| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹36.2 L
EMD Value
₹72,000
Closing Date
28 May 2026, 5:00 pmClosed
General Manager ( P and C Division)
P and C Division, Kishanganga Power Station, Bandipora
Repair and Maintenance of Downstream Apron and Right Bank Slope at Dam Site of Kishanganga Power Station, Gurez, Bandipora, J and K (PKG-588).
2026_NHPC_907680_1
NH/KG/PnC/DAM/PKG-588/2026
Open Tender
Civil Works
Works
90 days
Dam Site, KGPS, Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Collection Account NHPC Limited Kishanganga HE Pro
₹72,000
Yes
3 Jun 2026
7 May 2026
3 Jun 2026
7 May 2026
28 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 42 | Cum | 2,247.14 | ₹94,379.88 |
| 2 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering,
finishing and reinforcement.
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 102 | Cum | 10,865.58 | ₹11,08,289.16 |
| 3 | Providing and laying in position machine batched and machine mixed design mix M-35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in charge. Note: - Cement in this item is @ 350 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level | 42 | Cum | 9,766.54 | ₹4,10,194.68 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 510 | Sqm | 561.55 | ₹2,86,390.5 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more | 0.6 | Kg | 110.96 | ₹66.58 |
stage.html
html • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
tenderdocument.pdf
Tender Documents • 2.47 MB
BOQ_954018.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .