| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.3 CrAdmitted-Finance | -4.55% | ₹17.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹17.3 CrAdmitted-Finance | -4.35% | ₹17.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹17.4 CrAdmitted-Finance | -4.10% | ₹17.4 Cr | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹18.1 Cr
EMD Value
₹18.1 L
Closing Date
6 Jun 2026, 6:00 pmClosed
CHIEF ENGINEER KANPUR
CHIEF ENGINEER KANPUR
CIVIL, SANITARY AND DRAINAGE WORK FOR MULTI-STOREY BUILDING COMPLEX, NADAR GANJ, AMAUSI, DISTT LUCKNOW
2026_MSME_1154780_1
22/CE/26-27
Open Tender
Civil Works
Percentage
540 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹42,710
Executive Engineering UPSIC KANPUR
₹18.1 L
KANPUR
17 Jul 2026
27 May 2026
8 Jun 2026
27 May 2026
6 Jun 2026
27 May 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART -A (Civil Work) | - | - | - | - |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 4,688.83 | Sqm | 14.32 | ₹67,144.05 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil. | 3,377.78 | Cum. | 144.42 | ₹4,87,818.99 |
| 4 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
All kinds of soil | 1,198.9 | Cum | 103.17 | ₹1,23,690.51 |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also inclu ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete | 3,377.78 | Cum | 159.48 | ₹5,38,688.35 |
| 6 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 202.15 | Cum | 569.96 | ₹1,15,217.41 |
| 7 | Antitermite treatment of soil under floors using chemical emulsion @ one liter per hole, 300 apart @100 Nos hole per 9.0 Sqm. includding drilling 12mm diameter holes and plugging also to match the floor properly:
(Including with chlorpyriphos / Lindane E. C. 20% with 1% concentration.) | 1,554.47 | Sqm | 97.64 | ₹1,51,778.45 |
| 8 | Providing and laying damp-proof course 40 mm thick with cement concrete 1 : 2 : 4 (1 cement: 2 coarse sand (zone-Ill) derived from natural sources: 4 graded stone aggregate 12.5 mm nominal size derived from natural sources) | 175.54 | Sq.m. | 334.29 | ₹58,681.27 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 329.57 | Cum. | 5,542.6 | ₹18,26,674.68 |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in charge; for the following grades of concrete.
All Works upto plinth level :
Concrete of M25 grade with minimum cement content of 330 kg /cum
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | 854.39 | Cum. | 7,733.56 | ₹66,07,476.33 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_2163083.xls
BOQ • 0.60 MB
NITFlattedFactoryCivilWork.pdf
Tender Documents • 1.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].