Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.6 LAccepted-AOC | 1 | Accepted-AOC L-1 | |
| 2 | 2₹4.1 L+₹49,202 (13.8%)Rejected-AOC 76 NEAR NSCB COLLAGE PATAKEDA SARNI DISTT BETUL M P | 2 | Rejected-AOC l-2 | |
| 3 | 3₹4.1 L+₹57,698 (16.2%)Rejected-Finance MATHARDEV WARD PATHAKHEDHA SARNI BETUL MP 460001 | BETUL | MADHYA PRADESH | 460001 | 3 | Rejected-Finance L-3 | |
| 4 | 4₹4.5 L+₹89,558 (25.1%)Rejected-Finance MATHARDEV WARD PATHAKHEDHA SARNI BETUL MP 460001 | BETUL | MADHYA PRADESH | 460001 | 4 | Rejected-Finance L-4 | |
| 5 | 5₹4.5 L+₹91,682 (25.7%)Rejected-Finance | 5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | CAREWELL CONSTRUCTION L5 | UNITED ENGINEERING L6 | NIGAM CONSTRUCTION L3 | R.K.CONSTRUCTION L2 | TAPASYA ENGINEERING L1 | VIKRAM CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Fabrication & erection work of interconnection platforms in 3 rows and approach for ash level indicators From H1 to H9 Hopper in AB & CD Pass of ESP , at 08 Mtr. elevation along with painting of support structure i.e. Channel, angle I Beam etc. for Unit#11, STPS, Sarni. | 24 | MT | 2,02,560 ₹2,39,020.8 | 2,64,000 ₹3,11,520 | 1,87,200 ₹2,20,896 | 1,81,200 ₹2,13,816 | 1,65,600 ₹1,95,408 Lowest | 2,01,600 ₹2,37,888 |
| 2.00 | Fabrication of Hoist Protection Roof for FD & PA Fan Hoist at 09 Mtr. elevation along with painting of support structure i.e. Channel, angle I Beam etc. for Unit# 10 & 11, STPS, Sarni | 18 | MT | 1,51,920 ₹1,79,265.6 | 1,98,000 ₹2,33,640 | 1,40,400 ₹1,65,672 | 1,34,100 ₹1,58,238 | 1,17,000 ₹1,38,060 Lowest | 1,51,200 ₹1,78,416 |
| 3.00 | Fabrication & erection work of interconnection platforms of Cold End of Air Preheater at 09 Mtr. elevation along with painting of support structure i.e. Channel, angle I Beam etc. for Unit# 10 & 11, STPS, Sarni | 3 | MT | 25,320 ₹29,877.6 | 33,000 ₹38,940 | 23,400 ₹27,612 | 28,500 ₹33,630 | 19,503 ₹23,013.54 Lowest | 25,200 ₹29,736 |
Tender Value
₹5.0 L
EMD Value
₹10,100
Closing Date
4 May 2022, 3:00 pmClosed
CE GEN
STPS Sarni
Fabrication and erection work of interconnecting platforms in 3 rows and approach for Ash level indicator from H1 to H9 hopper in AB and CD pass of ESP Unit no. 11, STPS Sarni.
2022_MPPGC_184713_1
WT-3746
Open Tender
Miscellaneous Works
Item Wise
90 days
work
As per PQR
5 documents required · 5 mandatory
₹500
Yes
₹10,100
Yes
9 Oct 2025
11 Apr 2022
6 May 2022
11 Apr 2022
4 May 2022
11 Apr 2022
Fabrication & erection work of interconnection platforms in 3 rows and approach for ash level indicators From H1 to H9 Hopper in AB & CD Pass of ESP , at 08 Mtr. elevation along with painting of support structure i.e. Channel, angle I Beam etc. for Unit#11, STPS, Sarni.
Fabrication of Hoist Protection Roof for FD & PA Fan Hoist at 09 Mtr. elevation along with painting of support structure i.e. Channel, angle I Beam etc. for Unit# 10 & 11, STPS, Sarni
Fabrication & erection work of interconnection platforms of Cold End of Air Preheater at 09 Mtr. elevation along with painting of support structure i.e. Channel, angle I Beam etc. for Unit# 10 & 11, STPS, Sarni
R.K.CONSTRUCTION
NIGAM CONSTRUCTION
VIKRAM CONSTRUCTION
CAREWELL CONSTRUCTION
UNITED ENGINEERING
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .