Loading…
Loading…
Tender Value
₹47.5 L
EMD Value
₹95,100
Closing Date
31 Aug 2026, 5:00 pm3d left
Suprintending Engineer
SE MGCCC Moradabad
Construction of Drainage Syphon at Km 1.760 of Escape of Chandausi Branch.
2026_UPIDC_1177359_1
06/SE/2026-27
Open Tender
Civil Works
Item Wise
Sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹95,100
Moradabad
20 Aug 2026
20 Aug 2026
1 Sept 2026
20 Aug 2026
31 Aug 2026
20 Aug 2026
21 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in wet soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches. | 0.8 | cum | 132 | ₹105.6 |
| 2 | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 0.4 | cum | 6,006.2 | ₹2,396.47 |
| 3 | Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 0.8 | cum | 6,913.2 | ₹5,530.56 |
| 4 | Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 0.8 | sqm | 500 | ₹400 |
| 5 | Providing and laying 1200 mm Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. Complete. | - | RM | 7,390.04 | - |
| 6 | Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. complete. | 1 | MT | 72,805.2 | ₹72,732.39 |
| 7 | Earth work in filling or in embankment in ordinary soil, excavation to be in the form of regular pits and eath work in embankment to be in 20 cm layers including ramming and dressing the surface to be required level, slopes and also including 1.50 m lift and 30 m lead including cost of earth, all T&P, laour, cartage beyond 600 m but within 1 Km distance, loading, unloading etc. all complete for proper completion of work as directed by Engineer-in- Charge. | 1 | cum | 185.65 | ₹185.46 |
| 8 | Providing weep holes in abutment & wing walls including supply of all material,labour,T. & P. etc required for proper completion of work. | - | No | 714.45 | - |
| 9 | Providing Brick on Edge pitching (Kharanja in cement moratar) including supply of all material,labour, etc required for proper completion of work. | 0.8 | sqm | 561.15 | ₹448.92 |
| 10 | Providing & Laying of Coarse sand in graded filter including cost of all material, labour and T&Ps etc. complete required for proper complition of work | 1 | cum | 2,838.8 | ₹2,835.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.68 MB
Tenderbook1760div09.pdf
Tender Documents • 3.49 MB
BOQ_2212643.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].