| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Risposive |
| 2 | Accepted-Technical | Accepted-Technical Risposive |
| 3 | Accepted-Technical | Accepted-Technical Risposive |
Tender Value
₹6.3 L
EMD Value
₹64,000
Closing Date
4 Mar 2026, 12:00 pmClosed
DD, RTR/DFO Chitrakoot
Office of DD, RTR/DFO Chitrakoot
Construction work of Type-1 building (Forest Guard Chowki) at Jamwant Eco-Tourism Centre, Markundi-2 Range
2026_UPDFW_1120002_1
3516/39-1-(Type-1, Markundi-2), Dt. 25.02.26
Open Tender
Civil Works - Others
Fixed-rate
30 days
Jamwant Eco-Tourism Centre, Markundi-2 Range
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Divisional Forest Officer Chitrakoot
₹64,000
20 Mar 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1TYPE-I QUARTER | |||||
| 1.01 | Earth work in excavation in foundation in B.C. Soil For Side wall including lead 30.00 mtr and lift 1.5 mtr. | 20.31 | m3 | 120 | ₹2,437.2 |
| 1.02 | Laying of sand / moorum filling in base of building including watring dressing supply of all materials labour T&P etc. (S.O.R No 255) | 5.94 | m3 | 1,000 | ₹5,940 |
| 1.03 | C.C. 1:4:8 cement sand mortar and 45-63mm gauge stone ballast including supply of all approved matarials labour T&P etc.(S.O.R No 273) | 5.94 | m3 | 4,200 | ₹24,948 |
| 1.04 | R.C.C column in 1:1.5:3 cement sand and mortar 10-20 mm stone grit including cost of all materials labour T&Petc. (S.O.R No 283) | 1.06 | m3 | 7,200 | ₹7,632 |
| 1.05 | R.C.R Stone mesonery work in 1:4 cement sand mortar and stone khanda including cost of all materials labour T&P etc. | 10.4 | m3 | 3,800 | ₹39,520 |
| 1.06 | R.C.C Plinth Beam work in 1:1.5:3 cement sand and 10-20 mm stone grit including cost of all materials labour T&Petc. (S.O.R No 283) | 2.47 | m3 | 7,200 | ₹17,784 |
| 1.07 | R.C.C Column and lintal work in 1:1.5:3cement sand and 10-20 mm stone grit including cost of all materials labour T&Petc. (S.O.R No 283) | 2.98 | m3 | 7,200 | ₹21,456 |
| 1.08 | Class - 150 brick work in 1:4 cement and sand mortar including supply of all approved matarials labour T&P etc.( S.O.R No 302) | 16.81 | m2 | 5,400 | ₹90,774 |
| 1.09 | R.C.C Slab beam in 1:1.5:3 cement sand and mortar 10-20 mm stone grit including cost of all materials labour T&Petc. (S.O.R No 283) | 1.67 | m2 | 7,200 | ₹12,024 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
TechnicalDocument.pdf
Tender Documents • 1.39 MB
BOQ_2083230.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .