| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-Finance | ₹4.0 L | L1 | Accepted-Finance LESS |
| 2 | L2₹4.1 L+₹6,291.30 (1.57%)Rejected-Finance | ₹4.1 L+₹6,291.30 (1.57%) | L2 | Rejected-Finance MORE |
| Sl No | Description | Qty | Unit | ADHAV BUILDERSS L1 | KAARDEEP ENGINEERING L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the Old Damaged Cement Concrete as per the direction of the departmental officers. | 17 | M3 | 480 ₹8,160 Lowest | 486 ₹8,262 |
| 2.00 | Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS | 74 | M3 | 180 ₹13,320 Lowest | 186 ₹13,764 |
| 3.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregater) using 40mm BSS HBG metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 13 | M3 | 5,100 ₹66,300 Lowest | 5,125.2 ₹66,627.6 |
| 4.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (upto 4
Feet) | 261 | M2 | 260 ₹67,860 Lowest | 270 ₹70,470 |
| 5.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregater) using 20mm BSS HBG metal and including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 27 | M3 | 5,800 ₹1,56,600 Lowest | 5,830.5 ₹1,57,423.5 |
| 6.00 | Plastering with cement mortar 1: 5 mix (One cement and five sand) 12 mm thick including cost and conveyance of all materials,finishing,curing,and all labour chargesetc.completeas Standard specification. | 282 | M2 | 265 ₹74,730 Lowest | 270.1 ₹76,168.2 |
| 7.00 | Conveyance of the excavated earth work and including all cost etc complete., | 91 | M3 | 160 ₹14,560 Lowest | 166 ₹15,106 |
| 8.00Add :- GST @ 18% | |||||
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
14 Dec 2023, 3:00 pmClosed
Assistant Commisssioner, East Zone
East Zone, Coimbatore Corporation
Reconstruction of SWD at VOC st -2,3,4 in ward no 51 , Eastzone
2023_MAWS_397973_15
E9/EASTZONE/2023
Open Tender
Civil Works
Works
90 days
East Zone, Coimbatore Corporation
As per the tender conditions attached
3 documents required · 3 mandatory
₹0
₹5,000
12 May 2026
11 Dec 2023
15 Dec 2023
11 Dec 2023
14 Dec 2023
11 Dec 2023
Amount
Dismantling the Old Damaged Cement Concrete as per the direction of the departmental officers.
Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS
Cement concrete 1:4:8 (one cement, four sand and eight aggregater) using 40mm BSS HBG metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS
Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet)
Cement concrete 1:3:6 (one cement, three sand and six aggregater) using 20mm BSS HBG metal and including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS
Plastering with cement mortar 1: 5 mix (One cement and five sand) 12 mm thick including cost and conveyance of all materials,finishing,curing,and all labour chargesetc.completeas Standard specification.
Conveyance of the excavated earth work and including all cost etc complete.,
Add :- GST @ 18%
KAARDEEP ENGINEERING
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
ITB.pdf
Additional Documents • 0.06 MB
BOQ_473929.xls
BOQ • 0.27 MB
ez-e9-SWD.pdf
Tender Documents • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .