Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Qualified |
| 2 | Accepted-Technical | Accepted-Technical Technically Qualified |
| 3 | Accepted-Technical 112 FIRST FLOOR NAVAYUG MARKET GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | Accepted-Technical Technically Qualified |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.2 Cr
EMD Value
₹2.7 L
Closing Date
22 Dec 2025, 5:00 pmClosed
General Manager
UPSIDA Head Office Kanpur, General Manager
Repair of Road Paradise Plastic Enterprises ltd. to Public (Road no-06) and Aayu International Pvt. Ltd. to Substation (Road no-10) at IA Site-5 Distt G.B. Nagar
2025_SIDC_1095279_1
CD_II_369_DT_25112025
Open Tender
Civil Works
Percentage
120 days
G.B. Nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,557
UPSIDA
₹2.7 L
9 Jan 2026
2 Dec 2025
22 Dec 2025
2 Dec 2025
22 Dec 2025
2 Dec 2025
Supply & Stacking of 45-63 mm gauge approved stone ballast (10cm loose) for patches & top coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer -in- Charge.
Supply & Stacking of 22.4-53 mm gauge approved stone ballast (10cm loose) for patches & top coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer -in- Charge.
Supply & Stacking of crushed stone dust for consolidation of stone ballast as screening material including octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
Consolidation of 45-63 mm gauge hard stone ballast for 10cm (loose) thick inter coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge.
Consolidation of 22.4-53 mm gauge hard stone ballast for 10cm (loose) thick top coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water aiso including labour for spraying screening material to be used for blinding purpose and also ineluding cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor hinself at his own cost as per direction of Engineer-in-charge.
Brick edging on the side of the road of first class bricks 70m, Wide 11cm deep. Laid with mud mortar including labour & supply of bricks finished to the requred template and in proper alignment and also including dressing and rammimng the execavated earth as direeted by the Engineer-in-charge.
Providing and applying primer coat with VG-10 bitumen on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. As per morth SI no 502
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 505 complete in all respects. Unit = Cum/Sqm including tack coat using bitumin @ .20kg per Sqm 50mm Compected Thickness
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading. gremied with bituminous binder @ 5.4 percent of mix and filler,transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507 complee in all respects. . Unit = Cum/Sqm including tack coat using bitumin @ .20kg per Sqm. 25mm Compected Thickness
Providing and laying of hot applied thermoplastic compound 2.5 mm thiick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exelusive of surfaee applied glass beads as per IRC:35 The finished Surfaee to be level uniform and free from streaks and holes. Rates are inclusibe of all taxes. royalty etc. all T&P/machine material and labour required for proper completion of work.
Providing and fixing Glow studs of size 100x200mm made of heavy duty body shall be moulded ASA (Acrylic styrene acryloretrite) or HIP (High impact polystyrene) or ABS having electronically welded microprismatic lens with abrasion resistant coating as approved by engineer in charge the glow stud shall support a load of 13635kg rested in accordance with ASTM D4280. Tslope of ratro-reflective surface shall be 35 (+/05) degress to base. The reflective panels on both sides with at least 12cm of reflective area up each side. The luminance intensity should be as per the specificatio and shall be tested as described in ASTM 1:809 as recommended in BS: 873 part 4:1973. The studs shall be fixed to the road surface using the adhesive conforming to IS as per procedure recommended by the munufacturer complete and as per direction of of Engineer-in-charge.
Providing and laying factory made chamfered edge Cement Concrete paver blocks (80mm thick M-40 grade) in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in- Charge.
Concrete with 2cm gauge stone grit , coarse and cement in proportion of 4:2:1 including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
feeformat.xls
Tender Documents • 0.02 MB
BOQ_2014612.xls
BOQ • 0.31 MB
etenderdocument.pdf
Tender Documents • 1.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .