Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.2 LAccepted-AOC 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L1 | Accepted-AOC l1 | |
| 2 | Rejected-Technical KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | - | Rejected-Technical As per TCR | |
| 3 | Rejected-Technical DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical As per TCR |
Tender Value
₹41.6 L
EMD Value
₹52,000
Closing Date
8 Feb 2025, 9:00 amClosed
Area Engineer (EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Repairing, supply, maintenance and installation of motors, transformers, TSUs, Switches, VCBs, Starter, energy meters, relays and overhead line in Khottadih Colliery under Pandaveswar Area.
2025_ECL_327226_1
GM-PND/EandM/24-25/210/1109 dated 28/01/2025
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Khottadih Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹52,000
27 Feb 2025
29 Jan 2025
10 Feb 2025
29 Jan 2025
8 Feb 2025
29 Jan 2025
29 Jan 2025 - 1 Feb 2025
Amount
Repairing & Rewinding 45KW/60HP, 550v, 3ph 1475 RPM KE make motor Sl.No - 29303018-1, M-36 . (Inclusive of EPF/CMPF)
Cost of super copper enamel wire
Cost of insulation require against copper (25% of copper cost)
Labour cost for insulation(15% of copper cost)
Cost of striping Motor damaged copper conductor (15% of copper cost)
Cost of winding of motor (20% of copper cost)
Repairing of bearing journal at rotor shaft.
Repairing of bearing housing both side by CI elctrode 3 Kg
Less Scrap Value
OH & Profit
Transportation charge (Up & Down)
Repairing & Rewinding 110 KW, 550v, 3ph 1482 RPM KE make motor Sl.No- 29304029/1 at Khottadih Colliery. (Inclusive of EPF/CMPF)
Cost of copper superanamel wire (SIZE- 18 No SWG)
Cost of insulation require against copper (25% of copper cost)
Labour cost for insulation(20% of copper cost)
Cost of striping Motor damaged copper conductor (15% of copper cost)
Cost of winding of motor (20% of copper cost)
Miscellaneous cost (20% of copper cost)
Less Scrap Value
OH & Profit
Transportation charge (Up & Down)
Repairing & Rewinding 225 KW 3ph 1480 RPM Marathon make Induction Motor Sl.No- 3FF660792 at khottadih Colliery. (Inclusive of EPF/CMPF)
Cost of super copper enamel wire
Cost of H.T grade insulation materials i.e Univernished glass sleeving, glass mica tape, nomex , glass tape, glass clothe, PMP tape, cotton tape etc
Labour charge for making of new coils as per old coils
Labour charge for striping out the damaged copper conductor
Labour charge for winding the motor as per original shape & size
Miscellaneous cost i.e silphos brazing rod, silcon base glass wedges glass leads DA & Oxygen etc.
cost of making & re-meatallisation of worn out bearing journal of rotor shaft
cost of making & re-meatallisation of bearing housing as per bearing size
Cost of making rotor ring and its connections
Less Scrap Value
OH & Profit
Transportation charge (Up & Down)
Repairing & Rewinding of 315 kva ,6.6kv/550V Andrew Yule make Transwitch unit Sl. No. F2P/TS/005 T202 at Khottadih Colliery. (Inclusive of EPF/CMPF)
Dismantaning of core & winding from transformer tank
supply of new electrolyte grade 210/95 swg copper strips for primary coils
Cleaning of copper strips of secondry coils with removel of old insulation.
Re-insulation cost of primary & secondry coils with removal of old insulation.
Supply of f-class insulation materials such as glass fiber board face separatore, oil duct etc.
Re-formation of primary and secondry coils (borral type).
Supply of f-class wooden forma for formation of primary and secondary coils size 40/9 and 38/15 inch
supply of ELMO LUFT 1A - FD class varnish
supply of 234 SDS thinner
Re-assembly of new coil with inter connetion with copper blazzing , backing /heating properly to improve IR value upto requires level.
Repairing of tap changer switch.
Testing charge of Transformer
Painting of inner side of transformer by red oxide anti corrosive red oxide (paint & 2coat of metallice paints (Gray )
Less old unused copper stripes burnt primary coil
OH & Profit
Transportation and handling charges
Repairing & Rewinding of 500KVA, 11KV/440V 3 phase, Electric Construction and Equipment Co. Ltd make Power Transformer at Khottadih Colliery. (Inclusive of EPF/CMPF)
Dismantling of core & winding from Transformer Tank after out of Transformer oil opening of top cover etc
Supply of new electrolyte grade copper conductor for primary coil
Cleaning & de-carbonizing of existing copper conductor by manila paper tape
Re-insulation of primary & secondry copper conductor by manila paper tape
Cost of insulating materials, varnish press ponde paper, oil duct, cotton tape, webbing tape etc.
Provinding neoprene gasket of top cover, inspection cover insulator etc.
Cost of brazing rupaton rod, oxygen, DA for brazing of all the primary and secondary conductor
Reformation of coil primary & secondary (18 Nos primary & 03 nos Secondary coils)
Fitting of core chanels , primary & secondary coils, & winding in to the Transformer tank.
De-hydration and and filtration of Tranformer oil
Testing of the transformer.
Less old unused copper stripes burnt primary coil
OH & Profit
EPF/PF
Transportation and handling charges
Repairing & Rewinding of 500KVA, 11KV/550V 3 phase Power Transformer at Khottadih Colliery. (Inclusive of EPF/CMPF)
Dismantling of core & winding from Transformer Tank after out of Transformer oil opening of top cover etc
Supply of new electrolyte grade copper conductor for primary coil
Cleaning & de-carbonizing of existing copper conductor by manila paper tape
Re-insulation of primary & secondry copper conductor by manila paper tape
Cost of insulating materials, varnish press ponde paper, oil duct, cotton tape, webbing tape etc.
Provinding neoprene gasket of top cover, inspection cover insulator etc.
Cost of brazing rupaton rod, oxygen, DA for brazing of all the primary and secondary conductor
Reformation of coil primary & secondary (18 Nos primary & 03 nos Secondary coils)
Fitting of core chanels , primary & secondary coils, & winding in to the Transformer tank.
De-hydration and and filtration of Tranformer oil
Testing of the transformer.
Less old unused copper stripes burnt primary coil
OH & Profit
EPF/PF
Transportation and handling charges
Repairing of 190KW,550v Sait Mine Line Dol Sl.No- F1-1332 stater at Khottadih Colliery. (Inclusive of EPF/CMPF)
Supply and fitting of Amps Meter2. 1/2 round (150/5)
Supply and fittingThermal over load relay
Supply and fitting of 150/5 CT(5VA)
Supply and fitting of 550 volt Earth leakage Relay
Supply and fitting of Eltieliment push & switch
Supply and fitting 12 volt indicator lamp
Supply and fitting Testing of P.T (550v to 8,12v)
Supply and fitting of H.R.C fuse
Supply and fitting of single phase priventor relay
Supply and drawing of copper wire for wiring
Supply and fitting of nuts and bolts
Labour Charge
OH & Profit
Installation of 6.6kv energy meter in FLP encloser with safety feature for Khottadih Colliery(Inclusive of EPF/CMPF)
Door mounting Energy metre(make: Schneider)
Current transformer (400/5) 10VA
Indication lamp
MCB 6Amps
Wiring terminal
Gras fuse base terminal
Terminal channel
3Phase Potential Transformer 6.6KV/110Volts
3mm Grass fibre sheet
Potential Transformer Base fitting channel Engel (5x3inchx3fit
Complete servicing of VCB along with fitting and testing of above supplied materials
Auxiliary wiring wire with lugs socket and Nat bolt insulated taps etc.
Painting charges
EPF/PF
OH & Profit
Repairing and maintenance of 6.6KV for SHCM , LHCM and 11KV over head line by changing of pole, bracket, stay set and conductor for under Khottadih colliery. (Inclusive of EPF/CMPF)
Dismantling of Pipe Pole
Erection of 08 mtr Long PCC Pole
Transportation of 08 mtr Long PCC pole from store to worksite
Supply & eraction stay set complete with necessary require materials
Supply, fabrication and erection of MS brackets made of MS angel
Supply, fabrication and erection of MS clamp made of MS flat pati
Supply and fitting of Polymer Disc insulator with required hardware
Supply and fitting of Polymer Pin insulator with required hardware
Supply of ACSR Dog Conductor
Supply and drawing of ACSR Rabbit Conductor
Supply and fitting of polymer gang operating switch 3 ph 3 post type 11kv grade 400 amp
Supply and fitting of heat shrink cable joint
Dismantling, shifting & installation of 500KVA Transformer
Supply and fitting of Nuts, bolts and washer of different size
OH & Profit
New Establishment of jelly Filled Earth Pit at 33 kV Substation. (Inclusive of EPF/CMPF)
Making of Jelly Filled Earth Pit
OH & Profit
Repairing of 440 volt over head line by replament of rail pole, changing of conductor and bracket at Chattisgonda nazrul manch under Khottadih Colliery. (Inclusive of EPF/CMPF)
Erection of 08 mtr Long PCC Pole
Transportation of 08 mtr Long PCC pole from store to worksite
Supply & eraction stay set complete with necessary require materials
Supply, fabrication and erection of MS brackets made of MS angel
Supply, fabrication and erection of MS clamp made of MS flat pati
Supply and fitting of shackel insulator with required hardware
Supply of ACSR Rabbit Conductor
Supply & fixing of different size nuts & bolts & washer
OH & Profit
Repairing and maintenance of 440v over head line by changing of pole, bracket, stay set and conductor at different places of Khottadih Colliery like CM line, Lal Building and Suk Bazar Colony. (Inclusive of EPF/CMPF)
Dismantling of Rail Pole
Erection of 08 mtr Long PCC Pole
Transportation of 08 mtr Long PCC pole from store to worksite
Supply & eraction stay set complete with necessary require materials
Supply, fabrication and erection of MS brackets made of MS angel
Supply, fabrication and erection of MS clamp made of MS flat pati
Supply and fitting of Shackel Insulator with required hardware
Supply of ACSR Conductor
Supply and fitting of different size nuts bolt and washer
OH & Profit
Repairing of 100 Amp, 6.6kv, 3 ph Andrew Yule Make VCB Sl.No- KTD/VCB/015 at Khottadih Colliery (Inclusive of EPF/CMPF)
Door Mounting Earth Leakage Relay
Indication
Supply of HT Bushing
Supply of HRC fuse for HT PT
Supply of current Tranformer (CTR+100/5)
Supply of Ammetre
Supply of voltmeter
Supply of incoming & outgoing jumper with socket
Supply of core Balace Transformer (CBT)
Supplyof vaccum relay of suitable range
Supply of vaccum contect holder
Repairing /rewinding of PT (3.3KV/110v)
Supply of connector (30 Amps. 12 way)
Supply of Shunt Trip Coil Assy
Supply of of pvc flexible copper wires of suitable grade
Supply of materials for cleaning & de-carbonizing
Supply of PVC adhesive tape, Non-adeshive tape, Mica Tape, HT tape etc
Supply of Paint & thinner and MS nut Bolt
Repairing and testing charges
OH & Profit
Transporting Charge both side
Repairing of 02 nos of 6.6KV Mine Line make FLP VCB of Khottadih Colliery. (Inclusive of EPF/CMPF)
Potentials Transformer 6.6KV/230-110 500VA
Numerical over Current relay
12KV Vacuum Interrupter
Incoming Terminal 6.6kv grid
Through Terminal 6.6KV grid
Outgoing Terminal 6.6KV grid
Inter connecting Terminal 6.6KV grid
Voltmeter 6.6/110
Ammeter 400/5Amps
Axially Switch 6NO/6NC
Element Switch
Fuse Insulator
Fuse Clip
P.T Fuse big size (make: Busman)
P.T Fuse Small size (Make: Busman)
Rotary switch Test/Run
L type 6way Terminal
Space Hater 100watt
Ply relay 8pin
Basbar Supporting Insulator
Limited Switch 1NO/1NC
MCB 6Amps 3phase
Grass fable sheets Separator
Limited Switch 2NO/2NC
Thermal over load relay 3Amps/7.5Amps
Current Transformer Lt side 200/5Amps
VCB Supporting Insulator
Complete servicing of VCB along with fitting and testing of above supplied materials
Painting charges
EPF/PF
OH & Profit
Supply and fitting of earth leakage relay in 6.6kv Andrew Yule make VCB of Khottadih Colliery. (Inclusive of EPF/CMPF)
SUPPLY AND FITTING OF BASE MOUNTED EARTH LEAKAGE RELAY (RNGE-1Amps-5Amps)WITH TIME DELAY AND AUXILIARY SUPPLY (0-110 Volts AC) (Make:NOVAGO)
OH & Profit
Supply and fitting of PT and energy meters in khottadih Colliery. (Inclusive of EPF/CMPF)
Supply and fitting of epoxy resin cast PT, 1PH, Ratio: 6.6KV/110-220v, 300VA
Supply and fitiing of epoxy resin cast PT, 1PH, Ratio: 6.6KV/0-110/0-12V, 750VA
Supply and fitting of fuse H.T. 6.6KV 2AMPS(Make :Anand Fuses)
Supply and fitting of 3ph, energy meter 60 Amp
Supply and fitting of 1 phase energy meter 60 amps
OH & Profit
Total impact of GST for the purpose of CTC
BABLU SINHA (BID ID -1125447)
NANDI ENTERPRISE (BID ID -1125444)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .