| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.1 LAccepted-Finance | 1 | Accepted-Finance OK | |
| 2 | 2₹13.9 L+₹1.7 L (14.2%)Accepted-Finance | 2 | Accepted-Finance OK | |
| 3 | Rejected-Technical 01 BELKHARIYA KA PURA DURGA BAZAR DURGA BAZAR MIRZAPUR MIRZAPUR UTTAR PRADESH 231001 | MIRZAPUR | UTTAR PRADESH | 231001 | - | Rejected-Technical Not complete terms and condations |
Tender Value
Refer Docs
EMD Value
₹32,000
Closing Date
22 Feb 2020, 2:00 pmClosed
Executive Engineer
Executive Engineer HQ
Dismantling transportion of transformer, Re-winding repairing of tap changer centrifusing of oil and Installation of transformer
2020_DOLBU_434714_1
Jalkal /56 /EE HQ / Transformer
Open Tender
Electrical Work/ Equipment
Item Rate
30 days
Jalkal Vibhag Kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
Jalkal Vibhag Kanpur
₹32,000
Yes
13 Mar 2020
13 Feb 2020
22 Feb 2020
13 Feb 2020
22 Feb 2020
13 Feb 2020
Dismantling , Transportation of Transformer ,Re-winding Repairing of tap changer Centrifusing of Oil and Re-Installation of transformer (33 /6.6 KV, 3 MAV 0 at Gangabarrage as follows ……..
Dismantling of 3 MVA ,33 /6.6 KV ,Transformer from its base of transformer foundation loading and carting and unloading up to workshop with Labour ,T & P etc.
Opening of transformer housing and associted parts of workshop complete Re-winding of transformer (3 MVA , 33 /6.6 KV) core coil material at H.T side of all three phase & repairing of tap changer including servicing and overhauling ( cost including after deduction of existing coper wnding ) as per direction of Engineer in charge with Labour ,T & P etc.
Centrifusing of existing oil in transformer ( Filtration ) supply and filling of transformer up to required level as per Engineer in charge with Labour ,T & P etc .
All testing of transfomer at wokshop after complete repairing assembling ,filling of transformer Oil etc in presence of Engineer in charge at workshop with Labour , T & P etc.
Loading Unloading Transportation and Re- Installation of transformer from workshop to the site (Upon the transformer foundation base ) and testing of transformer on load at site Gangabarrage Raw-water sub substation
Testing Commissioning and trial run for one month on load at site .
J P ELECTRICAL INDUSTRIES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .