| 1 | L1₹17.6 LAccepted-AOC 3 24 SOUTH STREET ORAKKADU VILLAGE ORAKKADU POST ORAKKADU TAMIL NADU 607103 | ORAKKADU | CUDDALORE | TAMIL NADU | 607103 | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.2 L+₹63,076.90 (3.59%)Rejected-AOC NO 33 PILLAYAR KOIL ST PULIYAMBEDU CHENNAI 77 | CHENNAI | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/s. PCN CONSTRUCTIONS L1 | M/s. New Mohana Constructions L2 |
|---|---|---|---|---|---|
| 1.00Construction of CC Drainage with 2 Culvert at Edapalayam Gravelmedu Kamarajar Street at Alamathy Panchayat | |||||
| 2.00 | Earth Work Excavation including cost and conveyance and all materials and all labour charges etc,.Completed. | 193.6 | Cum | 263.68 ₹51,048 Lowest | 350 ₹67,760 |
| 3.00 | Supply and Filling with River Sand including cost and conveyance and all materials and all labour charges etc,.Completed. | 26.6 | Cum | 2,141.23 ₹56,957 Lowest | 2,500 ₹66,500 |
| 4.00 | C.C 1:4:8 Mix using 40mm HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed. | 26.6 | Cum | 5,890.59 ₹1,56,690 Lowest | 5,890.59 ₹1,56,690 Lowest |
| 5.00 | CC 1:3:6 Mix Using 20mm HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed. | 75.9 | Cum | 6,641.64 ₹5,04,100 Lowest | 7,000 ₹5,31,300 |
| 6.00 | Supplying and fabricating and placing in position MS or RTS reinforcement works | 1.12 | MT | 91,858.5 ₹1,02,882 Lowest | 91,858.5 ₹1,02,882 Lowest |
| 7.00 | Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly | 15.3 | Cum | 9,612.29 ₹1,47,068 Lowest | 9,612.29 ₹1,47,068 Lowest |
| 8.00 | Supply and Erecting of Centering including cost and conveyance and all materials and all labour charges etc,.Completed. | 708 | Sqm | 547.5 ₹3,87,630 Lowest | 547.5 ₹3,87,630 Lowest |
| 9.00 | Plastering with Cement Mortar 1:4 20 mm thick 10 m2 including cost and conveyance and all materials and all labour charges etc,.Completed. | 140.8 | Sqm | 595.5 ₹83,846 Lowest | 595.5 ₹83,846 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 2,68,239.78 ₹2,68,239.78 Lowest | 2,77,861.68 ₹2,77,861.68 |
Tender Value
₹17.8 L
EMD Value
₹35,600
Closing Date
14 Jan 2026, 3:00 pmClosed
Block Development Office
Block Development Office Sholavaram
Construction of CC Drainage with 2 Culvert at Edapalayam Gravelmedu Kamarajar Street at Alamathy Panchayat
2026_RDTN_642229_1
CMDA 72/2026/A2
Open Tender
Civil Works
Works
90 days
Sholavaram
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹35,600
Yes
18 Feb 2026
12 Jan 2026
14 Jan 2026
12 Jan 2026
14 Jan 2026
12 Jan 2026
Construction of CC Drainage with 2 Culvert at Edapalayam Gravelmedu Kamarajar Street at Alamathy Panchayat
Earth Work Excavation including cost and conveyance and all materials and all labour charges etc,.Completed.
Supply and Filling with River Sand including cost and conveyance and all materials and all labour charges etc,.Completed.
C.C 1:4:8 Mix using 40mm HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed.
CC 1:3:6 Mix Using 20mm HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed.
Supplying and fabricating and placing in position MS or RTS reinforcement works
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly
Supply and Erecting of Centering including cost and conveyance and all materials and all labour charges etc,.Completed.
Plastering with Cement Mortar 1:4 20 mm thick 10 m2 including cost and conveyance and all materials and all labour charges etc,.Completed.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
document.pdf
Tender Documents • 0.74 MB
BOQ_769373.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .