| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.9 CrAccepted-Finance | ₹10.9 Cr | 1 | Accepted-Finance Accepted |
| 2 | 2₹12.9 CrAccepted-Finance | ₹12.9 Cr | 2 | Accepted-Finance Accepted |
| 3 | 3₹13.5 CrAccepted-Finance | ₹13.5 Cr | 3 | Accepted-Finance Accepted |
| 4 | 4₹13.5 CrAccepted-Finance 101 DDA MARKET PHASE III PKT B ASHOK VIHAR NORTH WEST DELHI 110052 | NORTH WEST | DELHI | 110052 | ₹13.5 Cr | 4 | Accepted-Finance Accepted |
| 5 | 5₹13.6 CrAccepted-Finance | ₹13.6 Cr | 5 | Accepted-Finance Accepted |
Tender Value
₹17.5 Cr
EMD Value
₹35.0 L
Closing Date
4 Mar 2020, 3:00 pmClosed
Executive Engineer, CD-VI
EE CD-VI Bharat Nagar Office Complex Delhi-52
1. Resurfacing of inspection road of Right Marginal Embankment from RD 0 m to RD 10500 m (From Haryana Border to Hiranki Village Rainy Well No.4), (Revised). 2. Remodelling of existing pucca ramps along Right Marginal Embankment (RME) from RD 0m
2020_IFC_188298_1
EE/CD-VI/ACS-152/2019-20
Open Tender
Civil Works
365 days
Delhi
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹35.0 L
Yes
15 May 2020
18 Feb 2020
4 Mar 2020
18 Feb 2020
4 Mar 2020
18 Feb 2020
Amount
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge: All kinds of soil.
Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of Engineer-in-charge.
Providing and laying RMC of M-30 grade By using minimum 340kg of cement(43 grade, OPC) per cum of concrete in roads / streets manufactured in automatic RMC plant using coarse sand and graded stone aggregate of 20mm nominal size in appropriate proportion as per approved design criteria including transportation to site in transit mixer, including cost of admixture in recommended proportion as per IS9103 to accelerate/ retard setting of concrete to improve workability with out impairing strength and durability as per specification including spreading and compacting mechanically by using needle and surface vibratos, leveling to required slope & camber, finishing by floating & brooming with wire brushes etc. and curing including making provision for contraction / expansion, construction of cross / longitudinal joints of size 10mm wide 50mm deep by groove cutting machine, providing and filling joints with approved joint filler and sealants, etc. complete, as per direction of Engineer in-charge. (Cost of joint filler & sealants shall be paid for separately under relevant items).Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately M-30 RMC by using minimum cement @340 kg/cum. Cement concrete manufactured in automatic batching plant (RMC plant) including transportation to site in transit mixer.
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On bituminous surface @ 0.50 Kg I sqm.
Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50% (percentage by weight of tota mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.
Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity
Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres. With common burnt clay F.P.S. (non modular) bricks of class designation 7.5.
Painting road surface marking with adequate nos of coats to give uniform finish with ready mixed road marking paint conforming to IS : 164, on bituminous surface in white/yellow shade, including cleaning the surface of all dirt, scales, oil, grease and foreign material etc. complete. New work (Two or more coats).
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil.
Providing and laying in position ready mixed plain cement concrete, using cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Note : (1) Excess/less cement used than specified in this item is payable/ recoverable separately.M-10 grade plain cement concrete (cement content considered @ 220 kg/cum).
Providing and laying in position ready mixed M-30 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level.
Providing and laying in position ready mixed M-30 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works above plinth level upto floor II level.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo Mechanically Treated bars.
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres.
Supplying and stacking at site.90 mm to 45 mm size stone aggregate.
Supplying and stacking at site.63 mm to 45 mm size stone aggregate.
Supplying and stacking at site.53 mm to 22.4 mm size stone aggregate.
Supplying and stacking at site.Stone screening 13.2 mm nominal size (Type A)
Supplying and stacking at site.Stone screening 11.2 mm nominal size (Type B).
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density .
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On W.B.M. @ 0.75 Kg / sqm.
Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Supply of good earth at site including excavation, royalty, loading, unloading and banking the same in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers and rolling every 3rd and top most layer with power roller of minimum 8 tonne and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions including carriage of earth by mechanical transport with all leads and lifts.
A S INFRATECH
competent construction company
M C Construction Co
Harpal Singh
SHOKEEN CONSTRUCTION CO.
Chaudhary Construction Company Private Limited
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid