| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC lowest quoted |
| 2 | L1₹1.8 CrRejected-Finance | ₹1.8 Cr | L1 | Rejected-Finance work allotted to another bidder |
| 3 | L1₹1.8 CrRejected-Finance | ₹1.8 Cr | L1 | Rejected-Finance work allotted to another bidder |
| 4 | L1₹1.8 CrRejected-Finance | ₹1.8 Cr | L1 | Rejected-Finance work allotted to another bidder |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
8 Mar 2023, 12:00 pmClosed
CHD, Irrigation, BTC
CHD, Irrigation, BTC, Kokrajhar
Dakhingaon Dable FIS (Headworks appurtenant works) under PMKSY_HKKP for the year 2021-22
2023_BoTC_29365_10
CHDI/ ET/2022-23/10
Open Tender
Civil Works
Works
365 days
Sidli
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹4.0 L
Yes
3 May 2023
17 Feb 2023
8 Mar 2023
17 Feb 2023
8 Mar 2023
18 Feb 2023
Amount
Construction of Canal Lining (BC- 4 & 5) (A) Earthwork in all soils in canal embankment & bed filling as per designed section grade by truck carriage for a minimum distance of 4km including paying compensation of earth obtained from private,if any, loading unloading spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungles,removing trees upto 15cm dia & uprooting of stumps etc, from the seat of embankment breaking clods to not more than 10cm cube,dressing roughening,the seat of embankment,breaking clods to not more than 10cm cubes proffilling etc.with all lead and lift complete as directed(12.5% shrinkage allowence to be considered). (ii) Carriage upto lead of 30 M and lift upto 1.50 M
Earthwork in excavation in irrigation canal to the design section andgrade by depositing the spoils in the form of embankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal free from allvegetation includingbreakingclodsnot morethan 10 mm cube, ramming, dressing and roughening the seat of the embankment with a lead upto 30 M and lift upto 1.50 M, complete as directed.
Labour for preparation of sub grade of lined canal section as per design, drawing and grade ramming and rolled to level and according to the required cross section of the canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed and side for lining including watering to obtain required moisture content where necessary etc. complete as directed. i) For Ordinery Soil.
Collection and supply of hard river gravel of size 13 mm to 38 mm including carriage required thickness including ramming and dressing the seat before laying the materials complete as directed including all local carriage etc. complete as directed.
Labour for spreading hard river gravel/ broken stone of size 13 mm to 38 mm to required thickness including ramming and dressing the seat before laying the materials as directed including all local carriage etc. complete as directed. (For Minor Works)
C.C. work in lined canal in prop. 1:2:4 with river shingles of size 6 mm to 20 mm free from dust, dirt and other forign materials confirming IS 2116- 1965 and 542- 1962 as specified by the department, water used for mixig the mortar should be free from all impurities including laying the concrete over subgrade, moistured throughly by hand placing/ mechanical placing in canal of not more than 3 m side with suitable joints in between including providing bed sleepers (cast in situ or pre cust ) under joints with providing all sealing materials as per design and drawing before laying concrete including finishing the surface smooth, clean of all impurities with curing the bed by manual labour and side by sprinkling for at least 28 days etc. complete as directed. (Proper arrangment for obtaining clean water should be made at site).
Construction of Regulator for BC- 1 & 2 (3 Numbers) Earth work in excavation in foundation of canal structures in all types of soil as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head lead to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). (A) In all types of soils (except soil mixed with gravel and boulders). (i) For normal lead of 30m and lift of 1.50m.
C.C. work in proportion 1:3:6 in foundation/ abutment/ piers/ wing walls etc. with hard river shingles of size 13mm to 38mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). i) With shuttering & without dewatering
ii) Without shuttering & without dewatering
R.C.C. work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6mm to 20mm with propoer reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying, fitting, fixing and laying reinforcement (TATA) in position in R.C.C. works including cutting, bending, cranking with two plies 0.91M (20 BWG) annealed wire hooking, tying complete as directed.
Earth Work in back filling of structures with earth obtaining from out side borrow pits filling with 15cm layers ramming, dressing and watering including paying compensation of land if any (with lead up to 30m & lift 1.5m).
12mm thick cement plastering including clearing surface and curing, complete as directed. (ii) In proprtion 1:3
Supplying, fitting, fixing of steel gate of Head and Cross Regulators as per drawing and specification including supplying steel beams, channel section, rubber seal etc including all materials embeded partly where necessary and manually operated hoisting equipment including carriage of all materials to work site complete as directed.
Kumar Ravi Jaiswal
BIRENDRA BRAHMA
Sanjib Kr. Das
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .