Loading…
Loading…
Tender Value
₹15.5 L
EMD Value
₹31,000
Closing Date
10 Aug 2026, 2:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
S AND T
9 conditions · 2 needing a document upload
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII, IX, XI, VIA, VIB, VI and Annexure-V and Annexure-V(A) of GCC-2022 respectively. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are requested to go through the following documents which are available in upload/View Documents in Home page of IREPS portal for works tenders before submitting the e-tender. 1. General Instruction for E-Tenders on works contract--Chapter- I 2. Special Condition-General- Chapter-II
Opening of e-tender : 1. The e-tenders will be opened online using the IREPS portal anytime after tender closing time. No representative is required to be present for opening of e-tender and taking notes of rates quoted and ranking as the complete details of rates etc. of all the bidders shall be available to the bidders through the website after the opening of the tender. 2. The earnest money cost is to be paid through online banking facilities through the online portal and by giving the other details online on website www.ireps.gov.in. Note: For more details refer to Cl: 4 & 12 of General Instruction-Chapter-I for Submission of EMD, Cost of Tender Document and opening of e- tender.
Asansol Division: Comprehensive Annual Maintenance Contract (CAMC) of Statcon Electronics make IPS (04 Nos.) at Andal EI Hut No. 4 & 5, West Empty Yd. Cabin/Andal, East Dn. Cl. Cabin/Andal with OEM/Authorised dealer of OEM for three (03) Years.
37-SDSTE-ASN-2026-27
37-SDSTE-ASN-2026-27
Single
Works - General
36 Months
Paschim Bardhaman, West Bengal
₹0
₹31,000
10 Aug 2026
15 Jul 2026
27 Jul 2026
3 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 15,48,583.2 | ||
| — | 48.00 | — | — | ||
| Comprehensive Annual Maintenance of Statcon make IPS (04 nos.) at Andal EI Hut No. 4 & 5, West Empty Yd. Cabin/Andal, East Dn. Cl. Cabin/Andal for Three years, i.e., for 48 quarter year period. It includes preventive maintenance as well as rectification of all types of failures of the system. All the required components/modules pertaining to the system as described below will be supplied by the contractor for maintenance and rectification of failures. i) SMPS based FRBC Panel. a) FRBC module- 110V 20 AMP: 5 Each / as available at site. b) Any other parts of SMPS Panel like Switch, Meters, DSA unit. ii) AC Distribution Panel: a) AVR - 3.0 KVA-1.0 KVA - 2 nos. / as available at site b) Inverter - 1.0 KVA - 2 nos. / as available at site c) Step Down Transformer 230/110V- 1000VA/500VA - 7 nos. / as available at site d) Auto Changeover Board. e) Any other component of AC Distribution Panel. iii) Station master's monitoring Panel with its Interfacing System with IPS: 1 No. iv)DC Distribution panel: a) DC - DC Converter 24 - 32V, 10AMP/5 AMP-9 Nos./as available at site. b) DC - DC Converter 12 - 28V, 5 AMP or 1 AMP -4 Nos./as available at site. c) DC - DC Converter 12 - 40V 1 AMP -4 Nos./as available at site. d) DC - DC Converter 3 - 6V 1 AMP -4 Nos./as available at site. e) DC - DC Converter 2 - 12V 5 AMP -2 Nos./as available at site. v) Spare Parts of IPS. vi) Lightning Arrestor or Surge Protection Device of all kinds. vii) Cooling fan present in SMR and Inverter. viii)Fuse, connectors , meters, alarm & indications, PCB. ix) Any other parts of IPS not mentioned above but present at Station. Note.-The numbers of components/ modules and their ratings mentioned are typical only. It may vary from Station to Station. NOTE: Rate is for 01 no. IPS for 01 quarter period. In Item Qty & unit 48 quarters means CAMC of 4 nos. IPS for three years (12 quarter period). | — | — | — | 15,48,583.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022.pdf
ATTACHMENT
GCC Correction Slip 1
ATTACHMENT
GCC Correction Slip 2
ATTACHMENT
mergedGCCCorrectionslip3456.pdf GCC Correction Slip 3456
ATTACHMENT
MergedGCCCorrectionSlip78910.pdf GCC Correction Slip 7 8 9 10
ATTACHMENT
GCCCorrectionslip11.pdf
ATTACHMENT
2018-CE-I-CT-9dtd.pdf
ATTACHMENT
AllAnnexure.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14.07.2022.pdf
ATTACHMENT
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf
ATTACHMENT
mergedGCCCorrectionslip3456.pdf
ATTACHMENT
MergedGCCCorrectionSlip78910.pdf
ATTACHMENT
Annexure-C.pdf
ATTACHMENT
CheckList.pdf
ATTACHMENT
STATCON-IPS_2.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .