Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | L1 | Accepted-Finance OK | |
| 2 | L2₹3.4 L+₹69,030 (25.7%)Accepted-Finance CW 545 SANJAY GANDHI TRANSPORT NAGAR NEW DELHI 110042 | NORTH | DELHI | 110042 | L2 | Accepted-Finance OK |
Tender Value
Refer Docs
EMD Value
₹9,000
Closing Date
18 Nov 2023, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE (EnM) HP-II
OFFICE OF THE EXECUTIVE ENGINEER (EnM) HP-II DELHI JAL BOARD GOVT OF NCT OF DELHI HAIDER PUR WATER WORKS, DELHI 110085
Renovation of existing electrical system and allied works at CWPH HP-II (South)
2023_DJB_250115_5
NIT 07 (2023-24) HP-II
Open Tender
Miscellaneous Works
Item Rate
60 days
EE HP II HAIDER PUR WATER WORKS
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DELHI JAL BOARD
₹9,000
Yes
1 Dec 2023
10 Nov 2023
18 Nov 2023
10 Nov 2023
18 Nov 2023
10 Nov 2023
Renovation of Tripping system of the HT Panel by providing and fixing of Power Packs System for the HT Panel including installation work with all material and consumables as per requirement.
Making the incoming power supply to the new Power Packs and making of required outgoing connections complete with providing the copper flexible wires / cables and all the required material as per requirement.
Testing and commissioning of the Power Packs for the power supply to the Tripping system of the H T Panel as per site requirement.
Dismantling completely the old Bus Coupler ACB of 3200 Amp from the Main LT Panel complete with the housing after disconnecting the mounting and joints with the main bus bars connections after taking proper shut down of the L. T. Panel. Dismantling all the connections required to discharge the Circuit breaker completely.
Dismantling completely the old outgoing ACB of 1000 Amp from the main LT Panel complete with the housing after disconnecting the mounting and joints from the main bus bars and the outgoing cable connections after taking proper shut down of the one side of the LT. Panel. Dismantling all the connections required to discharge the Circuit breaker completely.
Fixing the new ACB of 3200 Amperes rating ( Provided by the deptt.) with complete cradle in the bus coupler chamber in proper manner including supply and fixing of material and consumables for installation with complete work as required for mounting and fixing of the cradle / ACB as required.
Fixing the new ACB of 1000 Amperes rating ( provided by the deptt.) with complete cradle in the chamber in proper manner including supply and fixing of material and consumables for installation with complete work as required for mounting and fixing of the cradle / ACB as required.
Dismantling the existing bus bars arrangement of 3200 A ACB. Alteration / Modification of Bus Bar arrangement along with addition of required Bus Bar lengths in Aluminum construction of suitable cross section / measurement as required for retrofitting of ACB and making the joints between the both incomers and the new ACB as required for making all the connections of supply arrangement including bending / cutting / shaping of the bus bars as required. The job includes providing of nut-bolts , removing of old damaged control wiring and other consumables as per site requirement.
Dismantling the existing bus bars arrangement of 1000 A ACB. Alteration / Modification of Bus Bar arrangement along with addition of required Bus Bar lengths in Aluminum construction of suitable cross section / measurement as required for retrofitting of ACB and making the joints between the main bus bars and the new ACB and for making the provisions at outgoing sides of new ACB for cable joints as required for making all the connections of supply arrangement including bending / cutting / shaping of the bus bars as required. The job includes providing of nut-bolts, removing of old damaged control wiring and other consumables as per site requirement.
Dismantling the old door of the ACB chamber and fabrication and fixing of the new door fabricated in CRCA Sheet complete of size as suitable for the 3200 Amperes ACB and with suitable cut out for ACB operation and complete with painted through powder coating and complete with other accessories like locks, hinges etc. as required.
Dismantling the old door of the ACB chamber and fabrication and fixing of the new door fabricated in CRCA Sheet complete of size as suitable for the 1000 Amperes ACB and with suitable cut out for ACB operation and complete with painted through powder coating and complete with other accessories like locks, hinges etc. as required.
Providing and fixing of the under voltage tripping arrangement with required material and accessories etc. for reconditioning of the tripping system in case of power failure of the newly installed 1000 Amperes and existing ACBs along with making complete wiring connections as per site requirement. Testing the system for under voltage tripping.
Testing and Commissioning of the newly installed ACB at No Load and then at ON Load for required operation and power supply to the connected motors as per site requirement.
Devraj Enterprises
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .