Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹8.3 L
Closing Date
19 Jun 2026, 2:00 pm
Superintending Engineer 4th Circle HPPWD Shimla
Superintending Engineer 4th Circle HPPWD Shimla
C/o 60 mtrs Span Double lane Steel Truss Bridge Over Shallu Khad (under RIDF-XXXI)
2026_PWD_135575_1
SE-IV-PWD-NABARD-26- 2775-83 dt 2-6-26
Open Tender
Civil Works - Bridges
540 days
Shimla
AS per SBD
24 documents required · 24 mandatory
₹7,000
₹8.3 L
4 Jun 2026
4 Jun 2026
20 Jun 2026
4 Jun 2026
19 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation for structures in all depths as per drawing and technical Specificationclause 305.1 including setting out, construction of shoring and bracing, removal of stumps-and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated . Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall-be excavated with chiseling and wedging out rock(where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of useful materials for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner treaming filling of unevenness blindage and finishing of the road to specified dimension or as directed by the Engineerin-in-Charge. If the foundation-of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him in all cases. | 1,000.8 | Per Cubic Meter | 734.1 | ₹7,34,687.28 | BI01010001010000000000000515BI0100001113 |
| 2 | Plain/Reinforced Cement Concrete M15 (Grade Fifteen) 40mm (Forty millimeter nominal size of aggregate ) in Open Foundation and below approach slab complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100 including the cost of formwork. The rate including octroi, royality, Malkana, toll tax, or other taxes but excluding GST imposed by the Government. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 42.2 | Per Cubic Meter | 6,271.6 | ₹2,64,661.52 | BI01010001010000000000000515BI0100001118 |
| 3 | Providing and laying Plain/Reinforced Cement Concrete M35 ( Grade Thirty Five) 20mm (Twenty millimeter nominal size aggregate) in Open Foundation complete as per Drawing and Technical Specifications. clauses 1500, 1700 & 2100 including the cost of formwor. The rate including octroi, royality, Malkana, toll tax, or other taxes but excluding GST imposed by the Government. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 154.62 | Per Cubic Meter | 7,535.75 | ₹11,65,177.67 | BI01010001010000000000000515BI0100001122 |
| 4 | Supplying, fitting and placing HYSD bar reinforcement in Foundation complete as per drawings and technical specifications Clauses 1600. The rate including octroi, royality, Malkana, toll tax, or other taxes but excluding GST imposed by the Government. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 17.01 | Per Metric Tonne | 91,914.55 | ₹15,63,466.5 | BI01010001010000000000000515BI0100001123 |
| 5 | Providing and fixing 25 mm (Twenty five millimeter) diameter 3 meter (Three meter ) long steel rock bolts including drilling 45 mm (Forty Five millimeter) dia holes, plate, nuts, cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and all other ancillary operations etc. complete as per Drawing and Technical Specifications Clauses 2806 & 3200. The rate including octroi, royality, Malkana, toll tax, or other taxes but excluding GST imposed by the Government. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 45 | Each | 3,047.1 | ₹1,37,119.5 | BI01010001010000000000000515BI0100001124 |
| 6 | Providing and laying Plain/Reinforced cement concrete Grade M 35 (Grade Thirty Five ) 20mm (Twenty millimeter nominal size aggregate) in sub-structure complete as per drawing and Technical Specifications Clause 1500, 1700 & 2200 including the cost of formwork. The rate including octroi, royality, Malkana, toll tax, or other taxes but excluding GST imposed by the Government. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 428.31 | Per Cubic Meter | 8,047.9 | ₹34,46,996.05 | BI01010001010000000000000515BI0100001125 |
| 7 | Providing and laying Plain/Reinforced cement concrete Grade M 40 (Grade Forty ) 20mm (Twenty millimeter nominal size aggregate) in sub-structure complete as per drawing and Technical Specifications Clause 1500, 1700 & 2200 including the cost of formwork . The rate including octroi, royality, Malkana, toll tax, or other taxes but excluding GST imposed by the Government. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 1.96 | Per Cubic Meter | 8,350.95 | ₹16,367.86 | BI01010001010000000000000515BI0100001126 |
| 8 | Supplying, fitting and placing HYSD bar reinforcement in substructrue complete as per drawings and technical specification Clauses 1600 & 2200. The rate including octroi, royality, Malkana, toll tax, or other taxes but excluding GST imposed by the Government. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 60.24 | Per Metric Tonne | 92,205.4 | ₹55,54,453.3 | BI01010001010000000000000515BI0100001127 |
| 9 | Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications. The rate including octroi, royality, Malkana, toll tax, or other taxes but excluding GST imposed by the Government. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 880 | Per Metric Tonne | 324.5 | ₹2,85,560 | BI01010001010000000000000515BI0100001128 |
| 10 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm (Six hundred millimeter) with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. The rate including octroi, royality, Malkana, toll tax, or other taxes but excluding GST imposed by the Government. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 208.08 | Per Cubic Meter | 1,754.23 | ₹3,65,020.18 | BI01010001010000000000000515BI0100001129 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.93 MB
SBD41390116Bridge.pdf
Tender Documents • 1.46 MB
BOQ_200769.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid