in pipes including necessary excavation, returning filling in and removing surplus soil and making good punctured area with CM (1:1) complete all as specified and directed.
S & F cast iron bend (Sand cast) of any radius with or without oval access door including jointing with cement joints for (100mm bore)
S & F 100mm cast iron branch piece (sand cast) single (equal or unequal) ordianary or inverted spigot or socket type or with parallaled branches and fitted with or without oval access door and fixed to soil pipe in cement joints 1:2
S & F salt glazed stone ware gully trap of size 150 x 150mm to existing pipe line set in PCC 1:3:6 type C2 and jointed in cement mortar (1: 1) in repairs all as specified
S & F in repair 40mm dia low density polyethylene pipes (LDPE) with fitting of pressure ratting 6 Kg / Sqcm fixed to wall /ceiling or in floors including necessary fittings complete all as specified and directed.
M & L for taking out saturated broken bricks from soak well (soakage pit) and refilling with fresh broken bricks of guage 40 to 80mm size and disposal of rubbish / unserviceable material to a distance n exc 50m from site complete all as directed by Engineer-in-Charge
Disludging Man Holes by taking out sludge and foreign materials and excavating a pit of appropriate size depositing sludge in the pit and covering with 30 cm thick layer of soil to cover the sludge including removing surplus soil where directed by Engineer-in-Charge including sprinking of bleaching powder over the pits. (a) Depth of manhole upto 2 Mtrs Note. (i) cleaning shall be the responsibility of the contractor for the entire period of contract. (ii) 50% of quoted amount shall be deducted form the executeed quantities if not cleaned for the entire period of contract.
Disludging Man Holes by taking out sludge and foregin materials and excavating a pit of appropriate size depositing sludge in the pit and covering with 30 cm thick layer of soil to cover the sludge including removing surplus soil where directed by Engineer-in-Charge including sprinking of bleaching powder over the pits. (a) Depth of manhole upto 2 Mtrs n.exc 4 Mtrs Note. (i) cleaning shall be the responsibility of the contractor for the inter period of contract. (ii) 50% of quoted amount shall be deducted form the executeed quantities if not cleaned for the entire period of contract.
Pumping out water/liquid/sludge or any other waste materials, stagnated in septic tank/soak wells by mechanical pump, filling in closed container and discharging the same in nallah/drains through hose pipe or by other means outside of MOD land, atleast 500 m beyond living accn complete all as specified and directed. Note-: Record of pump operated shall be maintained date wise duls signed
S & F 150mm bore reinforced concrete pipes, class NP-2, laid and jointed including testing, with collars complete all as specified and directed.
S&F 50mm thick sand stone slabs in manholes cover of required size, set and pointed in cement mortar (1:4) complete all as specified and directed.
Dismantling PCC paver block/ tiles, dry laid, of any thickness and re-laying in same position with same specification complete all as specified and directed.
M&L for mild steel work as in clamps, hold, fast etc and similar small articles supports or stays for rain water confirming to Fe 290 Ged -E-165complete all as specified.
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing debrish and rubbish off the premises and stacking serviceable tiles .
M&L for non skid ceramic coloured tiles 7 to 8mm thick (square/rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including 15mm thick screed bed in CM 1:6
All as per item No 64 above but on vertical surfaces such as skirting incl including 10mm thick rendering in cement mortar 1:4 rough finish to receive the tiles complete all as specified and directed.
SANJAY ENTERPRISES
kriti construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .